Opening the dossier…
Opening the dossier…
Contractor dossier
104 projects on file, including joint ventures this contractor is part of.
Total projects
104
Total budget
₱758.2M
Average progress
100.0%
Completion rate
99.0%
Average risk score
14.8
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 70 | ₱517.1M | 11.0 | 0 | 100.0% |
| Region XIII | 33 | ₱236.1M | 21.8 | 0 | 100.0% |
| Region XI | 1 | ₱5M | 45.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 81 | ₱426.5M | 11.5 | 0 | 100.0% |
| Roads | 13 | ₱189.7M | 27.7 | 0 | 100.0% |
| Flood Control and Drainage | 8 | ₱135.4M | 24.5 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱6.7M | 24.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22LB0035CONSTRUCTION OF CONCRETE ROAD AT BARANGAY 5-A, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.091 |
| 2 | 23NG0037CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CIRCUMFERENTIAL ROAD LEADING LAKE MAINIT, MAINIT, SURIGAO DEL NORTE/BRGY. SAN ISIDRO, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱6.9M | 100% | Medium risk40 | —-0.082 |
| 3 | 21NG0023CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ ALIPAO ROAD LEADING TO MAINIT LAKE BOAT LANDING FACILITY / BRGY. ALIPAO, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱10.8M | 100% | Medium risk39 | —-0.086 |
| 4 | 18NF0126CONSTRUCTION OF FOUR-STOREY 12 CLASSROOMS (1CL + 1 LAB PER FLOOR) SCHOOL BUILDING/MALIMONO NATIONAL HIGH SCHOOL, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱35.5M | 100% | Medium risk39 | —-0.033 |
| 5 | 20NG0089CONSTRUCTION OF MULTIPURPOSE BUILDING (MUNICIPAL BLDG.) / GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱14.3M | 100% | Medium risk36 | —-0.076 |
| 6 | 18NF0117CONSTRUCTION OF TWO-STOREY (6 CLASSROOMS) SCHOOL BUILDING / SISON CENTRAL ELEMENTARY SCHOOL, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱13.4M | 100% | Medium risk36 | —-0.045 |
| 7 | 18NF0114CONSTRUCTION OF TWO-STOREY (6 CLASSROOMS) SCHOOL BUILDING / BAD-AS ELEMENTARY SCHOOL, PLACER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱13.5M | 100% | Medium risk35 | —-0.045 |
| 8 | 23NG0074CONSTRUCTION OF TWO-STOREY (6 CLASSROOMS) SCHOOL BUILDING/TUBOD NATIONAL HIGH SCHOOL, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱18.9M | 100% | Medium risk35 | —-0.037 |
| 9 | 23NG0064CONCRETING OF PUROK MAGBABAOL, BRGY. SAN ISIDRO FMR, BRGY. SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE/BRGY. SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.2M | 100% | Medium risk34 | —-0.036 |
| 10 | 23NG0081CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) SCHOOL BUILDING / TUBOD NATIONAL HIGH SCHOOL, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱13.5M | 100% | Medium risk34 | —-0.039 |
| 11 | 17NF0017CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM/ VICENTE-CABILAO ELEM.SCHOOL, BRGY.BALIBAYON, SURIGAO CITY, DAY-ASAN ELEM. SCHOOL, BRGY.DAY-ASAN,SURIGAO CITY,DAY-ASAN NATIONAL HIGH SCHOOL,BRGY.DAY-ASAN,SURIGAO CITY, OROK ELEM.SCHOOL,BRGY.OROK,SURIGAO CITY | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱3.4M | 100% | Medium risk32 | —-0.026 |
| 12 | 23NB0049CONSTRUCTION OF CLASSROOMS (2-STOREY 10 CL), STA. IRENE CENTRAL ES, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱27.9M | 100% | Medium risk32 | —-0.033 |
| 13 | 24NB0082CONSTRUCTION OF SCHOOL BUILDING IN SAN LUIS NATIONAL HIGH SCHOOL, BRGY. DOÑA MAXIMA, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk31 | —-0.039 |
| 14 | 24NB0080CONSTRUCTION OF SCHOOL BUILDING IN STA. IRENE CENTRAL ELEMENTARY SCHOOL, BRGY. STA. IRENE, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk31 | —-0.039 |
| 15 | 21MG0138CLUSTER IX-A.ROAD WIDENING-MIDSAYAP-MARBEL RD-1779+427-K1779+968, SOUTH COTABATO B.ROAD WIDENING-MIDSAYAP-MARBEL RD-K1784+100-K1784+992.57, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱41.2M | 100% | Low risk28 | —-0.088 |
| 16 | 23MG0002CLUSTER II-A.CONSTRUCTION OF CONCRETE ROAD-POBLACION T'BOLI TO BRGY. LAMHAKU LEADING TO EL KINI HOT SPRING ROAD, BRGY. LAMHAKU, T'BOLI, SOUTH COTABATO B.CONSTRUCTION OF CONCRETE ROAD-JCT. SURALLAH-LAKE SEBU ROAD LEADING TO NV VOGT SOLAR POWER PLANT, BRGY. | Region XII | South Cotabato 2nd DEO | Completed | ₱40.2M | 100% | Low risk27 | —-0.088 |
| 17 | 22MG0007ROAD WIDENING-SURALLAH-LAKE SEBU-MAITUM RD-(S00838MN) CHAINAGE 17147-CHAINAGE 18654 | Region XII | South Cotabato 2nd DEO | Completed | ₱37.9M | 100% | Low risk27 | —-0.088 |
| 18 | 24MG0011CLUSTER V-A.CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF ACCESS ROAD AND BRIDGE, BANGA, SOUTH COTABATO B.CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF ACCESS ROAD AND BRIDGE, SURALLAH, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱14.8M | 100% | Low risk26 | —-0.089 |
| 19 | 18MG0120REHABILITATION OF BRGY. MALAYA FLOOD CONTROL AND BANK PROTECTION ALONG BANGA RIVER, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱14.5M | 100% | Low risk25 | —-0.074 |
| 20 | 24MB0030CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY BALUAN, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.064 |
| 21 | 19MG0033CONSTRUCTION OF BANK PROTECTION ALONG BANGA RIVER, STA. 1+420-STA, 1+590, BRGY. PUNONG GRANDE, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱9.8M | 100% | Low risk25 | —-0.071 |
| 22 | 19MG0034CONSTRUCTION OF BANK PROTECTION ALONG BANGA RIVER, STA. 1+590-STA. 1+760, BRGY. PUNONG GRANDE, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱9.8M | 100% | Low risk25 | —-0.073 |
| 23 | 20MG0040CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BANGA RIVER, BRGY. MALAYA, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱9.8M | 100% | Low risk25 | —-0.074 |
| 24 | 25MG0039CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BARANGAY CABULING, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱33.7M | 100% | Low risk24 | —-0.074 |
| 25 | 19MG0032CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. RANG-AY, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱29.4M | 100% | Low risk24 | —-0.073 |