Opening the dossier…
Opening the dossier…
Contractor dossier
254 projects on file, including joint ventures this contractor is part of.
Total projects
254
Total budget
₱15.9B
Average progress
98.8%
Completion rate
88.2%
Average risk score
50.7
Medium risk on average, out of 100
Flagged as unusual
4
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 218 | ₱12.9B | 49.4 | 1 | 99.7% |
| Region IX | 21 | ₱1.8B | 62.3 | 2 | 92.8% |
| Region VI | 4 | ₱350.2M | 54.9 | 1 | 83.6% |
| Region VIII | 2 | ₱328.5M | 65.0 | 0 | 87.3% |
| Region IV-A | 2 | ₱165.4M | 56.8 | 0 | 100.0% |
| Region VII | 2 | ₱116.4M | 50.6 | 0 | 99.2% |
| Region XIII | 2 | ₱114.6M | 41.3 | 0 | 100.0% |
| Negros Island Region | 1 | ₱56.6M | 70.1 | 0 | 100.0% |
| Region XII | 1 | ₱97.4M | 37.7 | 0 | 100.0% |
| Region III | 1 | ₱59.9M | 36.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 157 | ₱10.6B | 50.9 | 2 | 99.0% |
| Flood Control and Drainage | 50 | ₱2.9B | 48.4 | 0 | 99.6% |
| Buildings and Facilities | 24 | ₱990.6M | 44.1 | 0 | 99.3% |
| Bridges | 12 | ₱569.1M | 52.7 | 0 | 93.4% |
| OTHER | 7 | ₱593.1M | 78.3 | 2 | 95.2% |
| Bridges, Roads | 3 | ₱334.4M | 56.5 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱45.1M | 45.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23JG0058SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF DUMARA BRIDGE ALONG KUMALARANG RIVER, KUMALARANG, ZAMBOANGA DEL SU | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱97.1M | 100% | High risk82 | Flagged0.018 |
| 23KJ0037CONS/IMPROV'T OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), GANDAWAN-LAKE DUMINAGAT ROAD LEADING TO LAKE DUMINAGAT, BRGYS. NUEVA VISTA-GANDAWAN & LAKE DUMINAGAT, DON VICTORIANO, MIS. OCC. PACKAGE II | Region X | Misamis Occidental 2nd DEO | Completed | ₱126.4M | 100% | High risk80 | —-0.015 |
| 24KI0080FLOOD MITIGATION PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PALILAN RIVER, PACKAGE 1, JIMENEZ, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | On-Going | ₱96.5M | 98% | High risk79 | —-0.000 |
| 23KJ0020CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, PANGUIL BAY ACCESS ROAD (SILANGA - SAN APOLINARIO SECTION), MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | High risk79 | —-0.011 |
| 23KJ0038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), ACCESS ROAD LEADING TO MANSAWAN FALLS, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | High risk79 | —-0.028 |
| 24J00158CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIBUCO RIVER, SIBUCO BR. SECTION PACKAGE 2, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱152.9M | 90% | High risk76 | —-0.012 |
| 23KJ0046CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, OZAMIZ CITY COASTAL BYPASS ROAD, MALAUBANG-PULOT-DIMALUNA SECTION, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱47.5M | 100% | High risk75 | —-0.027 |
| 24KI0087BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DULAPO JUMBO BR. (B00377MN) ALONG OROQUIETA CITY - CALAMBA MT. RD. | Region X | Misamis Occidental 1st DEO | On-Going | ₱38.4M | 68% | High risk74 | Flagged0.001 |
| 24J00006PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱172.6M | 49% | High risk73 | —-0.008 |
| 24JI0062PREVENTIVE MAINTENANCE - TERTIARY ROADS ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG RD - K1764 + 319 - K1764 + 991, K1770 + 000 - K1772 + 464.30 | Region IX | Zamboanga Sibugay 1st DEO | On-Going | ₱143.7M | 89% | High risk73 | —-0.030 |
| 24JE0017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LANGAPOD- BAGALUPA- GUBANG- MACASING ROAD (LANGAPOD BRIDGE), ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱96.4M | 70% | High risk71 | —-0.003 |
| 18J00077CONSTRUCTION OF CONCRETE ROAD, IPIL CIRCUMFERENTIAL ROAD, VETERANS-TIAYON-DON ANDRES SECTION, PHASE 4, ZAMBOANGA SIBUGAY, 10+760.00 - 11+020.00, 11+140.00 - 11+160.00, 12+900.00 - 13+274.56, 13+289.28 - 15+200.00, NET LENGTH: 2.57 KM/5.13 LANE KM | Region IX | Region IX | Completed | ₱133.4M | 100% | High risk71 | —-0.067 |
| 18GK0009ROAD CONCRETING AT BRGY. BAGONBON PROPER TO SITIO PAGBATANGAN ROAD TO SITIO NANGKA, SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱56.6M | 100% | High risk70 | —-0.005 |
| 19J00071CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD, (DON ANDRES - MAGDAUP - PANGI SECTION), ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱119.9M | 100% | High risk70 | —-0.006 |
| 23J00082ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS JCT BLANCIA-MOLAVE-JOSEFINA RD | Region IX | Region IX | Completed | ₱100.1M | 100% | High risk68 | —-0.070 |
| 24JB0023PREVENTIVE MAINTENANCE DIPOLOG-OROQUIETA NATIONAL ROAD K1795+(-415)-K1795+755, K1795+794-K1796+1031 | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱126.4M | 100% | High risk68 | —-0.069 |
| 23J00039CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱90.8M | 100% | High risk67 | —-0.034 |
| 23J00083ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS LANAO - PAGADIAN - ZAMBOANGA CITY ROAD | Region IX | Region IX | Completed | ₱101.3M | 100% | High risk67 | —-0.071 |
| 23IK0110NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, WRIGHT-TAFT BORONGAN RD. (S00123SM)- K0828+(-409)- K0830+861 (2-4 LANES) | Region VIII | Samar 2nd DEO | On-Going | ₱191M | 75% | High risk66 | —-0.017 |
| 20G00048ESCALANTE CITY CIRCUMFERENTIAL ROAD, SECTION 1 & 3, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱165.9M | 100% | High risk65 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23JG0058SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF DUMARA BRIDGE ALONG KUMALARANG RIVER, KUMALARANG, ZAMBOANGA DEL SU | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱97.1M | 100% | High risk82 | Flagged0.018 |
| 21J00032REPAIR/MAINTENANCE OF NATIONAL ROADS AND BRIDGES, PAINTING/REPAINTING OF CENTERLINE AND EDGE LINE ALONG: DIPOLOG - OROQUIETA RD (1795+(-437) - 1829+543) - INTERMITTENT SECTION, DIPOLOG - PUNTA - DANSULLAN SERGIO OSMEÑA ROAD (1857+(-1123) - 1893+775) - INT | Region IX | Region IX | On-Going | ₱44M | 100% | High risk64 | Flagged0.002 |
| 22G00150CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BACOLOD - MURCIA - DS BENEDICTO - SN CARLOS CITY RD (S00427NR) K0077+520 - K0078+662 | Region VI | Region VI | On-Going | ₱96.5M | 34% | Medium risk59 | Flagged0.001 |
| 24KI0087BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DULAPO JUMBO BR. (B00377MN) ALONG OROQUIETA CITY - CALAMBA MT. RD. | Region X | Misamis Occidental 1st DEO | On-Going | ₱38.4M | 68% | High risk74 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 21KJ0064CONSTRUCTION OF MISSING LINKS/NEW ROADS BONIFACIO-DON VICTORIANO ROAD (NAPANGAN-MANSAWAN SECTION), MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.092 |
| 202 | 20KJ0121CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, GANDAWAN-LAKE DUMINAGAT ROAD LEADING TO LAKE DUMINAGAT, BRGYS. NUEVA VISTA-GANDAWAN & LAKE DUMINAGAT, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.092 |
| 203 | 21KJ0031CONSTRUCTION OF MISSING LINKS/NEW ROADS BONIFACIO-DON VICTORIANO ROAD, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.092 |
| 204 | 22KJ0041CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TANGUB-BONIFACIO BYPASS ROAD, BONIFACIO SECTION, MISAMIS OCCIDENTAL, BONIFACION. MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱46.6M | 100% | Medium risk45 | —-0.092 |
| 205 | 22KJ0002PREVENTIVE MAINENANCE-PRIMARY ROADS OZAMIZ-PAGADIAN ROAD K1666+217-K1667+825, K1667+847-K1669+521, OZAMIZ-PAGADIAN ROAD K1666+217-K1667+825, K1667+847-K1669+521 | Region X | Misamis Occidental 2nd DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.092 |
| 206 | 22KJ0015CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), ACCESS ROAD LEADING TO PIDUAN FALLS, DON VICTORIANO, MISAMIS OCCIENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.093 |
| 207 | 19KJ0181CONSTRUCTION OF MULTI-PURPOSE BUILDING, CLUSTER B 2ND DISTRICT MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱19.5M | 100% | Medium risk45 | —-0.093 |
| 208 | 21KJ0007CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TANGUB-BONIFACIO BYPASS ROAD (PISAAN-BUENAVISTA SECTION), MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱41.9M | 100% | Medium risk45 | —-0.090 |
| 209 | 20KI0024CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, SAPANG DALAGA, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱45.1M | 100% | Medium risk45 | —-0.058 |
| 210 | 19KJ0169CONSTRUCTION OF SLOPE PROTECTION (DOWNSTREAM) OF MALUBOG BRIDGE 1, ALONG LABUYO-TANGUB-SILANGA ROAD, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.081 |
| 211 | 21KJ0011WIDENING OF PERMANENT BRIDGE SEBAC BR. (B01140MN) ALONG OZAMIZ-OROQUIETA ROAD, SEBAC BR. (B01140MN) ALONG OZAMIZ-OROQUIETA ROAD | Region X | Misamis Occidental 2nd DEO | Completed | ₱9.1M | 100% | Medium risk45 | —-0.057 |
| 212 | 20KJ0058CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION UPSTREAM AND DOWNSTREAM OF BAGUMBANG BRIDGE ALONG OZAMIZ-PAGADIAN ROAD, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱35.6M | 100% | Medium risk45 | —-0.080 |
| 213 | 19KJ0170CONSTRUCTION OF SLOPE PROTECTION (UPSTREAM & DOWSNTREAM) OF PANALSALAN BRIDGE 2, ALONG OZAMIZ-PAGADIAN ROAD, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.081 |
| 214 | 19KJ0178CONCRETING OF ROAD, BRGY. CARANGAN-MOLICAY-LABO CIRCUMFERENTIAL ROAD, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱28.2M | 100% | Medium risk45 | —-0.093 |
| 215 | 20KJ0139IMPROVEMENT/CONCRETING OF POLAO-KAUSWAGAN ROAD, TANGUB CITY MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱23.3M | 100% | Medium risk45 | —-0.093 |
| 216 | 18KI0079CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS, ACCESS ROAD LEADING TO CALUYA PORT ROAD, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 1st DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.094 |
| 217 | 19KE0016CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG DINANGGASAN RIVER | Region X | Camiguin DEO | Completed | ₱30M | 100% | Medium risk45 | —-0.080 |
| 218 | 18KE0013CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG LUMAD RIVER/DRAINAGE SYSTEM ALONG CCR LUMAD BRIDGE | Region X | Camiguin DEO | Completed | ₱46.6M | 100% | Medium risk45 | —-0.081 |
| 219 | 18KE0011CONSTRUCTION OF RUBBLE DIKE ALONG BAYLAO RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR, BAYLAO BRIDGE | Region X | Camiguin DEO | Completed | ₱46.6M | 100% | Medium risk45 | —-0.081 |
| 220 | 19KE0030CONSTRUCTION/IMPROVEMENT OF DINANGGASAN RIVER CONTROL | Region X | Camiguin DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.081 |
| 221 | 23KI0013ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS OROQUIETA CITY-PLARIDEL-CALAMBA-SAPANG DALAGA RD - K1765+845 - K1765+927, K1769+000 - K1769+611 | Region X | Misamis Occidental 1st DEO | Completed | ₱25.2M | 100% | Medium risk45 | —-0.095 |
| 222 | 20KJ0002REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS BONIFACIO - DON VICTORIANO RD - K1667+(-130)-K1667+000,K1667+(-589)-K1667+(-130), K1667+870-K1668+037 | Region X | Misamis Occidental 2nd DEO | Completed | ₱26.7M | 100% | Medium risk45 | —-0.093 |
| 223 | 20KJ0010CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TANGUB-BONIFACIO BYPASS ROAD, (TIAMAN-LUMAPAS SECTION) MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.093 |
| 224 | 19KE0014CONSTRUCTION OF LILOAN RIVER CONTROL | Region X | Camiguin DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.081 |
| 225 | 19KJ0179CONCRETING OF ROAD, BRGY. CALABAYAN-MONTOL-TIPAN, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱18.8M | 100% | Medium risk44 | —-0.094 |