Contractor dossier
411 projects on file, including joint ventures this contractor is part of.
Total projects
411
Total budget
₱32.9B
Average progress
94.7%
Completion rate
85.4%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
41
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 105 | ₱7.6B | 48.9 | 5 | 98.8% |
| Region XIII | 86 | ₱6.5B | 46.3 | 4 | 96.2% |
| Region VI | 82 | ₱6.8B | 62.2 | 16 | 87.7% |
| Region XI | 64 | ₱5.6B | 58.3 | 7 | 93.9% |
| Region IV-A | 21 | ₱1.8B | 63.0 | 0 | 100.0% |
| Cordillera Administrative Region | 17 | ₱1.9B | 57.2 | 1 | 100.0% |
| Region IX | 10 | ₱610.9M | 66.9 | 7 | 72.0% |
| Region V | 6 | ₱590.3M | 61.8 | 0 | 100.0% |
| Region X | 4 | ₱431.4M | 56.7 | 0 | 100.0% |
| Region XII | 4 | ₱201.3M | 31.3 | 0 | 100.0% |
| Region VIII | 3 | ₱327.1M | 58.0 | 1 | 87.6% |
| Negros Island Region | 3 | ₱171.9M | 57.5 | 0 | 100.0% |
| Region VII | 2 | ₱57.9M | 49.4 | 0 | 95.8% |
| National Capital Region | 2 | ₱96.1M | 48.4 | 0 | 100.0% |
| Region III | 1 | ₱122M | 51.7 | 0 | 100.0% |
| Region II | 1 | ₱49M | 48.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 173 | ₱15.2B | 51.6 | 2 | 97.8% |
| Flood Control and Drainage | 99 | ₱7.7B | 52.1 | 10 | 93.4% |
| Bridges | 62 | ₱3.9B | 51.0 | 8 | 95.0% |
| OTHER | 25 | ₱2.3B | 77.7 | 9 | 93.5% |
| Buildings and Facilities | 23 | ₱788.9M | 43.3 | 1 | 94.7% |
| Bridges, Roads | 17 | ₱2.3B | 61.5 | 3 | 95.0% |
| GAA 2025 SSP | 5 | ₱334.1M | 94.1 | 4 | 49.9% |
| GAA 2025 OO-2 | 3 | ₱174.1M | 88.0 | 2 | 68.6% |
| GAA 2025 OO-1 | 2 | ₱173.7M | 95.3 | 2 | 51.3% |
| Water Provision and Storage | 2 | ₱32.4M | 58.2 | 0 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LUNA - JALANDONI FLYOVER (B00483PN) ALONG JALANDONI FLYOVER | Region VI | Region VI | On-Going | ₱77.3M | 58% | High risk95 | Flagged0.011 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 25ED0025REHABILITATION OF BRIDGE, BARANGAY TACLIGAN, SAN TEODORO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱29.7M | 100% | High risk89 | —-0.015 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 25NI0027CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MAIN CANAL STA. 0 + 280 - STA. 0 + 384.60; STA. 0 + 744.34 - STA. 0 + 920; STA. 1 + 650 - STA. 2 +100 BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 77% | High risk85 | Flagged0.002 |
| 25NI0026CONSTRUCTION OF RETAINING WALL ALONG MAIN CANAL SERVICE ROAD, STA. 0 + 643.10 - STA. 0+ 943.10, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 93% | High risk85 | —-0.003 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 18GP0052ROAD WIDENING ILOILO - CAPIZ RD (NEW ROUTE) - K0081+090 - K0081+692, K0085+045.30 - K0085+122, K0085+166.50 - K0085+279.90, K0087+247.90 - K0087+602.50, K0093+964 - K0095+378 | Region VI | Capiz 2nd DEO | Completed | ₱96.5M | 100% | High risk84 | —-0.016 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 18GP0053CONSTRUCTION OF CONCRETE ROAD - GUINTAS - PINAMALATICAN ROAD, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱93.6M | 100% | High risk82 | —-0.017 |
| 19E00033CONST./IMPROVEMENT OF SAN JOSE CIRCUMFERENTIAL ROAD, STA. 8+532.00 - STA. 8+840.00, SAN JOSE, ROMBLON | Region IV-B | Region IV-B | Completed | ₱106M | 100% | High risk81 | Flagged0.002 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 24NG0051CONSTRUCTION OF SEAWALL/BARANGAY TALISAY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.5M | 89% | High risk79 | Flagged0.012 |
| 24GP0018ROAD WIDENING - ILOILO-CAPIZ RD (NEW ROUTE) - K0096+069 - K0096+715 | Region VI | Capiz 2nd DEO | On-Going | ₱34.2M | 91% | High risk78 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21G00205BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱171.9M | 9% | High risk74 | Flagged0.079 |
| 23G00099UNGKA FLYOVER MODIFICATION AND RESTORATION WORKS | Region VI | Region VI | On-Going | ₱96.5M | 6% | High risk64 | Flagged0.070 |
| 22G00148CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱162.9M | 38% | High risk85 | Flagged0.055 |
| 22LB0265CONSTRUCTION OF RETARDING BASIN PROTECTING NATIONAL ROAD, LA VERNASECTION, STA. 0+000 - STA. 0+500, DAVAOCITY | Region XI | Davao City DEO | On-Going | ₱279.9M | 99% | High risk80 | Flagged0.052 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 18II0053CONSTRUCTION OF MONDRAGON - SILVINO LUBOS ROAD (PHASE 5) STA. 10+040 - STA. 13+480, SILVINO LUBOS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱227.5M | 100% | High risk65 | Flagged0.045 |
| 24GA0251CONSTRUCTION OF REVETMENT WALL (FLOOD CONTROL), ALONG AKLAN RIVER, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱24.1M | 89% | High risk73 | Flagged0.038 |
| 23GB0091REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CLUSTER 2- ARAS-ASAN BR (B00426PN) ALONG ANINI-Y T | Region VI | Antique DEO | On-Going | ₱137.1M | 68% | High risk83 | Flagged0.036 |
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 24GA0252CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG AKLAN RIVER, BARANGAY DAJA SUR, BANGA, AKLAN | Region VI | Aklan DEO | On-Going | ₱19.2M | 91% | High risk73 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25GA0030IMPROVEMENT OF INTERSECTION AT AKLAN EAST RD - K0277 + 400 | Region VI | Aklan DEO | On-Going | ₱12.1M | 33% | High risk95 | Flagged0.028 |
| 24G00035CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 1) | Region VI | Region VI | On-Going | ₱147.2M | 79% | High risk84 | Flagged0.024 |
| 24G00038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, MADALAG, AKLAN (PACKAGE 2) | Region VI | Region VI | On-Going | ₱147.1M | 92% | High risk84 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | Region VI | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
| 25G00036CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱144.8M | 36% | High risk94 | Flagged0.018 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18E00050PAVING OF UNPAVED ROADS OF PARPAGOHA (MARGONDON)-BINOOG ROAD, K0025+751-K0027+732, ROMBLON | Region IV-B | Region IV-B | Completed | ₱117.7M | 100% | Medium risk55 | —-0.074 |
| 177 | 17EI0084WIDENING OF BRIDGE - NAWA BR. (B00061MR) ALONG CALAPAN SOUTH ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱28.6M | 100% | Medium risk55 | —-0.026 |
| 178 | 21LC0081CONSTRUCTION OF ROAD, NRJ AGUSAN - DAVAO ROAD GUADALUPE, CARMEN SECTION TO UPPER TUGANAY - MABAUS - KINAMAYAN - TIBAL-OG, STO. TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱78.8M | 100% | Medium risk55 | —-0.073 |
| 179 | 21LC0205CONCRETING OF ROAD, BARANGAY STA. CRUZ, TALICUD ISLAND TO PUROK TISA TO LETICIA BY THE SEA RESORT TO DRILON, LINDGREEN AND LANOS BEACHES, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱67.5M | 100% | Medium risk55 | —-0.066 |
| 180 | 19LH0059INTERSECTION IMPROVEMENT AND PROVISION OF TRAFFIC CONTROL AT DAVAO-BUKIDNON ROAD K1695+525 (SAN FRANCISCO ST. INTERSECTION) AND DAVAO-BUKIDNON ROAD K1683 +(-453)(DAVAO-BUKIDNON ROAD-CALINAN-BAGUIO-CADALIAN ROAD INTERSECTION), 3RD CONGRESSIONAL DIST., D.C. | Region XI | Davao City 2nd DEO | Completed | ₱59.6M | 100% | Medium risk55 | —-0.087 |
| 181 | 18EI0103CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, GALLEGO ROAD LEADING TO CASABANGAN BEACH AND MANGAL MARINE PROTECTED AREA (MMPA), INCL. BRIDGE, DON PEDRO, MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱91.7M | 100% | Medium risk55 | —-0.053 |
| 182 | 19LH0019REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE & LANDSLIDE ALONG DAVAO-BUKIDNON ROADS, K1631+000 TO K1631+107; K1631+362 TO K1631+523; K1631+792 TO K1631+845; K1659+600 TO K1659+660, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱63.5M | 100% | Medium risk54 | —-0.087 |
| 183 | 23GA0040ACCESS ROAD FROM MAKATO PROPER TO HAGACHAC LEADING TO BAYBAY BEACH & ALIBAGON BAKHAWAN PARK MAKATO, AKLAN | Region VI | Aklan DEO | Completed | ₱74.7M | 100% | Medium risk54 | —-0.041 |
| 184 | 19PG0040CONSTRUCTION OF TWO-STOREY (DPWH STANDARD DESIGN) OF IFUGAO 1ST DEO BUILDING, LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱48.5M | 100% | Medium risk54 | —-0.062 |
| 185 | 19LB0064WIDENING OF BRIDGE-BUNAWAN BR.1 (B01689MN) ALONG DAANG MAHARLIKA (MN) | Region XI | Davao City DEO | Completed | ₱56.6M | 100% | Medium risk54 | —-0.043 |
| 186 | 22LB0440CONSTRUCTION OF ROAD SLOPE PROTECTIONSTRUCTURE - DAVAO CITY DIV RD - K1511 +810 - K1511 + 837 | Region XI | Davao City DEO | Completed | ₱55.7M | 100% | Medium risk54 | —-0.088 |
| 187 | 25GA0029ACCESS ROAD FROM MAKATO PROPER TO HAGACHAC LEADING TO BAYBAY BEACH & ALIBAGON BAKHAWAN PARK, MAKATO, AKLAN | Region VI | Aklan DEO | On-Going | ₱57.8M | 75% | Medium risk54 | —-0.015 |
| 188 | 19P00001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW PERMANENT BRIDGES, DAMALIN BRIDGE (PHASE II), ALONG ABRA - CERVANTES RD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱67.6M | 100% | Medium risk54 | —-0.023 |
| 189 | 23G00005REHABILITATION OF BORACAY CIRCUMFERENTIAL ROAD, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | Completed | ₱77.2M | 100% | Medium risk54 | —-0.074 |
| 190 | 21L00074ROAD WIDENING - NABUNTURAN - NEW CORELLA - TAGUM ROAD (NEW CORELLA - TAGUM SECTION), DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱57.7M | 100% | Medium risk53 | —-0.071 |
| 191 | 25GA0016AKLAN EAST RD - K0296 + 579 - K0296 + 800, K0297 + 340 - K0298 + 000, K0314 + 845 - K0315 + 911, K0318 + 185 - K0318 + 270, K0319 + 920 - K0321 + 000, K0322 + 748 - K0323 + 185 | Region VI | Aklan DEO | On-Going | ₱84.2M | 78% | Medium risk53 | —-0.044 |
| 192 | 20GP0061REHABILITATION/RECONSTRUCTION/UPGRADING OF TAPAZ-JAMINDAN-ALTAVAS ROAD, K0104+500 - K0105+664, K0105+754 - K0107+060 | Region VI | Capiz 2nd DEO | Completed | ₱84M | 100% | Medium risk53 | —-0.073 |
| 193 | 21E00001CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BOAC-MOGPOG BYPASS ROAD, STA. 10+794.00-STA. 12+110.00, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱106.2M | 100% | Medium risk53 | —-0.073 |
| 194 | 25NG0001CONSTRUCTION OF SEAWALL/BRGY. IPIL, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱126.4M | 85% | Medium risk53 | —-0.026 |
| 195 | 20PA0119REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD, K0474+295-K0474+365, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱53.1M | 100% | Medium risk53 | —-0.080 |
| 196 | 19P00043REPAIR/REHABILITATION/IMPROVEMENT OF SAGSAPAT - POBLACION FLOOD CONTROL, VILLAVICIOSA, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱47.5M | 100% | Medium risk53 | —-0.006 |
| 197 | 22GB0007TIPULUAN BR. (B00391PN) ALONG ODIONG-SIBALOM-SAN REMIGIO-LEON RD | Region VI | Antique DEO | Completed | ₱67.6M | 100% | Medium risk53 | —-0.040 |
| 198 | 22GB0008SIBALOM BR. (B00317PN) ALONG ILOILO-ANTIQUE RD SIBALOM, ANTIQUE | Region VI | Antique DEO | Completed | ₱67.6M | 100% | Medium risk53 | —-0.045 |
| 199 | 21JD0042WIDENING OF PERMANENT BRIDGES POLANCO BRIDGE (BO0418MN) ALONG DIPOLOG-POLANCO-PIÑAN JCT. OROQUIETA ROAD (PHASE II) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱19M | 90% | Medium risk53 | Flagged0.003 |
| 200 | 25GA0134CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAKATO RIVER (MAKATO BYPASS ROAD), BARANGAY POBLACION, MAKATO, AKLAN | Region VI | Aklan DEO | On-Going | ₱86.2M | 46% | Medium risk53 | —-0.019 |