Contractor dossier
411 projects on file, including joint ventures this contractor is part of.
Total projects
411
Total budget
₱32.9B
Average progress
94.7%
Completion rate
85.4%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
41
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 105 | ₱7.6B | 48.9 | 5 | 98.8% |
| Region XIII | 86 | ₱6.5B | 46.3 | 4 | 96.2% |
| Region VI | 82 | ₱6.8B | 62.2 | 16 | 87.7% |
| Region XI | 64 | ₱5.6B | 58.3 | 7 | 93.9% |
| Region IV-A | 21 | ₱1.8B | 63.0 | 0 | 100.0% |
| Cordillera Administrative Region | 17 | ₱1.9B | 57.2 | 1 | 100.0% |
| Region IX | 10 | ₱610.9M | 66.9 | 7 | 72.0% |
| Region V | 6 | ₱590.3M | 61.8 | 0 | 100.0% |
| Region X | 4 | ₱431.4M | 56.7 | 0 | 100.0% |
| Region XII | 4 | ₱201.3M | 31.3 | 0 | 100.0% |
| Region VIII | 3 | ₱327.1M | 58.0 | 1 | 87.6% |
| Negros Island Region | 3 | ₱171.9M | 57.5 | 0 | 100.0% |
| Region VII | 2 | ₱57.9M | 49.4 | 0 | 95.8% |
| National Capital Region | 2 | ₱96.1M | 48.4 | 0 | 100.0% |
| Region III | 1 | ₱122M | 51.7 | 0 | 100.0% |
| Region II | 1 | ₱49M | 48.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 173 | ₱15.2B | 51.6 | 2 | 97.8% |
| Flood Control and Drainage | 99 | ₱7.7B | 52.1 | 10 | 93.4% |
| Bridges | 62 | ₱3.9B | 51.0 | 8 | 95.0% |
| OTHER | 25 | ₱2.3B | 77.7 | 9 | 93.5% |
| Buildings and Facilities | 23 | ₱788.9M | 43.3 | 1 | 94.7% |
| Bridges, Roads | 17 | ₱2.3B | 61.5 | 3 | 95.0% |
| GAA 2025 SSP | 5 | ₱334.1M | 94.1 | 4 | 49.9% |
| GAA 2025 OO-2 | 3 | ₱174.1M | 88.0 | 2 | 68.6% |
| GAA 2025 OO-1 | 2 | ₱173.7M | 95.3 | 2 | 51.3% |
| Water Provision and Storage | 2 | ₱32.4M | 58.2 | 0 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LUNA - JALANDONI FLYOVER (B00483PN) ALONG JALANDONI FLYOVER | Region VI | Region VI | On-Going | ₱77.3M | 58% | High risk95 | Flagged0.011 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 25ED0025REHABILITATION OF BRIDGE, BARANGAY TACLIGAN, SAN TEODORO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱29.7M | 100% | High risk89 | —-0.015 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 25NI0027CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MAIN CANAL STA. 0 + 280 - STA. 0 + 384.60; STA. 0 + 744.34 - STA. 0 + 920; STA. 1 + 650 - STA. 2 +100 BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 77% | High risk85 | Flagged0.002 |
| 25NI0026CONSTRUCTION OF RETAINING WALL ALONG MAIN CANAL SERVICE ROAD, STA. 0 + 643.10 - STA. 0+ 943.10, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 93% | High risk85 | —-0.003 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 18GP0052ROAD WIDENING ILOILO - CAPIZ RD (NEW ROUTE) - K0081+090 - K0081+692, K0085+045.30 - K0085+122, K0085+166.50 - K0085+279.90, K0087+247.90 - K0087+602.50, K0093+964 - K0095+378 | Region VI | Capiz 2nd DEO | Completed | ₱96.5M | 100% | High risk84 | —-0.016 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 18GP0053CONSTRUCTION OF CONCRETE ROAD - GUINTAS - PINAMALATICAN ROAD, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱93.6M | 100% | High risk82 | —-0.017 |
| 19E00033CONST./IMPROVEMENT OF SAN JOSE CIRCUMFERENTIAL ROAD, STA. 8+532.00 - STA. 8+840.00, SAN JOSE, ROMBLON | Region IV-B | Region IV-B | Completed | ₱106M | 100% | High risk81 | Flagged0.002 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 24NG0051CONSTRUCTION OF SEAWALL/BARANGAY TALISAY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.5M | 89% | High risk79 | Flagged0.012 |
| 24GP0018ROAD WIDENING - ILOILO-CAPIZ RD (NEW ROUTE) - K0096+069 - K0096+715 | Region VI | Capiz 2nd DEO | On-Going | ₱34.2M | 91% | High risk78 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21G00205BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱171.9M | 9% | High risk74 | Flagged0.079 |
| 23G00099UNGKA FLYOVER MODIFICATION AND RESTORATION WORKS | Region VI | Region VI | On-Going | ₱96.5M | 6% | High risk64 | Flagged0.070 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 18II0053CONSTRUCTION OF MONDRAGON - SILVINO LUBOS ROAD (PHASE 5) STA. 10+040 - STA. 13+480, SILVINO LUBOS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱227.5M | 100% | High risk65 | Flagged0.045 |
| 24GA0251CONSTRUCTION OF REVETMENT WALL (FLOOD CONTROL), ALONG AKLAN RIVER, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱24.1M | 89% | High risk73 | Flagged0.038 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 24GA0252CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG AKLAN RIVER, BARANGAY DAJA SUR, BANGA, AKLAN | Region VI | Aklan DEO | On-Going | ₱19.2M | 91% | High risk73 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 22GB0006ILOILO-ANTIQUE RD - K0148 +500 - K0149 +796, ANTIQUE | Region VI | Antique DEO | Completed | ₱36.2M | 100% | Medium risk46 | —-0.085 |
| 302 | 20LH0012REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1631+020-K1631+155 | Region XI | Davao City 2nd DEO | Completed | ₱23M | 100% | Medium risk46 | —-0.092 |
| 303 | 21NG0092CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SURIGAO-AGUSAN WEST COASTAL ROAD STA.39+550 - STA.39+696.49 / MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱90.8M | 100% | Medium risk46 | —-0.065 |
| 304 | 21NF0080CONSTRUCTION/WIDENING OF SAN ISIDRO BRIDGE, SAN ISIDRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱85.2M | 100% | Medium risk46 | —-0.034 |
| 305 | 21EA0041CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (INCLUDING RECHANNELING), LUPAC - TABIGUE, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱60.5M | 100% | Medium risk45 | —-0.072 |
| 306 | 18NG0055CONSTRUCTION OF BUHING KALIPAY - PELAEZ - SAN MIGUEL ROAD (STA. 0+000-STA.3+020), BRGY. BUHING KALIPAAY, SAN ISIDRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱99M | 100% | Medium risk45 | —-0.073 |
| 307 | 21N00043SURIGAO- DAVAO COASTAL RD- K1198+000- K1199+806, CLAVER, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱98.4M | 100% | Medium risk45 | —-0.067 |
| 308 | 22EA0071CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOAC RIVER, STA. 0+000-STA.0+950, BRGY. MAINIT, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱86.8M | 100% | Medium risk45 | —-0.061 |
| 309 | 18EA0063CONSTRUCTION OF CONCRETE DIKE FLOOD CONTROL STRUCTURE ALONG BOAC RIVER AT BRGY. TABIGUE-LUPAC-TABI S | Region IV-B | Marinduque DEO | Completed | ₱75.1M | 100% | Medium risk45 | —-0.067 |
| 310 | 21NF0078CONSTRUCTION / WIDENING OF KADUYUKAN BRIDGE, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱58M | 100% | Medium risk45 | —-0.042 |
| 311 | 22NB0025RETROFITTING OF TALACOGON BRIDGE, BARANGAY POBLACION, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱89.1M | 100% | Medium risk45 | —-0.032 |
| 312 | 24NF0025PREVENTIVE MAINTENANCE - SECONDARY ROADS ASPHALT OVERLAY ALONG DAPA-GEN LUNA RD (BRGY. CONSUELO TO BRGY. TAWIN-TAWIN), GENERAL LUNA, SURIGAO DEL NORTE (PHASE 1) | Region XIII | Surigao del Norte 1st DEO | Completed | ₱96.4M | 100% | Medium risk45 | —-0.075 |
| 313 | 23NG0011NETWORK DEVELOPMENT PROGRAM - OFF - CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS, QUEZON-MAPAWA-CAPALAYAN-ESPINA-NAVARRO RD - K1134+000 - K1135+528, K1135+595 - K1137+000/ BRGY. CAPALAYAN-OROK, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱59.6M | 100% | Medium risk45 | —-0.049 |
| 314 | 20NE0042CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONSMAHAYAHAY (SAN JOSE)- GOMEZ (DINAGAT)ROAD LEADING TO TAGBUYAKHAW TOURISM AREA, DINAGAT ISLANDS, SAN JOSE AND DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱64.1M | 100% | Medium risk45 | —-0.075 |
| 315 | 24NF0027PREVENTIVE MAINTENANCE-TERTIARY ROADS ASPHALT OVERLAY ALONG JCT. OSMENA-PILAR RD (S00023SG)-K0011+000-K0012+000, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱96.4M | 100% | Medium risk44 | —-0.075 |
| 316 | 20LA0164CONSTRUCTION OF REVETMENT ALONG HIJO RIVER, BRGY. PANIBASAN, MACO COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱43.8M | 100% | Medium risk44 | —-0.066 |
| 317 | 24NF0029PREVENTIVE MAINTENANCE - SECONDARY ROADS ASPHALT OVERLAY ALONG BRGY. 3 TO BRGY. 2 DAPA-GEN LUNA RD, GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱97.9M | 100% | Medium risk44 | —-0.074 |
| 318 | 23NG0017CONSTRUCTION OF ROAD IN BARANGAY FERLDA, ALEGRIA, SURIGAO DEL NORTE / BRGY. FERLDA, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱75.7M | 70% | Medium risk44 | —-0.038 |
| 319 | 20EA0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (BOAC ARENA), BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱48M | 100% | Medium risk44 | —-0.071 |
| 320 | 23E00116CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF WATERWAY FROM BONGABONG DIVERSION ROAD TO IPIL CREEK (OUTFALL), BRGY. IPIL, BONGABONG, OR MINDORO | Region IV-B | Region IV-B | On-Going | ₱53.6M | 76% | Medium risk44 | —-0.022 |
| 321 | 22NG0113REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS SURIGAO-DAVAO COASTAL RD - K1175+340 - K1175+395.46 / GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱85.6M | 100% | Medium risk44 | —-0.080 |
| 322 | 22NG0115REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS SURIGAO-DAVAO COASTAL RD - K1187+060 - K1187+260 / CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱85.5M | 100% | Medium risk43 | —-0.080 |
| 323 | 22NG0114REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS SURIGAO-DAVAO COASTAL RD - K1185+690 - K1185+847.022 / CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱85.5M | 100% | Medium risk43 | —-0.081 |
| 324 | 22ED0103CONSTRUCTION OF MALIBAGO - BACUNGAN BRIDGE, POLA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱49.5M | 100% | Medium risk43 | —-0.049 |
| 325 | 23NF0025PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DEL CARMEN - STA MONICA - SAN ISIDRO RD (S00009SG) - K0032+800 - K0036+100 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱96M | 100% | Medium risk43 | —-0.076 |