Contractor dossier
346 projects on file, including joint ventures this contractor is part of.
Total projects
346
Total budget
₱3B
Average progress
93.4%
Completion rate
80.1%
Average risk score
36.3
Medium risk on average, out of 100
Flagged as unusual
17
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 346 | ₱3B | 36.3 | 17 | 93.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 155 | ₱768.6M | 29.3 | 1 | 94.4% |
| Roads | 114 | ₱1B | 37.6 | 4 | 94.1% |
| Flood Control and Drainage | 55 | ₱999.7M | 39.9 | 0 | 92.4% |
| GAA 2025 SSP | 10 | ₱116.7M | 90.2 | 9 | 70.3% |
| Bridges | 7 | ₱33.7M | 36.1 | 0 | 100.0% |
| OTHER | 5 | ₱59.7M | 72.7 | 3 | 95.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0068CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MACAYUG,SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱2.9M | 100% | High risk85 | —-0.021 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AJ0071ACCESS ROAD LEADING TO ST. VINCENT FERRER STATUE, BICAL NORTE-TANOLONG-INANLORENZA ROAD LINE, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.7M | 100% | High risk73 | —-0.011 |
| 23AJ0107CONSTRUCTION OF ROAD, BRGY. TAMBAC, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.6M | 100% | High risk73 | —-0.033 |
| 25AJ0017CONSTRUCTION OF ROAD, BARANGAY SANCAGULIS, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk68 | —-0.034 |
| 22AJ0053CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CRUZ, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk68 | —-0.057 |
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 22AJ0059CONSTRUCTION OF LOCAL ROAD, BRGY. PIAS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.056 |
| 22AJ0066CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. GAMATA, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk66 | —-0.058 |
| 17AI0159CONCRETING OF BRGY. SUMABNIT ROAD, BRGY. SUMABNIT, BINALONAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱6.1M | 100% | High risk65 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 24A00627CONSTRUCTION OF MULTI-PURPOSE BUILDING (STUDENT CENTER), BAYAMBANG CAMPUS - PANGASINAN STATE UNIVERSITY | Region I | Region I | On-Going | ₱9.8M | 35% | Medium risk44 | Flagged0.014 |
| 24AH0194CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BARANGAY MACAYUG, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.7M | 50% | Medium risk39 | Flagged0.013 |
| 24AH0156CONCRETING OF BRGY. POBLACION TO BRGY.SAN GONZALO FMR,BRGY.POBLACION AND BRGY. SAN GONZALO,LABRADOR, | Region I | Pangasinan 2nd DEO | On-Going | ₱5M | 87% | Medium risk40 | Flagged0.013 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 24AH0147CONCRETING OF BRGY.ANONANG FMR, BRGY. ANONANG, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.5M | 100% | Medium risk44 | Flagged0.005 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AH0175CONCRETING OF BRGY. STA. INES FMR, BRGY. STA. INES, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.4M | 78% | Medium risk46 | Flagged0.003 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 25AJ0024CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MALIMPEC, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.6M | 100% | Medium risk45 | —-0.072 |
| 102 | 22AH0112REHABILITATION OF RIVERBANK PROTECTION ALONG ALORAGAT RIVER AT BRGY. NALSIAN,MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.074 |
| 103 | 24AH0056CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY BARI, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.072 |
| 104 | 24AH0010ASSET PRESERVATION-PREVENTIVE MAINT.-JUDGE JOSE DE VENECIA BOULEVARD EXT'N.RD.-K0376+124-K0378+357,D | Region I | Pangasinan 2nd DEO | Completed | ₱24.7M | 100% | Medium risk45 | —-0.086 |
| 105 | 25AH0002CONSTRUCTION OF EMBANKMENT PROTECTION AT SAN FABIAN RIS, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.4M | 76% | Medium risk45 | —-0.033 |
| 106 | 19AH0049CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. BINDAY SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱23.3M | 100% | Medium risk45 | —-0.073 |
| 107 | 20AH0170CONST'N./IMPROV'T./REHAB. OF SITIO DIMANTAL,HACIENDA RD.BRGY. HACIENDA,BUGALLON, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱14.4M | 100% | Medium risk44 | —-0.087 |
| 108 | 22AH0130CONSTRUCTION OF ROAD AT BRGY. ANONANG, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk44 | —-0.090 |
| 109 | 23AH0040CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY BAGONG PAG-ASA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.074 |
| 110 | 21AJ0045ROAD WIDENING ON SECONDARY ROADS ALONG VILLASIS-MALASIQUI-SN CARLOS RD, K0195+000-K0195+478, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱21.5M | 100% | Medium risk44 | —-0.089 |
| 111 | 23AJ0122CONCRETING OF ROADS - A. BRGY. IDONG, BAYAMBANG PANGASINAN; B. BRGY. ABONAGAN, MALASIQUI, PANGASINAN; C. BRGY. LASIP, MALASIQUI PANGASINAN; D. BRGY. LUNEC, MALASIQUI, PANGASINAN; | Region I | Pangasinan 4th DEO | Completed | ₱19M | 100% | Medium risk44 | —-0.089 |
| 112 | 23AH0041CONSTRUCTON OF DRAINAGE SYSTEM AT BARANGAY CAYANGA , SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.071 |
| 113 | 24AH0157CONCRETING OF BRGY.BANAOANG TO BRGY. BARI FMR,BRGY.BANAOANG AND BRGY. BARI, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱14.9M | 100% | Medium risk44 | —-0.034 |
| 114 | 24A00627CONSTRUCTION OF MULTI-PURPOSE BUILDING (STUDENT CENTER), BAYAMBANG CAMPUS - PANGASINAN STATE UNIVERSITY | Region I | Region I | On-Going | ₱9.8M | 35% | Medium risk44 | Flagged0.014 |
| 115 | 19AJ0117CONSTRUCTION OF ONE (1) STOREY, FIVE (5) CLASSROOM SCHOOL BUILDING AT J.C. MACARANAS E/S, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.3M | 100% | Medium risk44 | —-0.044 |
| 116 | 21A00166PREVENTIVE MAINTENANCE ALONG MANGALDAN-MANAOAG-BINALONAN RD, K0205+275 - K0206+1079 | Region I | Region I | Completed | ₱18.2M | 100% | Medium risk44 | —-0.089 |
| 117 | 20AJ0101CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING, PRIMICIAS NHS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱18.7M | 100% | Medium risk44 | —-0.042 |
| 118 | 21A00167PREVENTIVE MAINTENANCE ALONG PANGASINAN LA UNION INTER-PROVL RD, K0383+000-K0383+949 | Region I | Pangasinan 2nd DEO | Completed | ₱15M | 100% | Medium risk44 | —-0.087 |
| 119 | 18AJ0116CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT PRIMICIAS NHS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱18.3M | 100% | Medium risk44 | —-0.042 |
| 120 | 24AH0147CONCRETING OF BRGY.ANONANG FMR, BRGY. ANONANG, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.5M | 100% | Medium risk44 | Flagged0.005 |
| 121 | 24AJ0066REHABILITATION OF ROAD, BRGY. BONGATO WEST, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱14.3M | 100% | Medium risk44 | —-0.090 |
| 122 | 24AJ0012CONSTRUCTION OF ROAD, BARANGAY BACUNDAO EAST, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.089 |
| 123 | 19AH0201ASSET PRESERVATION-PREVENTIVE MAINT.(ASPHALT OVERLAY)ALONG URDANETA JCT'N.-DAG.-LING.RD(VIA ZAMBALES | Region I | Pangasinan 2nd DEO | Completed | ₱9.7M | 100% | Medium risk44 | —-0.087 |
| 124 | 24AH0002ASSET PRESERVATION-PREVENTIVE MAINT.-URDANETA JCT.-LINGAYEN RD.VIA ZAMBALES-K0374+(-515)-K0374+000,D | Region I | Pangasinan 2nd DEO | Completed | ₱10.4M | 100% | Medium risk44 | —-0.087 |
| 125 | 20AH0165CONCRETING OF CARANGLAAN-TEBENG ROAD, DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱11.5M | 100% | Medium risk44 | —-0.088 |