Contractor dossier
346 projects on file, including joint ventures this contractor is part of.
Total projects
346
Total budget
₱3B
Average progress
93.4%
Completion rate
80.1%
Average risk score
36.3
Medium risk on average, out of 100
Flagged as unusual
17
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 346 | ₱3B | 36.3 | 17 | 93.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 155 | ₱768.6M | 29.3 | 1 | 94.4% |
| Roads | 114 | ₱1B | 37.6 | 4 | 94.1% |
| Flood Control and Drainage | 55 | ₱999.7M | 39.9 | 0 | 92.4% |
| GAA 2025 SSP | 10 | ₱116.7M | 90.2 | 9 | 70.3% |
| Bridges | 7 | ₱33.7M | 36.1 | 0 | 100.0% |
| OTHER | 5 | ₱59.7M | 72.7 | 3 | 95.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0068CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MACAYUG,SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱2.9M | 100% | High risk85 | —-0.021 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AJ0071ACCESS ROAD LEADING TO ST. VINCENT FERRER STATUE, BICAL NORTE-TANOLONG-INANLORENZA ROAD LINE, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.7M | 100% | High risk73 | —-0.011 |
| 23AJ0107CONSTRUCTION OF ROAD, BRGY. TAMBAC, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.6M | 100% | High risk73 | —-0.033 |
| 25AJ0017CONSTRUCTION OF ROAD, BARANGAY SANCAGULIS, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk68 | —-0.034 |
| 22AJ0053CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CRUZ, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk68 | —-0.057 |
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 22AJ0059CONSTRUCTION OF LOCAL ROAD, BRGY. PIAS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.056 |
| 22AJ0066CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. GAMATA, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk66 | —-0.058 |
| 17AI0159CONCRETING OF BRGY. SUMABNIT ROAD, BRGY. SUMABNIT, BINALONAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱6.1M | 100% | High risk65 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 24A00627CONSTRUCTION OF MULTI-PURPOSE BUILDING (STUDENT CENTER), BAYAMBANG CAMPUS - PANGASINAN STATE UNIVERSITY | Region I | Region I | On-Going | ₱9.8M | 35% | Medium risk44 | Flagged0.014 |
| 24AH0194CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BARANGAY MACAYUG, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.7M | 50% | Medium risk39 | Flagged0.013 |
| 24AH0156CONCRETING OF BRGY. POBLACION TO BRGY.SAN GONZALO FMR,BRGY.POBLACION AND BRGY. SAN GONZALO,LABRADOR, | Region I | Pangasinan 2nd DEO | On-Going | ₱5M | 87% | Medium risk40 | Flagged0.013 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 24AH0147CONCRETING OF BRGY.ANONANG FMR, BRGY. ANONANG, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.5M | 100% | Medium risk44 | Flagged0.005 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AH0175CONCRETING OF BRGY. STA. INES FMR, BRGY. STA. INES, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.4M | 78% | Medium risk46 | Flagged0.003 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24AH0006ASSET PRESERVATION-PREVENTIVE MAINT.DAGUPAN-BONUAN-SAN FABIAN RD.K0380+603-K0381+133,K0383+420-K0386 | Region I | Pangasinan 2nd DEO | Completed | ₱52.2M | 100% | Medium risk48 | —-0.086 |
| 52 | 22AH0067CONST'N.OF DRAINAGE SYSTEM ALONG PANG.-LA UNION NATIONAL HIGHWAY(MANGALDAN SECT.)FROM BRGYS.POBLACIO | Region I | Pangasinan 2nd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.070 |
| 53 | 21AJ0025CONSTRUCTION OF SLOPE PROTECTION ALONG INGALERA RIVER, BARANGAY AGDAO, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.070 |
| 54 | 19AI0008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGAMUSING RIVER, BRGY. CASANTIAGOAN, LAOAC, PANGASINA | Region I | Pangasinan 3rd DEO | Completed | ₱18.5M | 100% | Medium risk47 | —-0.074 |
| 55 | 19AI0014RETROFITTING/STRENGTHENING OF BRIDGE-MARABOC BRIDGE (B01962LZ) ALONG MANGALDAN-MANAOAG-BINALONAN ROA | Region I | Pangasinan 3rd DEO | Completed | ₱7.9M | 100% | Medium risk47 | —-0.051 |
| 56 | 19AI0013RETROFITTING/STRENGTHENING OF BRIDGE-DON TEOFILO SISON BRIDGE (B01961LZ) ALONG MANGALDAN-MANAOAG-BIN | Region I | Pangasinan 3rd DEO | Completed | ₱4.7M | 100% | Medium risk47 | —-0.050 |
| 57 | 20AH0183CONSTRUCTION OF FOOTBRIDGE CONNECTING PUBLIC MARKET PLAZA, MUNICIPAL HALL AND DISTRICT HOSPITAL, LIN | Region I | Pangasinan 2nd DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.049 |
| 58 | 25AH0134REHABILITATION OF RIVER BANK PROTECTION, BRGY. CABAYAOASAN, MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | Medium risk47 | —-0.010 |
| 59 | 23AH0149CLUSTER NO. III - REPAIR/ REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS IN DESIGNATED KEY PRODUCTIONS AREAS: 1. CONCRETING OF BRGY. ALITAYA FMR, BRGY. ALITAYA, MANGALDAN, PANGASINAN; 2. CONCRETING OF BRGY. CABANBANAN FMR, BRGY. CABANBANAN, MANAO | Region I | Pangasinan 2nd DEO | Completed | ₱29.8M | 100% | Medium risk47 | —-0.029 |
| 60 | 25AJ0081CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CACARITAN CREEK, BARANGAY CACARITAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.4M | 86% | Medium risk46 | —-0.036 |
| 61 | 25AJ0082CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAN JUAN RIVER, BARANGAY MESTIZO NORTE, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.4M | 83% | Medium risk46 | —-0.036 |
| 62 | 25AJ0067CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PANAMINDITAAN CREEK, BARANGAY TALANG, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.3M | 90% | Medium risk46 | —-0.039 |
| 63 | 25AJ0089CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAN JUAN RIVER, BARANGAY PALOSPOS, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.1M | 100% | Medium risk46 | —-0.045 |
| 64 | 22AH0079CONSTRUCTION OF MAMALINGLING BRIDGE AT BARANGAY MAMALINGLING, DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.051 |
| 65 | 18AI0352CONSTRUCTION OF TWO STOREY SIX CLASSROOM SCHOOL BUILDING SAN BLAS E/S, VILLASIS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.046 |
| 66 | 25AJ0056CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG INGALERA RIVER, BARANGAY CABATLING, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱42.5M | 90% | Medium risk46 | —-0.038 |
| 67 | 21A00175REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE (PHASE 2) ALONG RIVER, DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.070 |
| 68 | 19AH0084CONSTRUCTION OF RIVER BANK PROTECTION BRGY. LELEMAAN, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.075 |
| 69 | 25AJ0053CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY MALIOER, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱28.4M | 100% | Medium risk46 | —-0.071 |
| 70 | 25AJ0077CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGNO RIVER, BONGATO WEST SECTION, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.2M | 100% | Medium risk46 | —-0.044 |
| 71 | 25AH0175CONCRETING OF BRGY. STA. INES FMR, BRGY. STA. INES, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.4M | 78% | Medium risk46 | Flagged0.003 |
| 72 | 25AH0003CONSTRUCTION OF RIVERBANK PROTECTION ALONG ALORAGAT RIVER, BARANGAY NALSIAN, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱28.8M | 81% | Medium risk46 | —-0.033 |
| 73 | 24AJ0101CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN ANO ELEMENTARY SCHOOL, BRGY. ANO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱5.9M | 98% | Medium risk46 | —-0.006 |
| 74 | 20AJ0077CONSTRUCTION OF PANTOL-SAN GABRIEL ROAD, BRGY. PANTOL, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.093 |
| 75 | 24AJ0114CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN CANDIDO MARCELLANO INTEGRATED SCHOOL, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱24.4M | 90% | Medium risk46 | —-0.002 |