Contractor dossier
254 projects on file, including joint ventures this contractor is part of.
Total projects
254
Total budget
₱15.9B
Average progress
98.8%
Completion rate
88.2%
Average risk score
50.7
Medium risk on average, out of 100
Flagged as unusual
4
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 218 | ₱12.9B | 49.4 | 1 | 99.7% |
| Region IX | 21 | ₱1.8B | 62.3 | 2 | 92.8% |
| Region VI | 4 | ₱350.2M | 54.9 | 1 | 83.6% |
| Region VIII | 2 | ₱328.5M | 65.0 | 0 | 87.3% |
| Region IV-A | 2 | ₱165.4M | 56.8 | 0 | 100.0% |
| Region VII | 2 | ₱116.4M | 50.6 | 0 | 99.2% |
| Region XIII | 2 | ₱114.6M | 41.3 | 0 | 100.0% |
| Negros Island Region | 1 | ₱56.6M | 70.1 | 0 | 100.0% |
| Region XII | 1 | ₱97.4M | 37.7 | 0 | 100.0% |
| Region III | 1 | ₱59.9M | 36.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 157 | ₱10.6B | 50.9 | 2 | 99.0% |
| Flood Control and Drainage | 50 | ₱2.9B | 48.4 | 0 | 99.6% |
| Buildings and Facilities | 24 | ₱990.6M | 44.1 | 0 | 99.3% |
| Bridges | 12 | ₱569.1M | 52.7 | 0 | 93.4% |
| OTHER | 7 | ₱593.1M | 78.3 | 2 | 95.2% |
| Bridges, Roads | 3 | ₱334.4M | 56.5 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱45.1M | 45.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23JG0058SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF DUMARA BRIDGE ALONG KUMALARANG RIVER, KUMALARANG, ZAMBOANGA DEL SU | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱97.1M | 100% | High risk82 | Flagged0.018 |
| 23KJ0037CONS/IMPROV'T OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), GANDAWAN-LAKE DUMINAGAT ROAD LEADING TO LAKE DUMINAGAT, BRGYS. NUEVA VISTA-GANDAWAN & LAKE DUMINAGAT, DON VICTORIANO, MIS. OCC. PACKAGE II | Region X | Misamis Occidental 2nd DEO | Completed | ₱126.4M | 100% | High risk80 | —-0.015 |
| 24KI0080FLOOD MITIGATION PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PALILAN RIVER, PACKAGE 1, JIMENEZ, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | On-Going | ₱96.5M | 98% | High risk79 | —-0.000 |
| 23KJ0020CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, PANGUIL BAY ACCESS ROAD (SILANGA - SAN APOLINARIO SECTION), MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | High risk79 | —-0.011 |
| 23KJ0038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), ACCESS ROAD LEADING TO MANSAWAN FALLS, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | High risk79 | —-0.028 |
| 24J00158CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIBUCO RIVER, SIBUCO BR. SECTION PACKAGE 2, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱152.9M | 90% | High risk76 | —-0.012 |
| 23KJ0046CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, OZAMIZ CITY COASTAL BYPASS ROAD, MALAUBANG-PULOT-DIMALUNA SECTION, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱47.5M | 100% | High risk75 | —-0.027 |
| 24KI0087BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DULAPO JUMBO BR. (B00377MN) ALONG OROQUIETA CITY - CALAMBA MT. RD. | Region X | Misamis Occidental 1st DEO | On-Going | ₱38.4M | 68% | High risk74 | Flagged0.001 |
| 24J00006PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱172.6M | 49% | High risk73 | —-0.008 |
| 24JI0062PREVENTIVE MAINTENANCE - TERTIARY ROADS ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG RD - K1764 + 319 - K1764 + 991, K1770 + 000 - K1772 + 464.30 | Region IX | Zamboanga Sibugay 1st DEO | On-Going | ₱143.7M | 89% | High risk73 | —-0.030 |
| 24JE0017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LANGAPOD- BAGALUPA- GUBANG- MACASING ROAD (LANGAPOD BRIDGE), ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱96.4M | 70% | High risk71 | —-0.003 |
| 18J00077CONSTRUCTION OF CONCRETE ROAD, IPIL CIRCUMFERENTIAL ROAD, VETERANS-TIAYON-DON ANDRES SECTION, PHASE 4, ZAMBOANGA SIBUGAY, 10+760.00 - 11+020.00, 11+140.00 - 11+160.00, 12+900.00 - 13+274.56, 13+289.28 - 15+200.00, NET LENGTH: 2.57 KM/5.13 LANE KM | Region IX | Region IX | Completed | ₱133.4M | 100% | High risk71 | —-0.067 |
| 18GK0009ROAD CONCRETING AT BRGY. BAGONBON PROPER TO SITIO PAGBATANGAN ROAD TO SITIO NANGKA, SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱56.6M | 100% | High risk70 | —-0.005 |
| 19J00071CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD, (DON ANDRES - MAGDAUP - PANGI SECTION), ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱119.9M | 100% | High risk70 | —-0.006 |
| 23J00082ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS JCT BLANCIA-MOLAVE-JOSEFINA RD | Region IX | Region IX | Completed | ₱100.1M | 100% | High risk68 | —-0.070 |
| 24JB0023PREVENTIVE MAINTENANCE DIPOLOG-OROQUIETA NATIONAL ROAD K1795+(-415)-K1795+755, K1795+794-K1796+1031 | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱126.4M | 100% | High risk68 | —-0.069 |
| 23J00039CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱90.8M | 100% | High risk67 | —-0.034 |
| 23J00083ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS LANAO - PAGADIAN - ZAMBOANGA CITY ROAD | Region IX | Region IX | Completed | ₱101.3M | 100% | High risk67 | —-0.071 |
| 23IK0110NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, WRIGHT-TAFT BORONGAN RD. (S00123SM)- K0828+(-409)- K0830+861 (2-4 LANES) | Region VIII | Samar 2nd DEO | On-Going | ₱191M | 75% | High risk66 | —-0.017 |
| 20G00048ESCALANTE CITY CIRCUMFERENTIAL ROAD, SECTION 1 & 3, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱165.9M | 100% | High risk65 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23JG0058SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF DUMARA BRIDGE ALONG KUMALARANG RIVER, KUMALARANG, ZAMBOANGA DEL SU | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱97.1M | 100% | High risk82 | Flagged0.018 |
| 21J00032REPAIR/MAINTENANCE OF NATIONAL ROADS AND BRIDGES, PAINTING/REPAINTING OF CENTERLINE AND EDGE LINE ALONG: DIPOLOG - OROQUIETA RD (1795+(-437) - 1829+543) - INTERMITTENT SECTION, DIPOLOG - PUNTA - DANSULLAN SERGIO OSMEÑA ROAD (1857+(-1123) - 1893+775) - INT | Region IX | Region IX | On-Going | ₱44M | 100% | High risk64 | Flagged0.002 |
| 22G00150CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BACOLOD - MURCIA - DS BENEDICTO - SN CARLOS CITY RD (S00427NR) K0077+520 - K0078+662 | Region VI | Region VI | On-Going | ₱96.5M | 34% | Medium risk59 | Flagged0.001 |
| 24KI0087BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DULAPO JUMBO BR. (B00377MN) ALONG OROQUIETA CITY - CALAMBA MT. RD. | Region X | Misamis Occidental 1st DEO | On-Going | ₱38.4M | 68% | High risk74 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24JG0046SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF NANGAN-NANGAN BRIDGE, NANGAN-NANGAN, TIGBAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱77.1M | 59% | High risk62 | —-0.005 |
| 27 | 21K00191CONST./REPAIR/REHAB./IMPRVT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PRIJECTS, CONCRETING OF ROAD, BARANGAY MEDALLO, MUNICIPALITY OF SAPANG DALAGA CONNECTING TO BARANGAY MALIGUBAAN, MUNICIPALITY OF CONCEPTION, MISAMIS OCCIDENTAL | Region X | Region X | Completed | ₱157.1M | 100% | High risk62 | —-0.065 |
| 28 | 23JG0039WIDENING OF PERMANENT BRIDGES AT BAYOG PARALLEL BR. ALONG SINDANGAN-BAYOG-LAKEWOOD RD, BRGY. POBLACION, BAYOG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱72.3M | 91% | High risk62 | —-0.007 |
| 29 | 22JE0053SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF BRIDGE, BARANGAY DAMPALAN, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱77.1M | 100% | High risk61 | —-0.038 |
| 30 | 24KJ0044PREVENTIVE MAINTENANCE - PRIMARY ROADS, ASPHALT OVERLAY OZAMIS - PAGADIAN ROAD (TANGUB-OZAMIZ SECTION), MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱140.4M | 100% | High risk61 | —-0.070 |
| 31 | 19JI0062REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SIBUGUEY RIVER, STA. 0+513 TO STA. 1+122 AND STA. 0+000 TO STA 0+088, BARANGAY PILAR, DIPLAHAN, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱77.9M | 100% | High risk61 | —-0.070 |
| 32 | 24KJ0100PREVENTIVE MAINTENANCE - PRIMARY ROADS, ASPHALT OVERLAY OZAMIS - PAGADIAN ROAD (OZAMIZ SECTION), K1695+000 - K1695+391, K1695+421 - K1699+831.70, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱140.4M | 100% | High risk61 | —-0.070 |
| 33 | 20DE0007ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0173+713 - K0173+861 | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.094 |
| 34 | 22G00150CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BACOLOD - MURCIA - DS BENEDICTO - SN CARLOS CITY RD (S00427NR) K0077+520 - K0078+662 | Region VI | Region VI | On-Going | ₱96.5M | 34% | Medium risk59 | Flagged0.001 |
| 35 | 24KJ0026COMPLETION OF MULTI-PURPOSE BUILDING, SINACABAN, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱93.6M | 99% | Medium risk59 | —-0.040 |
| 36 | 24KJ0101PREVENTIVE MAINTENANCE - PRIMARY ROADS, ASPHALT OVERLAY OZAMIS - OROQUIETA ROAD (OZAMIZ - CLARIN SECTION), K1701+526 - K1705+022, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱131M | 100% | Medium risk59 | —-0.072 |
| 37 | 22K00122CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. LUNAO, STA. 0+620.00 - STA. 1+116.00, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱92.8M | 100% | Medium risk58 | —-0.066 |
| 38 | 24KI0048CONSTRUCTION (COMPLETION) OF ASENSO MISAMIS OCCIDENTAL MEDICAL CENTER (MOPH) MULTI-PURPOSE BUILDING, OROQUIETA CITY, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | On-Going | ₱98M | 95% | Medium risk58 | —-0.043 |
| 39 | 24KJ0124CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVENTION CENTER), OZAMIZ CITY, MISAMIS OCCIDENTAL (PHASE 6) | Region X | Misamis Occidental 2nd DEO | On-Going | ₱96M | 93% | Medium risk58 | —-0.040 |
| 40 | 23KJ0035CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF TANGUB-BONIFACIO BYPASS ROAD, TUGAS-SUMIRAP SECTION, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱93.6M | 96% | Medium risk58 | —-0.035 |
| 41 | 24KJ0021CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TANGUB - BONIFACIO BYPASS ROAD (TANGUB-BONIFACIO SECTION), TUGAS-GUINABOT-DIMALCO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱93.6M | 96% | Medium risk58 | —-0.045 |
| 42 | 23KJ0057ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF PANGUIL BAY ACCESS ROAD (OZAMIZ CITY COASTAL SECTION), MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | Medium risk57 | —-0.075 |
| 43 | 22K00372ROAD WIDENING-PRIMARY ROADS, OZAMIS CITY- OROQUIETA CITY RD - 1735+000-K1737+244, K1741+263-K1741+371,K1741+457-K1741+528 | Region X | Region X | Completed | ₱93.6M | 100% | Medium risk57 | —-0.073 |
| 44 | 23KJ0102REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - BONIFACIO-DON VICTORIANO RD, MISAMIS OCCIDENTAL PACKAGE I | Region X | Misamis Occidental 2nd DEO | Completed | ₱121.7M | 100% | Medium risk57 | —-0.073 |
| 45 | 24KJ0033ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BRGY. SAN LORENZO RUIZ ROAD, SINACABAN, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱94.6M | 100% | Medium risk57 | —-0.082 |
| 46 | 23KJ0019CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF MT. MALINDANG ECO TOURISM BYPASS ROAD (SINACABAN SECTION), SINACABAN, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | Medium risk57 | —-0.081 |
| 47 | 24KJ0034ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONCRETING OF ROAD, BRGY. SAN ISIDRO BAJO - KATIPUNAN, SINACABAN, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱94.6M | 100% | Medium risk57 | —-0.082 |
| 48 | 24KJ0009CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MT. MALINDANG ECO TOURISM BYPASS ROAD (BALON-SINUZA-COLAMBUTAN SETTLEMENT-MITUGAS), TUDELA, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱94.6M | 100% | Medium risk57 | —-0.082 |
| 49 | 23KJ0018CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF TANGUB-BONIFACIO BYPASS ROAD, UPPER USUGAN-DULLAN SECTION, BONIFACIO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | Medium risk57 | —-0.080 |
| 50 | 23KJ0091REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BONIFACIO - DON VICTORIANO RD (DON VICTORIANO SECTION) | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | Medium risk57 | —-0.080 |