Opening the dossier…
Opening the dossier…
Contractor dossier
411 projects on file, including joint ventures this contractor is part of.
Total projects
411
Total budget
₱32.9B
Average progress
94.7%
Completion rate
85.4%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
41
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 105 | ₱7.6B | 48.9 | 5 | 98.8% |
| Region XIII | 86 | ₱6.5B | 46.3 | 4 | 96.2% |
| Region VI | 82 | ₱6.8B | 62.2 | 16 | 87.7% |
| Region XI | 64 | ₱5.6B | 58.3 | 7 | 93.9% |
| Region IV-A | 21 | ₱1.8B | 63.0 | 0 | 100.0% |
| Cordillera Administrative Region | 17 | ₱1.9B | 57.2 | 1 | 100.0% |
| Region IX | 10 | ₱610.9M | 66.9 | 7 | 72.0% |
| Region V | 6 | ₱590.3M | 61.8 | 0 | 100.0% |
| Region X | 4 | ₱431.4M | 56.7 | 0 | 100.0% |
| Region XII | 4 | ₱201.3M | 31.3 | 0 | 100.0% |
| Region VIII | 3 | ₱327.1M | 58.0 | 1 | 87.6% |
| Negros Island Region | 3 | ₱171.9M | 57.5 | 0 | 100.0% |
| Region VII | 2 | ₱57.9M | 49.4 | 0 | 95.8% |
| National Capital Region | 2 | ₱96.1M | 48.4 | 0 | 100.0% |
| Region III | 1 | ₱122M | 51.7 | 0 | 100.0% |
| Region II | 1 | ₱49M | 48.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 173 | ₱15.2B | 51.6 | 2 | 97.8% |
| Flood Control and Drainage | 99 | ₱7.7B | 52.1 | 10 | 93.4% |
| Bridges | 62 | ₱3.9B | 51.0 | 8 | 95.0% |
| OTHER | 25 | ₱2.3B | 77.7 | 9 | 93.5% |
| Buildings and Facilities | 23 | ₱788.9M | 43.3 | 1 | 94.7% |
| Bridges, Roads | 17 | ₱2.3B | 61.5 | 3 | 95.0% |
| GAA 2025 SSP | 5 | ₱334.1M | 94.1 | 4 | 49.9% |
| GAA 2025 OO-2 | 3 | ₱174.1M | 88.0 | 2 | 68.6% |
| GAA 2025 OO-1 | 2 | ₱173.7M | 95.3 | 2 | 51.3% |
| Water Provision and Storage | 2 | ₱32.4M | 58.2 | 0 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LUNA - JALANDONI FLYOVER (B00483PN) ALONG JALANDONI FLYOVER | Region VI | Region VI | On-Going | ₱77.3M | 58% | High risk95 | Flagged0.011 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 25ED0025REHABILITATION OF BRIDGE, BARANGAY TACLIGAN, SAN TEODORO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱29.7M | 100% | High risk89 | —-0.015 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 25NI0027CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MAIN CANAL STA. 0 + 280 - STA. 0 + 384.60; STA. 0 + 744.34 - STA. 0 + 920; STA. 1 + 650 - STA. 2 +100 BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 77% | High risk85 | Flagged0.002 |
| 25NI0026CONSTRUCTION OF RETAINING WALL ALONG MAIN CANAL SERVICE ROAD, STA. 0 + 643.10 - STA. 0+ 943.10, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 93% | High risk85 | —-0.003 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 18GP0052ROAD WIDENING ILOILO - CAPIZ RD (NEW ROUTE) - K0081+090 - K0081+692, K0085+045.30 - K0085+122, K0085+166.50 - K0085+279.90, K0087+247.90 - K0087+602.50, K0093+964 - K0095+378 | Region VI | Capiz 2nd DEO | Completed | ₱96.5M | 100% | High risk84 | —-0.016 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 18GP0053CONSTRUCTION OF CONCRETE ROAD - GUINTAS - PINAMALATICAN ROAD, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱93.6M | 100% | High risk82 | —-0.017 |
| 19E00033CONST./IMPROVEMENT OF SAN JOSE CIRCUMFERENTIAL ROAD, STA. 8+532.00 - STA. 8+840.00, SAN JOSE, ROMBLON | Region IV-B | Region IV-B | Completed | ₱106M | 100% | High risk81 | Flagged0.002 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 24NG0051CONSTRUCTION OF SEAWALL/BARANGAY TALISAY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.5M | 89% | High risk79 | Flagged0.012 |
| 24GP0018ROAD WIDENING - ILOILO-CAPIZ RD (NEW ROUTE) - K0096+069 - K0096+715 | Region VI | Capiz 2nd DEO | On-Going | ₱34.2M | 91% | High risk78 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21G00205BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱171.9M | 9% | High risk74 | Flagged0.079 |
| 23G00099UNGKA FLYOVER MODIFICATION AND RESTORATION WORKS | Region VI | Region VI | On-Going | ₱96.5M | 6% | High risk64 | Flagged0.070 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 18II0053CONSTRUCTION OF MONDRAGON - SILVINO LUBOS ROAD (PHASE 5) STA. 10+040 - STA. 13+480, SILVINO LUBOS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱227.5M | 100% | High risk65 | Flagged0.045 |
| 24GA0251CONSTRUCTION OF REVETMENT WALL (FLOOD CONTROL), ALONG AKLAN RIVER, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱24.1M | 89% | High risk73 | Flagged0.038 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 24GA0252CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG AKLAN RIVER, BARANGAY DAJA SUR, BANGA, AKLAN | Region VI | Aklan DEO | On-Going | ₱19.2M | 91% | High risk73 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24GL0087INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG BINALBAGAN-ISABELA ROAD (S00419NR), NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱98M | 100% | Medium risk58 | —-0.080 |
| 152 | 19P00021LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - REHABILITATION / IMPROVEMENT WITH SLIP, SOIL COLLAPSE AND LANDSLIDES ALONG ABRA - KALINGA ROAD, KO454+396 - KO454+448, KO454+516 - KO454+645 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱97.4M | 100% | Medium risk58 | —-0.072 |
| 153 | 19P00028REPAIR / REHABILITATION / IMPROVEMENT OF POBLACION - CABAROAN FLOOD CONTROL, TAYUM, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱89.3M | 100% | Medium risk58 | —-0.004 |
| 154 | 21P00041ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS ITOGON - DALUPIRIP - SN MANUEL BDRY ROADKO275+510 - | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱279.9M | 100% | Medium risk58 | —-0.046 |
| 155 | 20P00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B) | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱234.2M | 100% | Medium risk58 | —-0.048 |
| 156 | 22E00004CONSTRUCTION OF MISSING LINKS/NEW ROADS-DR. DAMIAN REYES ROAD (BOAC SIDE), PACKAGE 1, STA. 33+220.00-STA. 34+020.00, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱125.4M | 100% | Medium risk58 | —-0.071 |
| 157 | 19P00035REPAIR/REHABILITATION/IMPROVEMENT OF BITUEN - LACUB ROAD, LENNENG, BAAY - LICUAN, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱89M | 100% | Medium risk58 | —-0.002 |
| 158 | 19P00036REPAIR/REHABILITATION/IMPROVEMENT OF LIBSONG - POBLACION ROAD, GUINGUINABANG, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱86.5M | 100% | Medium risk57 | —-0.005 |
| 159 | 20LH0069CONSTRUCTION OF MULTI-PURPOSE BUILDING, UP MINDANAO CAMPUS, PHASE 4, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.067 |
| 160 | 17ED0036REPLACEMENT OF MACATOC BRIDGE (B00026MR) ALONG CSR JCT. MINAS ROAD, VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱32.5M | 100% | Medium risk57 | —-0.026 |
| 161 | 21E00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULA RIVER AT BARANGAY SANTO NINO-PAGALAGALA-SANTA MARIA AND PAMBISAN MALAKI, STA. 0+376.40-STA. 1+156.85,ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk57 | —-0.062 |
| 162 | 23N00188REPAIR/ REHABILITATION AND IMPROVEMENT OF SURIGAO CITY BOULEVARD AND WHARF | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk56 | —-0.037 |
| 163 | 17NG0062CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF TUBURAN FLOOD CONTROL, BRGY. TUBURAN , DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱18.7M | 100% | Medium risk56 | —-0.038 |
| 164 | 20GA0120ROAD WIDENING ALONG AKLAN EAST ROAD K0306+291 -K0307+042, K0307+071 -K0308+449, K0308+479 -K0309+369, AKLAN EAST ROAD | Region VI | Aklan DEO | Completed | ₱91.3M | 100% | Medium risk56 | —-0.075 |
| 165 | 21IM0030INSTALLATION OF ROAD STUD (SOLAR), TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱74.9M | 100% | Medium risk56 | —-0.090 |
| 166 | 23LB0070CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BRGY. LANGUB-SITIO TINAGO, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | On-Going | ₱73.1M | 99% | Medium risk56 | —-0.038 |
| 167 | 23LB0069CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BRGY. LANGUB, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | On-Going | ₱73.1M | 99% | Medium risk56 | —-0.038 |
| 168 | 23LB0072CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, TINAGO-MATINA BIAO, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | Completed | ₱74.3M | 100% | Medium risk56 | —-0.082 |
| 169 | 17PJ0016CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - CONSTRUCTION OF NEW PERMANENT BRIDGES - PUGO BRIDGE ALONG ALFONSO LISTA - AURORA BOUNDARY ROAD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱32.8M | 100% | Medium risk56 | —-0.015 |
| 170 | 22LB0006CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DAVAO CITY DIV RD - K1511+907 - K1511+980 | Region XI | Davao City DEO | Completed | ₱87.3M | 100% | Medium risk56 | —-0.079 |
| 171 | 22LB0437CONSTRUCTION OF ROAD SLOPE PROTECTIONSTRUCTURE - DAVAO CITY DIV RD - K1511 +837 - K1511 + 890 | Region XI | Davao City DEO | Completed | ₱76.9M | 100% | Medium risk56 | —-0.082 |
| 172 | 24L00020OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF SIDEWALK - BYPASS ROAD AT JCT. DAANG MAHARLIKA ROAD - MUDIANG - MALAGAMOT - INDANGAN - CABANTIAN - TIGATTO ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱76.6M | 50% | Medium risk56 | —-0.029 |
| 173 | 21L00050CONSTRUCTION OF DRAINAGE STRUCTURE - BYPASS ROAD AT MALAGAMOT ROAD - JCT. MUDIANG ROAD, PHASE II, DAVAO CITY | Region XI | Region XI | Completed | ₱77.8M | 100% | Medium risk56 | —-0.058 |
| 174 | 21LB0273JCT. 5TH AVE - SOLIMAN ST. - JCT LEON GARCIA ST, BARANGAY 27-C AND BARANGAY KAP TOMAS MONTEVERDE, SR., DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱79.7M | 40% | Medium risk56 | —-0.005 |
| 175 | 23LB0071CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE AT MINI-BYPASS, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | Completed | ₱74.3M | 100% | Medium risk55 | —-0.080 |