Contractor dossier
411 projects on file, including joint ventures this contractor is part of.
Total projects
411
Total budget
₱32.9B
Average progress
94.7%
Completion rate
85.4%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
41
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 105 | ₱7.6B | 48.9 | 5 | 98.8% |
| Region XIII | 86 | ₱6.5B | 46.3 | 4 | 96.2% |
| Region VI | 82 | ₱6.8B | 62.2 | 16 | 87.7% |
| Region XI | 64 | ₱5.6B | 58.3 | 7 | 93.9% |
| Region IV-A | 21 | ₱1.8B | 63.0 | 0 | 100.0% |
| Cordillera Administrative Region | 17 | ₱1.9B | 57.2 | 1 | 100.0% |
| Region IX | 10 | ₱610.9M | 66.9 | 7 | 72.0% |
| Region V | 6 | ₱590.3M | 61.8 | 0 | 100.0% |
| Region X | 4 | ₱431.4M | 56.7 | 0 | 100.0% |
| Region XII | 4 | ₱201.3M | 31.3 | 0 | 100.0% |
| Region VIII | 3 | ₱327.1M | 58.0 | 1 | 87.6% |
| Negros Island Region | 3 | ₱171.9M | 57.5 | 0 | 100.0% |
| Region VII | 2 | ₱57.9M | 49.4 | 0 | 95.8% |
| National Capital Region | 2 | ₱96.1M | 48.4 | 0 | 100.0% |
| Region III | 1 | ₱122M | 51.7 | 0 | 100.0% |
| Region II | 1 | ₱49M | 48.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 173 | ₱15.2B | 51.6 | 2 | 97.8% |
| Flood Control and Drainage | 99 | ₱7.7B | 52.1 | 10 | 93.4% |
| Bridges | 62 | ₱3.9B | 51.0 | 8 | 95.0% |
| OTHER | 25 | ₱2.3B | 77.7 | 9 | 93.5% |
| Buildings and Facilities | 23 | ₱788.9M | 43.3 | 1 | 94.7% |
| Bridges, Roads | 17 | ₱2.3B | 61.5 | 3 | 95.0% |
| GAA 2025 SSP | 5 | ₱334.1M | 94.1 | 4 | 49.9% |
| GAA 2025 OO-2 | 3 | ₱174.1M | 88.0 | 2 | 68.6% |
| GAA 2025 OO-1 | 2 | ₱173.7M | 95.3 | 2 | 51.3% |
| Water Provision and Storage | 2 | ₱32.4M | 58.2 | 0 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LUNA - JALANDONI FLYOVER (B00483PN) ALONG JALANDONI FLYOVER | Region VI | Region VI | On-Going | ₱77.3M | 58% | High risk95 | Flagged0.011 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 25ED0025REHABILITATION OF BRIDGE, BARANGAY TACLIGAN, SAN TEODORO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱29.7M | 100% | High risk89 | —-0.015 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 25NI0027CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MAIN CANAL STA. 0 + 280 - STA. 0 + 384.60; STA. 0 + 744.34 - STA. 0 + 920; STA. 1 + 650 - STA. 2 +100 BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 77% | High risk85 | Flagged0.002 |
| 25NI0026CONSTRUCTION OF RETAINING WALL ALONG MAIN CANAL SERVICE ROAD, STA. 0 + 643.10 - STA. 0+ 943.10, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 93% | High risk85 | —-0.003 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 18GP0052ROAD WIDENING ILOILO - CAPIZ RD (NEW ROUTE) - K0081+090 - K0081+692, K0085+045.30 - K0085+122, K0085+166.50 - K0085+279.90, K0087+247.90 - K0087+602.50, K0093+964 - K0095+378 | Region VI | Capiz 2nd DEO | Completed | ₱96.5M | 100% | High risk84 | —-0.016 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 18GP0053CONSTRUCTION OF CONCRETE ROAD - GUINTAS - PINAMALATICAN ROAD, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱93.6M | 100% | High risk82 | —-0.017 |
| 19E00033CONST./IMPROVEMENT OF SAN JOSE CIRCUMFERENTIAL ROAD, STA. 8+532.00 - STA. 8+840.00, SAN JOSE, ROMBLON | Region IV-B | Region IV-B | Completed | ₱106M | 100% | High risk81 | Flagged0.002 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 24NG0051CONSTRUCTION OF SEAWALL/BARANGAY TALISAY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.5M | 89% | High risk79 | Flagged0.012 |
| 24GP0018ROAD WIDENING - ILOILO-CAPIZ RD (NEW ROUTE) - K0096+069 - K0096+715 | Region VI | Capiz 2nd DEO | On-Going | ₱34.2M | 91% | High risk78 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21G00205BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱171.9M | 9% | High risk74 | Flagged0.079 |
| 23G00099UNGKA FLYOVER MODIFICATION AND RESTORATION WORKS | Region VI | Region VI | On-Going | ₱96.5M | 6% | High risk64 | Flagged0.070 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 18II0053CONSTRUCTION OF MONDRAGON - SILVINO LUBOS ROAD (PHASE 5) STA. 10+040 - STA. 13+480, SILVINO LUBOS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱227.5M | 100% | High risk65 | Flagged0.045 |
| 24GA0251CONSTRUCTION OF REVETMENT WALL (FLOOD CONTROL), ALONG AKLAN RIVER, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱24.1M | 89% | High risk73 | Flagged0.038 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 24GA0252CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG AKLAN RIVER, BARANGAY DAJA SUR, BANGA, AKLAN | Region VI | Aklan DEO | On-Going | ₱19.2M | 91% | High risk73 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23E00006SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, SITIO ULONG, MOGPOG, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk65 | —-0.039 |
| 77 | 24GA0017CONSTRUCTION OF REVETMENT WALL ALONG MALINAO RIVER BRGY. SAN ROQUE, MALINAO, AKLAN (PACKAGE 2) | Region VI | Aklan DEO | On-Going | ₱94.1M | 81% | High risk65 | —-0.020 |
| 78 | 17ED0019CONSTRUCTION OF DULANGAN RIVER CONTROL (GABIONS), BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱45.7M | 100% | High risk65 | —-0.043 |
| 79 | 17EH0031CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG TABLAS CIRCUMFERENTIAL ROAD,K0084 + 000 - K0090 + 210, K0120 + 920 - K00124 + 010.00, K0128 + 000 - K0129 + 020 (AS PER RBIA), TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱84.1M | 100% | High risk65 | —-0.048 |
| 80 | 25E00192SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONSTRUCTION OF BRIDGE, BRGY. TABUK, STA. 000+080.00-STA. 000+140.00, SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱112.3M | 42% | High risk64 | —-0.024 |
| 81 | 22FL0048CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) BULAN-MATNOG-STA. MAGDA | Region V | Sorsogon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.085 |
| 82 | 17ED0018CONSTRUCTION OF DEL PILAR RIVER CONTROL (GABION), STA. 0+000 - STA. 0+680, NAUJAN, ORIENTAL MINDORO 1ST LD, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱42.5M | 100% | High risk64 | —-0.041 |
| 83 | 25GA0025CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AKLAN RIVER, PACKAGE 3, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱98.4M | 92% | High risk64 | —-0.028 |
| 84 | 18L00020WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCL. SLOPE PROTECTION & ROW(BRGY. BAGANIHAN SECT.),D | Region XI | Region XI | Completed | ₱189.8M | 100% | High risk64 | —-0.039 |
| 85 | 18G00018METRO ILOILO RADIAL ROAD (R-4 BYPASS ROAD INCL. BRIDGE, ILOILO CITY | Region VI | Region VI | Completed | ₱137.1M | 100% | High risk64 | —-0.038 |
| 86 | 24GA0024CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER BARANGAY POBLACION, MALINAO, AKLAN | Region VI | Aklan DEO | On-Going | ₱96.5M | 86% | High risk64 | —-0.021 |
| 87 | 23G00099UNGKA FLYOVER MODIFICATION AND RESTORATION WORKS | Region VI | Region VI | On-Going | ₱96.5M | 6% | High risk64 | Flagged0.070 |
| 88 | 19GP0020CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BRGY. ANGUB, CUARTERO, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.061 |
| 89 | 20K00073CONSTRUCTION OF IPONAN FLOOD CONTROL PROJECT (DOWNSTREAM OF IPONAN BRIDGE III), BULUA SIDE, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱179.7M | 100% | High risk64 | —-0.050 |
| 90 | 24GB0107CLUSTER 1 (8 PROJECTS), ANTIQUE | Region VI | Antique DEO | Completed | ₱94.9M | 100% | High risk63 | —-0.039 |
| 91 | 19G00054REHABILITATION/MAJOR REPAIR OF BRIDGE - TIBIAO BR. (B00346PN) ALONG ILOILO - ANTIQUE RD | Region VI | Region VI | Completed | ₱94.4M | 100% | High risk63 | —-0.036 |
| 92 | 18E00052ROAD WIDENING OF CALAPAN SOUTH ROAD, KO064+(-780)-KO064+(-320); KO064+(-200)-KO064+328; KO064+456-KO064+638; KO064+822-KO066+680; KO066+868-KO069+053; KO069+356-KO071+160; KO071+273-KO072+128; KO072+241-KO072+445; KO072+628-KO073+687; KO073+794-KO074+640, | Region IV-B | Region IV-B | Completed | ₱204.4M | 100% | High risk63 | —-0.055 |
| 93 | 19G00062CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD ALONG BARANGAY COMON - SAN PEDRO COASTAL ROAD LEADING TO SAN JOSE PORT AND BEACHES, RESORTS AND SUNSET VIEWING, SAN JOSE, ANTIQUE | Region VI | Region VI | Completed | ₱144.7M | 100% | High risk63 | —-0.020 |
| 94 | 23GB0090REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER I- CAIRAWAN BR.(B00334PN) ALONG ILOILO-ANT | Region VI | Antique DEO | On-Going | ₱105.6M | 96% | High risk63 | Flagged0.002 |
| 95 | 18E00006CONSTRUCTION OF MISSING LINK ON VICTORIA-SABLAYAN (MINDORO CROSS ISLAND ROAD), STA. 0+000.00 - STA. 1+908.00, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱140.3M | 100% | High risk63 | —-0.066 |
| 96 | 20L00133INSTALLATION OF ROCKFALL NETTING ALONG DAVAO CITY DIVERSION ROAD (S00013MN), K1511+420 - K1511+524, DAVAO CITY | Region XI | Region XI | Completed | ₱121.7M | 100% | High risk63 | —-0.073 |
| 97 | 21L00034CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES ALONG DAVAO CITY DIVERSION ROAD (S00013MN), K1511+524-K1511+633, DAVAO CITY | Region XI | Region XI | Completed | ₱123.7M | 100% | High risk63 | —-0.073 |
| 98 | 19L00030RECONSTRUCTION OF CONCRETE PAVEMENT-ALTERNATE ROAD FROM REGION XI TO REGION X, PACKAGE 3B,DAVAO CITY | Region XI | Region XI | Completed | ₱119.9M | 100% | High risk63 | —-0.071 |
| 99 | 22FK0086CLUSTER XXXVII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP) ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROADS_LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES- 1.) CONSTRUCTION OF ACCESS ROAD LEADING TO JUVEN | Region V | Sorsogon DEO | Completed | ₱69.3M | 100% | High risk63 | —-0.093 |
| 100 | 23LH0097CONSTRUCTION OF BRIDGE ACROSS DAVAO RIVER CONNECTING BRGY. DACUDAO AND BRGY. DOMINGA, CALINAN DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.043 |