Opening the dossier…
Opening the dossier…
Contractor dossier
346 projects on file, including joint ventures this contractor is part of.
Total projects
346
Total budget
₱3B
Average progress
93.4%
Completion rate
80.1%
Average risk score
36.3
Medium risk on average, out of 100
Flagged as unusual
17
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 346 | ₱3B | 36.3 | 17 | 93.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 155 | ₱768.6M | 29.3 | 1 | 94.4% |
| Roads | 114 | ₱1B | 37.6 | 4 | 94.1% |
| Flood Control and Drainage | 55 | ₱999.7M | 39.9 | 0 | 92.4% |
| GAA 2025 SSP | 10 | ₱116.7M | 90.2 | 9 | 70.3% |
| Bridges | 7 | ₱33.7M | 36.1 | 0 | 100.0% |
| OTHER | 5 | ₱59.7M | 72.7 | 3 | 95.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0068CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MACAYUG,SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱2.9M | 100% | High risk85 | —-0.021 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AJ0071ACCESS ROAD LEADING TO ST. VINCENT FERRER STATUE, BICAL NORTE-TANOLONG-INANLORENZA ROAD LINE, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.7M | 100% | High risk73 | —-0.011 |
| 23AJ0107CONSTRUCTION OF ROAD, BRGY. TAMBAC, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.6M | 100% | High risk73 | —-0.033 |
| 25AJ0017CONSTRUCTION OF ROAD, BARANGAY SANCAGULIS, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk68 | —-0.034 |
| 22AJ0053CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CRUZ, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk68 | —-0.057 |
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 22AJ0059CONSTRUCTION OF LOCAL ROAD, BRGY. PIAS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.056 |
| 22AJ0066CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. GAMATA, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk66 | —-0.058 |
| 17AI0159CONCRETING OF BRGY. SUMABNIT ROAD, BRGY. SUMABNIT, BINALONAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱6.1M | 100% | High risk65 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AH0196CONSTRUCTION OF MULTI-PURPOSE BUILDING(BRGY. HALL) AT BRGY. MALABAGO,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 95% | High risk67 | Flagged0.039 |
| 25AH0061CONSTRUCTION (COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY MALUED,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk90 | Flagged0.029 |
| 25AH0057CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY MERMER,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 40% | High risk89 | Flagged0.029 |
| 25AH0072CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BOLO, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 55% | High risk89 | Flagged0.026 |
| 25AH0065CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION OESTE, DAGUPAN CITY, PANGASINA | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 60% | High risk90 | Flagged0.025 |
| 25AH0047CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BRGY. MALABAGO,MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱1.9M | 66% | High risk89 | Flagged0.023 |
| 25AH0070CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARIA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 68% | High risk90 | Flagged0.022 |
| 25AJ0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY MALABAGO, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 73% | High risk95 | Flagged0.021 |
| 24A00627CONSTRUCTION OF MULTI-PURPOSE BUILDING (STUDENT CENTER), BAYAMBANG CAMPUS - PANGASINAN STATE UNIVERSITY | Region I | Region I | On-Going | ₱9.8M | 35% | Medium risk44 | Flagged0.014 |
| 24AH0194CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BARANGAY MACAYUG, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.7M | 50% | Medium risk39 | Flagged0.013 |
| 24AH0156CONCRETING OF BRGY. POBLACION TO BRGY.SAN GONZALO FMR,BRGY.POBLACION AND BRGY. SAN GONZALO,LABRADOR, | Region I | Pangasinan 2nd DEO | On-Going | ₱5M | 87% | Medium risk40 | Flagged0.013 |
| 25AJ0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN RIVER, BOLOSAN SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AH0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱2.9M | 100% | High risk89 | Flagged0.008 |
| 24AH0147CONCRETING OF BRGY.ANONANG FMR, BRGY. ANONANG, SAN FABIAN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.5M | 100% | Medium risk44 | Flagged0.005 |
| 24AJ0048REHABILITATION FLOOC CONTROL STRUCTURES ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.7M | 91% | High risk74 | Flagged0.003 |
| 25AH0175CONCRETING OF BRGY. STA. INES FMR, BRGY. STA. INES, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.4M | 78% | Medium risk46 | Flagged0.003 |
| 24AJ0093REHABILITATION OF LOCAL ROAD, BARANGAY LASIP, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.8M | 92% | High risk76 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 20AH0009ASSET PRESERVATION-PREVENTIVE MAINT.ALONG URDANETA JCT-LING.DIV.ROAD(PEREZ BLVD.)K0209+057-K0209+280 | Region I | Pangasinan 2nd DEO | Completed | ₱9.6M | 100% | Medium risk44 | —-0.086 |
| 127 | 20AH0015ASSET PRESERVATION-PREVENTIVE MAINT.ALONG STA.BARBARA-MANGALDAN RD.K0207+728-K0208+470, MANGALDAN, P | Region I | Pangasinan 2nd DEO | Completed | ₱9.6M | 100% | Medium risk44 | —-0.088 |
| 128 | 24AH0009ASSET PRESERVATION-PREVENTIVE MAINT.MANGALDAN-MANAOAG-BINALONAN RD.-K0204+000-K0204+784,K0207+053-K0 | Region I | Pangasinan 2nd DEO | Completed | ₱11.8M | 100% | Medium risk44 | —-0.089 |
| 129 | 23AH0001ASSET-PRESERVATION-PREVENTIVE MAINT.ALONG PANG.-LA UNION INTER-PROVL.RD.-K0382+332-K0382+957,MANGALD | Region I | Pangasinan 2nd DEO | Completed | ₱12.7M | 100% | Medium risk44 | —-0.087 |
| 130 | 19AI0261CONCRETING OF ROAD, BARANGAY POGO-BARANGAY DIAZ, BAUTISTA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱14.1M | 100% | Medium risk44 | —-0.091 |
| 131 | 20AH0011ASSET PRESERVATION-PREVENTIVE MAINT.ALONG DAGUPAN-BONUAN-SAN FABIAN RD.K0379+240-K0380+073,DAGUPAN C | Region I | Pangasinan 2nd DEO | Completed | ₱9.7M | 100% | Medium risk44 | —-0.086 |
| 132 | 23AH0062ASSET PRESERVATION-REHAB./RECONST'N./UPGRADING OF DAMAGED PAVED RDS.ALONG PANG.-LU INTER PROVL RD.K0 | Region I | Pangasinan 2nd DEO | Completed | ₱13.3M | 100% | Medium risk43 | —-0.088 |
| 133 | 24AH0030IMPROVEMENT OF INTERSECTION-DAG.-BONUAN-SAN FABIAN RD.AND JUDGE JOSE DE VENECIA BLVD.EXT'N.RD.DAG. C | Region I | Pangasinan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.089 |
| 134 | 19AH0234CONST'N.OF THREE(3)STOREY-NINE(9)CLASSROOM SCHOOL BUILDING AT JUAN L. SIAPNO E/S, DAGUPAN CITY,PANGA | Region I | Pangasinan 2nd DEO | Completed | ₱25.2M | 100% | Medium risk43 | —-0.040 |
| 135 | 25AH0008CONSTRUCTION OF ROAD TONDALIGAN BAYWALK,DAGUPAN CITY,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱24M | 100% | Medium risk43 | —-0.057 |
| 136 | 21A00169PREVENTIVE MAINTENANCE ALONG PANGASINAN-LA UNION INTER-PROVL RD, K0399+628 - K0400+709 | Region I | Region I | Completed | ₱15.4M | 100% | Medium risk43 | —-0.088 |
| 137 | 23AH0008ASSET PRESERVATION-CONST'N./UPGRADING/REHAB.OF DRAINAGE ALONG PANG,-LU INTER PROVL RD.K0395+871-K039 | Region I | Pangasinan 2nd DEO | Completed | ₱14.7M | 100% | Medium risk43 | —-0.088 |
| 138 | 24AJ0061CONSTRUCTION OF ROAD, BARANGAY TABO-SILI, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.092 |
| 139 | 20AH0016ASSET PRESERVATION-PREVENTIVE MAINT.ALONG JUDGE JOSE DE VENECIA BLVD.EXT'N.RD.KO375+(-229)-KO375+423 | Region I | Pangasinan 2nd DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.086 |
| 140 | 21A00168PREVENTIVE MAINTENANCE ALONG PANGASINAN-LA UNION INTER-PROVL RD - K0389+178 - K0390+447 | Region I | Region I | Completed | ₱14.5M | 100% | Medium risk43 | —-0.086 |
| 141 | 25AH0015CONSTRUCTION OF ROAD AT BARANGAY LANDAS, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.086 |
| 142 | 24AH0038CONSTRUCTION OF ROAD INCLUDING DRAINAGE SYSTEM AT BARANGAY IMELDA, SAN JACINTO, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.091 |
| 143 | 18AH0247CONSTRUCTION OF TWO(2)STOREY,FOUR(4)CL/SB AT BARI ELEM. SCHOOL,MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.045 |
| 144 | 18AH0248CONSTRUCTION OF TWO(2)STOREY,FOUR(4)CL/SB AT EMBARCADERO ELEM.SCHOOL, MANGALDAN,PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.046 |
| 145 | 22AH0080CONSTRUCTION OF ROAD AT BARANGAY LICSI, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.091 |
| 146 | 24AH0174CONSTRUCTION OF MODIFIED STANDARD 3 STOREY, 9 CLASSROOM S/B IN CARAEL ELEM.SCHOOL,DAGUPAN CITY, PANG | Region I | Pangasinan 2nd DEO | Completed | ₱19.5M | 100% | Medium risk43 | —-0.041 |
| 147 | 18AI0307CONSTRUCTION OF RHU, POZORRUBIO RHU II, POZORRUBIO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱10.5M | 100% | Medium risk43 | —-0.046 |
| 148 | 18AI0337CONSTRUCTION OF TWO STOREY FOUR CLASSROOM SCHOOL BUILDING AGAT E/S, SISON, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱11M | 100% | Medium risk43 | —-0.046 |
| 149 | 23AH0151CONST'N.OF MODIFIED STANDARD ONE(1)STOREY,FIVE(5)CL,S/B AT LABNEY ELEM. SCHOOL,SAN JACINTO, PANGASIN | Region I | Pangasinan 2nd DEO | Completed | ₱10.6M | 100% | Medium risk43 | —-0.046 |
| 150 | 24AH0044CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BARANGAY LOBONG, SAN JACINTO,PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.091 |