Opening the dossier…
Opening the dossier…
Contractor dossier
346 projects on file, including joint ventures this contractor is part of.
Total projects
346
Total budget
₱3B
Average progress
93.4%
Completion rate
80.1%
Average risk score
36.3
Medium risk on average, out of 100
Flagged as unusual
17
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 346 | ₱3B | 36.3 | 17 | 93.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 155 | ₱768.6M | 29.3 | 1 | 94.4% |
| Roads | 114 | ₱1B | 37.6 | 4 | 94.1% |
| Flood Control and Drainage | 55 | ₱999.7M | 39.9 | 0 | 92.4% |
| GAA 2025 SSP | 10 | ₱116.7M | 90.2 | 9 | 70.3% |
| Bridges | 7 | ₱33.7M | 36.1 | 0 | 100.0% |
| OTHER | 5 | ₱59.7M | 72.7 | 3 | 95.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0068CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MACAYUG,SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱2.9M | 100% | High risk85 | —-0.021 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AJ0071ACCESS ROAD LEADING TO ST. VINCENT FERRER STATUE, BICAL NORTE-TANOLONG-INANLORENZA ROAD LINE, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.7M | 100% | High risk73 | —-0.011 |
| 23AJ0107CONSTRUCTION OF ROAD, BRGY. TAMBAC, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.6M | 100% | High risk73 | —-0.033 |
| 25AJ0017CONSTRUCTION OF ROAD, BARANGAY SANCAGULIS, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk68 | —-0.034 |
| 22AJ0053CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CRUZ, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk68 | —-0.057 |
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 22AJ0059CONSTRUCTION OF LOCAL ROAD, BRGY. PIAS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.056 |
| 22AJ0066CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. GAMATA, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk66 | —-0.058 |
| 17AI0159CONCRETING OF BRGY. SUMABNIT ROAD, BRGY. SUMABNIT, BINALONAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱6.1M | 100% | High risk65 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 24A00627CONSTRUCTION OF MULTI-PURPOSE BUILDING (STUDENT CENTER), BAYAMBANG CAMPUS - PANGASINAN STATE UNIVERSITY | Region I | Region I | On-Going | ₱9.8M | 35% | Medium risk44 | Flagged0.014 |
| 24AH0194CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BARANGAY MACAYUG, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.7M | 50% | Medium risk39 | Flagged0.013 |
| 24AH0156CONCRETING OF BRGY. POBLACION TO BRGY.SAN GONZALO FMR,BRGY.POBLACION AND BRGY. SAN GONZALO,LABRADOR, | Region I | Pangasinan 2nd DEO | On-Going | ₱5M | 87% | Medium risk40 | Flagged0.013 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 24AH0147CONCRETING OF BRGY.ANONANG FMR, BRGY. ANONANG, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.5M | 100% | Medium risk44 | Flagged0.005 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AH0175CONCRETING OF BRGY. STA. INES FMR, BRGY. STA. INES, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.4M | 78% | Medium risk46 | Flagged0.003 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 21AH0045CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY LOBONG, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.4M | 100% | Low risk17 | —-0.069 |
| 302 | 20AH0151CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. EMBARCADERO, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.5M | 100% | Low risk17 | —-0.067 |
| 303 | 20AH0152CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.5M | 100% | Low risk17 | —-0.069 |
| 304 | 20AH0101CONSTRUCTION OF DRAINAGE SYSTEM,BRGY. SAN GUILLERMO,SAN JACINTO,PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.5M | 100% | Low risk17 | —-0.074 |
| 305 | 21AH0044CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. IMELDA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱947.5K | 100% | Low risk17 | —-0.071 |
| 306 | 20AH0100CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. STA.MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱984K | 100% | Low risk17 | —-0.069 |
| 307 | 20AH0102CONSTRUCTION OF DRAINAGE SYSTEM, BRGY.SAN ROQUE SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱982K | 100% | Low risk17 | —-0.074 |
| 308 | 21AH0130CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. NIBALIW CENTER, SAN FABIAN,PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱949.9K | 100% | Low risk17 | —-0.069 |
| 309 | 21AJ0037CONCRETING OF LOCAL ROAD, BARANGAY TANOLONG, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.086 |
| 310 | 21AH0042CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY CAPAOAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱946.5K | 100% | Low risk17 | —-0.072 |
| 311 | 19AJ0086CONSTRUCTION OF LOCAL ROAD, BRGY. BALAYONG, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.086 |
| 312 | 19AJ0076CONSTRUCTION OF ROAD, BARANGAY PANGDEL, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.087 |
| 313 | 19AH0153CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY NIBALIW VIDAL, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.089 |
| 314 | 19AJ0068CONCRETING OF ROAD, BARANGAY BAKITIW, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.084 |
| 315 | 19AI0048CONSTRUCTION OF BADIPA ELEM. SCHOOL MPB (COVERED COURT), BADIPA, URDANETA CITY, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.087 |
| 316 | 19AH0040CONCRETING OF ROAD, BRGY. MAYOMBO, DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.089 |
| 317 | 19AI0104CONSTRUCTION OF POBLACION WEST MULTI-PURPOSE BUILDING (COVERED COURT), POBLACION, BAUTISTA, PANGASIN | Region I | Pangasinan 3rd DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.088 |
| 318 | 21AH0031CONST'N. OF MULTI-PURPOSE BUILDING(SENIOR CITIZENS BLDG.)AT BRGY. BOLOSAN, DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.086 |
| 319 | 21AH0032CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY AWAI, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.3M | 100% | Low risk16 | —-0.086 |
| 320 | 20AH0092CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.5M | 100% | Low risk16 | —-0.088 |
| 321 | 20AH0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA. CRUZ, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.5M | 100% | Low risk16 | —-0.087 |
| 322 | 21AH0026CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT) AT BRGY. PALUA,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.4M | 100% | Low risk16 | —-0.083 |
| 323 | 20AH0077CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BUCAO, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.5M | 100% | Low risk16 | —-0.088 |
| 324 | 21AH0017CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING(BRGY. HALL),BRGY.ANONANG,SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.4M | 100% | Low risk16 | —-0.086 |
| 325 | 20AH0087CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MATULONG, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱1.5M | 100% | Low risk16 | —-0.083 |