Contractor dossier
411 projects on file, including joint ventures this contractor is part of.
Total projects
411
Total budget
₱32.9B
Average progress
94.7%
Completion rate
85.4%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
41
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 105 | ₱7.6B | 48.9 | 5 | 98.8% |
| Region XIII | 86 | ₱6.5B | 46.3 | 4 | 96.2% |
| Region VI | 82 | ₱6.8B | 62.2 | 16 | 87.7% |
| Region XI | 64 | ₱5.6B | 58.3 | 7 | 93.9% |
| Region IV-A | 21 | ₱1.8B | 63.0 | 0 | 100.0% |
| Cordillera Administrative Region | 17 | ₱1.9B | 57.2 | 1 | 100.0% |
| Region IX | 10 | ₱610.9M | 66.9 | 7 | 72.0% |
| Region V | 6 | ₱590.3M | 61.8 | 0 | 100.0% |
| Region X | 4 | ₱431.4M | 56.7 | 0 | 100.0% |
| Region XII | 4 | ₱201.3M | 31.3 | 0 | 100.0% |
| Region VIII | 3 | ₱327.1M | 58.0 | 1 | 87.6% |
| Negros Island Region | 3 | ₱171.9M | 57.5 | 0 | 100.0% |
| Region VII | 2 | ₱57.9M | 49.4 | 0 | 95.8% |
| National Capital Region | 2 | ₱96.1M | 48.4 | 0 | 100.0% |
| Region III | 1 | ₱122M | 51.7 | 0 | 100.0% |
| Region II | 1 | ₱49M | 48.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 173 | ₱15.2B | 51.6 | 2 | 97.8% |
| Flood Control and Drainage | 99 | ₱7.7B | 52.1 | 10 | 93.4% |
| Bridges | 62 | ₱3.9B | 51.0 | 8 | 95.0% |
| OTHER | 25 | ₱2.3B | 77.7 | 9 | 93.5% |
| Buildings and Facilities | 23 | ₱788.9M | 43.3 | 1 | 94.7% |
| Bridges, Roads | 17 | ₱2.3B | 61.5 | 3 | 95.0% |
| GAA 2025 SSP | 5 | ₱334.1M | 94.1 | 4 | 49.9% |
| GAA 2025 OO-2 | 3 | ₱174.1M | 88.0 | 2 | 68.6% |
| GAA 2025 OO-1 | 2 | ₱173.7M | 95.3 | 2 | 51.3% |
| Water Provision and Storage | 2 | ₱32.4M | 58.2 | 0 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LUNA - JALANDONI FLYOVER (B00483PN) ALONG JALANDONI FLYOVER | Region VI | Region VI | On-Going | ₱77.3M | 58% | High risk95 | Flagged0.011 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 25ED0025REHABILITATION OF BRIDGE, BARANGAY TACLIGAN, SAN TEODORO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱29.7M | 100% | High risk89 | —-0.015 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 25NI0027CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MAIN CANAL STA. 0 + 280 - STA. 0 + 384.60; STA. 0 + 744.34 - STA. 0 + 920; STA. 1 + 650 - STA. 2 +100 BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 77% | High risk85 | Flagged0.002 |
| 25NI0026CONSTRUCTION OF RETAINING WALL ALONG MAIN CANAL SERVICE ROAD, STA. 0 + 643.10 - STA. 0+ 943.10, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 93% | High risk85 | —-0.003 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 18GP0052ROAD WIDENING ILOILO - CAPIZ RD (NEW ROUTE) - K0081+090 - K0081+692, K0085+045.30 - K0085+122, K0085+166.50 - K0085+279.90, K0087+247.90 - K0087+602.50, K0093+964 - K0095+378 | Region VI | Capiz 2nd DEO | Completed | ₱96.5M | 100% | High risk84 | —-0.016 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 18GP0053CONSTRUCTION OF CONCRETE ROAD - GUINTAS - PINAMALATICAN ROAD, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱93.6M | 100% | High risk82 | —-0.017 |
| 19E00033CONST./IMPROVEMENT OF SAN JOSE CIRCUMFERENTIAL ROAD, STA. 8+532.00 - STA. 8+840.00, SAN JOSE, ROMBLON | Region IV-B | Region IV-B | Completed | ₱106M | 100% | High risk81 | Flagged0.002 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 24NG0051CONSTRUCTION OF SEAWALL/BARANGAY TALISAY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.5M | 89% | High risk79 | Flagged0.012 |
| 24GP0018ROAD WIDENING - ILOILO-CAPIZ RD (NEW ROUTE) - K0096+069 - K0096+715 | Region VI | Capiz 2nd DEO | On-Going | ₱34.2M | 91% | High risk78 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21G00205BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱171.9M | 9% | High risk74 | Flagged0.079 |
| 23G00099UNGKA FLYOVER MODIFICATION AND RESTORATION WORKS | Region VI | Region VI | On-Going | ₱96.5M | 6% | High risk64 | Flagged0.070 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 18II0053CONSTRUCTION OF MONDRAGON - SILVINO LUBOS ROAD (PHASE 5) STA. 10+040 - STA. 13+480, SILVINO LUBOS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱227.5M | 100% | High risk65 | Flagged0.045 |
| 24GA0251CONSTRUCTION OF REVETMENT WALL (FLOOD CONTROL), ALONG AKLAN RIVER, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱24.1M | 89% | High risk73 | Flagged0.038 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 24GA0252CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG AKLAN RIVER, BARANGAY DAJA SUR, BANGA, AKLAN | Region VI | Aklan DEO | On-Going | ₱19.2M | 91% | High risk73 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 23NF0008PREVENTIVE MAINTENANCE-SECONDARY ROADS-DAPA-JCT CANCOHOY RD-K0003+000-K0005+581 DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱87.6M | 100% | Medium risk40 | —-0.077 |
| 352 | 19NI0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SURIGAO-DAVAO COASTAL ROAD, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱52.7M | 100% | Medium risk40 | —-0.053 |
| 353 | 21NG0108REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS SURIGAO-DAVAO COASTAL RD K1180+150-K1180+180, K1180+226.225-K1180+400, K1182+150-K1182+290, K1196+180-K1196+334.06, K1196+540-K1196+660/ CLAVER, SU | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱46.6M | 100% | Medium risk40 | —-0.084 |
| 354 | 22NF0074PREVENTIVE MAINTENANCE ALONG DAPA-JCT. CANCOHOY RD-K0015+150-K0018+678 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱57.3M | 100% | Medium risk39 | —-0.080 |
| 355 | 18EI0094CONSTRUCTION OF SAN ROQUE - SAN JUAN - TAFARMA ROAD, INCLUDING BRIDGE, BRGY. SAN JUAN, BULALACAO, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱37.5M | 100% | Medium risk39 | —-0.065 |
| 356 | 22EI0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - BRIDGES FROM THE NATIONAL ROADS, CONSTRUCTION OF BRIDGE, BARANGAY SABANG, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱27.5M | 100% | Medium risk39 | —-0.054 |
| 357 | 18EH0036CONSTRUCTION OF SAWANG FLOOD CONTROL STRUCTURE ALONG ROMBLON - COGON - SABLAYAN CIRCUMFERENTIAL ROAD, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱43.1M | 100% | Medium risk39 | —-0.071 |
| 358 | 18EH0035CONSTRUCTION OF LUNAS FLOOD CONTROL STRUCTURE ALONG ROMBLON - COGON - SABLAYAN CIRCUMFERENTIAL ROAD, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱42.6M | 100% | Medium risk39 | —-0.071 |
| 359 | 19NG0127CONSTRUCTION OF THREE STOREY 12 CLASSROOM SCHOOL BUILDING/CLAVER CENTRAL ELEM. SCHOOL, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱43.3M | 100% | Medium risk39 | —-0.027 |
| 360 | 21EI0102WIDENING OF PERMANENT BRIDGES - QUINABIGAN BR. (B00035MR) ALONG CALAPAN SOUTH RD., PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱30M | 100% | Medium risk39 | —-0.051 |
| 361 | 23ED0005REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CSR JCT - MINAS RD - K0046+800 - K0048+135, VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱33.4M | 100% | Medium risk38 | —-0.093 |
| 362 | 19EI0051CONSTRUCTION OF MIRAYAN BAILEY BRIDGE AT SITIO CENTRO - SITIO LIBASAN, GLORIA, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱7.2M | 100% | Medium risk38 | —-0.054 |
| 363 | 22NF0061CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SOCORRO-NUEVA ESTRELLA ROAD, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱57.3M | 100% | Medium risk38 | —-0.081 |
| 364 | 18EI0054CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CAVILLIAN RIVER CONTROL STRUCTURES, BULALACAO, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱28.2M | 100% | Medium risk38 | —-0.074 |
| 365 | 19EA0025ASSET PRESERVATION-REHABILITATION/UPGRADING OF DAMAGED PAVED ROADS, TERTIARY ROADS, DR. DAMIAN REYES ROAD (TORRIJOS SIDE)-K0048+154-K0049+223 | Region IV-B | Marinduque DEO | Completed | ₱39M | 100% | Medium risk38 | —-0.090 |
| 366 | 21EI0092WIDENING OF PERMANENT BRIDGE: LABASAN BR. (B00053MR) ALONG CALAPAN SOUTH ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱18.5M | 100% | Medium risk38 | —-0.055 |
| 367 | 21EI0006WIDENING OF PERMANENT BRIDGES - DALAPIAN BR. (B00052MR) ALONG CALAPAN SOUTH ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱18.2M | 100% | Medium risk38 | —-0.055 |
| 368 | 20EI0159CONSTRUCTION OF BRIDGE, BRGY. BANGBANG, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱14.5M | 100% | Medium risk38 | —-0.054 |
| 369 | 20NC0066REHABILITATION OF MINABANG CREEK, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱21M | 100% | Medium risk38 | —-0.061 |
| 370 | 19EA0080CONSTRUCTION OF CABUYO FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+350.00, TORRIJIS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱39.2M | 100% | Medium risk38 | —-0.076 |
| 371 | 21EA0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0075 + 130 - K0075 + 320 | Region IV-B | Marinduque DEO | Completed | ₱32.5M | 100% | Medium risk38 | —-0.092 |
| 372 | 19EA0082CONSTRUCTION OF CABUYO FLOOD CONTROL STRUCTURE. STA. 0+970.00-STA. 1+370.00, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱29.4M | 100% | Medium risk38 | —-0.072 |
| 373 | 19EA0024ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL ROAD - K0096+000 - K0096+893, K0104+510 - K0104+793, GASAN, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱36.7M | 100% | Medium risk38 | —-0.091 |
| 374 | 20EI0027WIDENING OF PERMANENT BRIDGES, PAG - ASA BR., (B00045MR) ALONG CALAPAN SOUTH ROAD, BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱15.3M | 100% | Medium risk38 | —-0.051 |
| 375 | 20EI0024WIDENING OF PERMANENT BRIDGES: CONCEPCION BR., (B00048MR) ALONG CALAPAN SOUTH ROAD, BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱15.5M | 100% | Medium risk38 | —-0.052 |