Contractor dossier
411 projects on file, including joint ventures this contractor is part of.
Total projects
411
Total budget
₱32.9B
Average progress
94.7%
Completion rate
85.4%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
41
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 105 | ₱7.6B | 48.9 | 5 | 98.8% |
| Region XIII | 86 | ₱6.5B | 46.3 | 4 | 96.2% |
| Region VI | 82 | ₱6.8B | 62.2 | 16 | 87.7% |
| Region XI | 64 | ₱5.6B | 58.3 | 7 | 93.9% |
| Region IV-A | 21 | ₱1.8B | 63.0 | 0 | 100.0% |
| Cordillera Administrative Region | 17 | ₱1.9B | 57.2 | 1 | 100.0% |
| Region IX | 10 | ₱610.9M | 66.9 | 7 | 72.0% |
| Region V | 6 | ₱590.3M | 61.8 | 0 | 100.0% |
| Region X | 4 | ₱431.4M | 56.7 | 0 | 100.0% |
| Region XII | 4 | ₱201.3M | 31.3 | 0 | 100.0% |
| Region VIII | 3 | ₱327.1M | 58.0 | 1 | 87.6% |
| Negros Island Region | 3 | ₱171.9M | 57.5 | 0 | 100.0% |
| Region VII | 2 | ₱57.9M | 49.4 | 0 | 95.8% |
| National Capital Region | 2 | ₱96.1M | 48.4 | 0 | 100.0% |
| Region III | 1 | ₱122M | 51.7 | 0 | 100.0% |
| Region II | 1 | ₱49M | 48.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 173 | ₱15.2B | 51.6 | 2 | 97.8% |
| Flood Control and Drainage | 99 | ₱7.7B | 52.1 | 10 | 93.4% |
| Bridges | 62 | ₱3.9B | 51.0 | 8 | 95.0% |
| OTHER | 25 | ₱2.3B | 77.7 | 9 | 93.5% |
| Buildings and Facilities | 23 | ₱788.9M | 43.3 | 1 | 94.7% |
| Bridges, Roads | 17 | ₱2.3B | 61.5 | 3 | 95.0% |
| GAA 2025 SSP | 5 | ₱334.1M | 94.1 | 4 | 49.9% |
| GAA 2025 OO-2 | 3 | ₱174.1M | 88.0 | 2 | 68.6% |
| GAA 2025 OO-1 | 2 | ₱173.7M | 95.3 | 2 | 51.3% |
| Water Provision and Storage | 2 | ₱32.4M | 58.2 | 0 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LUNA - JALANDONI FLYOVER (B00483PN) ALONG JALANDONI FLYOVER | Region VI | Region VI | On-Going | ₱77.3M | 58% | High risk95 | Flagged0.011 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 25ED0025REHABILITATION OF BRIDGE, BARANGAY TACLIGAN, SAN TEODORO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱29.7M | 100% | High risk89 | —-0.015 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 25NI0027CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MAIN CANAL STA. 0 + 280 - STA. 0 + 384.60; STA. 0 + 744.34 - STA. 0 + 920; STA. 1 + 650 - STA. 2 +100 BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 77% | High risk85 | Flagged0.002 |
| 25NI0026CONSTRUCTION OF RETAINING WALL ALONG MAIN CANAL SERVICE ROAD, STA. 0 + 643.10 - STA. 0+ 943.10, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 93% | High risk85 | —-0.003 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 18GP0052ROAD WIDENING ILOILO - CAPIZ RD (NEW ROUTE) - K0081+090 - K0081+692, K0085+045.30 - K0085+122, K0085+166.50 - K0085+279.90, K0087+247.90 - K0087+602.50, K0093+964 - K0095+378 | Region VI | Capiz 2nd DEO | Completed | ₱96.5M | 100% | High risk84 | —-0.016 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 18GP0053CONSTRUCTION OF CONCRETE ROAD - GUINTAS - PINAMALATICAN ROAD, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱93.6M | 100% | High risk82 | —-0.017 |
| 19E00033CONST./IMPROVEMENT OF SAN JOSE CIRCUMFERENTIAL ROAD, STA. 8+532.00 - STA. 8+840.00, SAN JOSE, ROMBLON | Region IV-B | Region IV-B | Completed | ₱106M | 100% | High risk81 | Flagged0.002 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 24NG0051CONSTRUCTION OF SEAWALL/BARANGAY TALISAY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.5M | 89% | High risk79 | Flagged0.012 |
| 24GP0018ROAD WIDENING - ILOILO-CAPIZ RD (NEW ROUTE) - K0096+069 - K0096+715 | Region VI | Capiz 2nd DEO | On-Going | ₱34.2M | 91% | High risk78 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21G00205BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱171.9M | 9% | High risk74 | Flagged0.079 |
| 23G00099UNGKA FLYOVER MODIFICATION AND RESTORATION WORKS | Region VI | Region VI | On-Going | ₱96.5M | 6% | High risk64 | Flagged0.070 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 18II0053CONSTRUCTION OF MONDRAGON - SILVINO LUBOS ROAD (PHASE 5) STA. 10+040 - STA. 13+480, SILVINO LUBOS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱227.5M | 100% | High risk65 | Flagged0.045 |
| 24GA0251CONSTRUCTION OF REVETMENT WALL (FLOOD CONTROL), ALONG AKLAN RIVER, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱24.1M | 89% | High risk73 | Flagged0.038 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 24GA0252CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG AKLAN RIVER, BARANGAY DAJA SUR, BANGA, AKLAN | Region VI | Aklan DEO | On-Going | ₱19.2M | 91% | High risk73 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 23NF0029PREVENTIVE MAINTENANCE - TERTIARY ROADS JCT DEL CARMEN - STA. MONICA - SAN ISIDRO RD - K0019+188 - K0020+120, K0022+440 - K0024+657 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱96M | 100% | Medium risk43 | —-0.076 |
| 327 | 21NF0081CONSTRUCTION/WIDENING OF TAYTAY BRIDGE, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱50.5M | 100% | Medium risk43 | —-0.043 |
| 328 | 18NG0023OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROAD PAVING OF SHOULDER JCT. CANCOHOY-PILAR ROAD (K0019+(1449)-K0020+000, K0023+942-K0026+000, K0027+173-K0027+425,K0027+579-K0029+984 AND OTHER 8 STATION LIMITS, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱93.5M | 100% | Medium risk43 | —-0.076 |
| 329 | 17KC0034REHABILTATION/RECONSTRUCTIOIN OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAYRE HIGHWAY K1452+300-K1452+350, K1454+100-K1454+135, K1458+198-K1458+295, MANOLO FORTICH BUK. | Region X | Bukidnon 3rd DEO | Completed | ₱36.3M | 100% | Medium risk43 | —-0.067 |
| 330 | 23NH0075REHABILITATION/RECONSTRUCTION OF ROADS WITH SLOPE PROTECTION AT CARRASCAL ROAD SECTION ALONG SDCR, K1208+680 - K1208+920.00, BARANGAY ADLAY, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱87.7M | 100% | Medium risk43 | —-0.075 |
| 331 | 22NG0109REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS SURIGAO-DAVAO COASTAL RD - K1201+360 - K1201+496.25/CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱86.1M | 100% | Medium risk43 | —-0.080 |
| 332 | 23NF0067PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT DEL CARMEN-STA MONICA-SAN ISIDRO RD-K0046+438-K0049+115 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱96M | 100% | Medium risk43 | —-0.076 |
| 333 | 20LB0328CONSTRUCTION OF 3STY-15CL SCHOOL BUILDING, CATALUNAN GRANDE ES, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱41.9M | 100% | Medium risk43 | —-0.032 |
| 334 | 23NF0007PREVENTIVE MAINTENANCE-TERTIARY ROADS-ASPHALT OVERLAY-DAPA-UNION-GEN. LUNA RD-K0001+027 K0003+407 GEN. LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱80.8M | 100% | Medium risk42 | —-0.076 |
| 335 | 22NF0069PREVENTIVE MAINTENANCE OF ROAD-TERTIARY ROADS DAPA-UNION-GEN. LUNA ROAD-K0015+(-395)-K0017+500 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱86M | 100% | Medium risk42 | —-0.075 |
| 336 | 21NF0077CONSTRUCTION / WIDENING OF ASINAN BRIDGE, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱56.2M | 100% | Medium risk42 | —-0.034 |
| 337 | 18EH0038OFF - CARRIAGE IMPROVEMENT OF ROMBLON - COGON SABLAYAN ROAD, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱48.2M | 100% | Medium risk42 | —-0.086 |
| 338 | 21NF0079CONSTRUCTION/WIDENING OF MAASIN BRIDGE, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱56.2M | 100% | Medium risk42 | —-0.034 |
| 339 | 20LB0327CONSTRUCTION OF 3STY-12CL SCHOOL BUILDING, CATALUNAN GRANDE ES, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱35.1M | 100% | Medium risk42 | —-0.035 |
| 340 | 20MC0076CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG KIDAPAWAN-ILOMAVIS TOURIST RD (S00697MN) K1636+760 TO K1636+835, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.053 |
| 341 | 19LD0133REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING WITH FACILITIES, BRGY. MATTI, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱19.3M | 100% | Medium risk41 | —-0.041 |
| 342 | 18EA0214CONSTRUCTION OF TWO (2) STOREY, FOUR (4) LABORATORY (TWO (2) SCIENCE LABORATORY AND TWO (2) ICT LABORATORY) SCHOOL BUILDING AT POCTOY NATIONAL HIGH SCHOOL (BONLIW NHS-POCTOY ANNEX) | Region IV-B | Marinduque DEO | Completed | ₱38.4M | 100% | Medium risk41 | —-0.040 |
| 343 | 18EA0215CONSTRUCTION OF TWO (2) STOREY, FOUR(4) LABORATORY (TWO (2) SCIENCE LABORATORY AND TWO (2) ICT LABORATORY) SCHOOL BUILDING AT MARANLIG NATIONAL HIGH SCHOOL | Region IV-B | Marinduque DEO | Completed | ₱39.4M | 100% | Medium risk41 | —-0.040 |
| 344 | 21NG0084ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS QUEZON-MAPAWA-CAPALAYAN-ESPINA-NAVARRO RD. K1134+000 - K1134+300, K1134+510 - K1134+571.5/ BRGY. CAPALAYAN, SURIGAO CITY, SURIGA | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱46.8M | 100% | Medium risk41 | —-0.088 |
| 345 | 20N00100DAPA PORT - CONSUELO - CORAZON - STA. CRUZ - STA. FE -LIBERTAD - CABITOONAN - CATANGNAN - GENERAL LUNA ROAD, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱19.3M | 100% | Medium risk41 | —-0.042 |
| 346 | 20NF0048CONSTRUCTION OF ROCKFALL PROTECTION SYSTEM UNION DAPA-MALINAO ROAD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱84.2M | 100% | Medium risk41 | —-0.076 |
| 347 | 23L00214CONCRETING OF BRGY. ALEJAL TO BRGY. MAGSAYSAY FMR, BRGY. ALEJAL AND BRGY. MAGSAYSAY, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱9.9M | 100% | Medium risk41 | —-0.035 |
| 348 | 24NF0012PREVENTIVE MAINTENANCE - SECONDARY ROADS DAPA - JCT CANCOHOY RD (S00005SG) K0008+945 - K0011+465 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱91.4M | 100% | Medium risk41 | —-0.077 |
| 349 | 16L00040STANDARD EVACUATION CENTER, PROVINCIAL CAPITOL COMPOUND, NABUNTURAN,COMPOSTELA VALLEY PROVINCE | Region XI | Region XI | Completed | ₱34.3M | 100% | Medium risk40 | —-0.046 |
| 350 | 21NG0086ASSET PRESERVATION -REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS QUEZON-MAPAWA-CAPALAYAN-ESPINA-NAVARRO RD. K1134+300 - K1134+590, K1134+700 - K1134+860/ BRGY. CAPALAYAN, SURIGAO CITY, SURIGAO | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱41.9M | 100% | Medium risk40 | —-0.088 |