Contractor dossier
29 projects on file, including joint ventures this contractor is part of.
Total projects
29
Total budget
₱764.8M
Average progress
87.2%
Completion rate
75.9%
Average risk score
54.5
Medium risk on average, out of 100
Flagged as unusual
1
3.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 25 | ₱720.1M | 52.2 | 1 | 91.2% |
| Region III | 4 | ₱44.8M | 68.7 | 0 | 61.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 11 | ₱132.2M | 42.4 | 0 | 100.0% |
| Flood Control and Drainage | 8 | ₱447.7M | 55.5 | 0 | 92.3% |
| Roads | 4 | ₱63.7M | 68.8 | 0 | 49.6% |
| OTHER | 4 | ₱64M | 68.4 | 1 | 97.8% |
| Bridges, Roads | 1 | ₱47.5M | 73.8 | 0 | 0.0% |
| Bridges | 1 | ₱9.8M | 47.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DF0218CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BRIDGE/VIADUCT AND ROAD A | Region IV-A | Cavite 1st DEO | On-Going | ₱47.5M | 0% | High risk74 | —-0.010 |
| 25DF0114CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -SIPAG - ACCESS RDS &/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONST OF RD ALONG JULIAN RIVER ANABU SEC | Region IV-A | Cavite 1st DEO | On-Going | ₱47.5M | 0% | High risk70 | —-0.020 |
| 21DF0064LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT POBLACION I-B, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT WOODSITE, IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱8.4M | 91% | High risk69 | Flagged0.017 |
| 24C00114FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AMRIS UPPER MAASIM SLOPE PROTECTION,SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱28.5M | 49% | High risk69 | —-0.011 |
| 25CP0006ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE - TERTIARY ROADS-STA RITA- CAMIAS OLD RD - SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱6.3M | 0% | High risk69 | —-0.016 |
| 24C00502BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS,BRGY. STA. INES, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱4.9M | 99% | High risk69 | —-0.040 |
| 25DF0062ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY. MALAGASANG I-C, IMU | Region IV-A | Cavite 1st DEO | On-Going | ₱29.1M | 90% | High risk68 | —-0.027 |
| 21DF0065LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT BUCANDALA 4, IMUS; CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT CARSADANG BAGO, IM | Region IV-A | Cavite 1st DEO | Completed | ₱11.9M | 100% | High risk68 | —-0.043 |
| 24C00503BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROADS, BRGY. LAMBAKIN, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱4.9M | 100% | High risk68 | —-0.068 |
| 18DF0090LOCAL PROGRAM -LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), BRGY. PASONG BUAYA 2; VALLEJO PLACE SUBDIVISION, BRGY. PASONG BUAYA 2; LA JOYA SUBD., BUHAY NA TU | Region IV-A | Cavite 1st DEO | Completed | ₱25.4M | 100% | High risk68 | —-0.042 |
| 20DF0060LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PASONG BUAYA I, IMUS CITY; CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TANZANG LUMA I, IMUS CITY; CONSTRUC | Region IV-A | Cavite 1st DEO | Completed | ₱18.3M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21DF0064LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT POBLACION I-B, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT WOODSITE, IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱8.4M | 91% | High risk69 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DF0218CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BRIDGE/VIADUCT AND ROAD A | Region IV-A | Cavite 1st DEO | On-Going | ₱47.5M | 0% | High risk74 | —-0.010 |
| 2 | 25DF0114CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -SIPAG - ACCESS RDS &/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONST OF RD ALONG JULIAN RIVER ANABU SEC | Region IV-A | Cavite 1st DEO | On-Going | ₱47.5M | 0% | High risk70 | —-0.020 |
| 3 | 21DF0064LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT POBLACION I-B, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT WOODSITE, IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱8.4M | 91% | High risk69 | Flagged0.017 |
| 4 | 24C00114FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AMRIS UPPER MAASIM SLOPE PROTECTION,SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱28.5M | 49% | High risk69 | —-0.011 |
| 5 | 25CP0006ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE - TERTIARY ROADS-STA RITA- CAMIAS OLD RD - SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱6.3M | 0% | High risk69 | —-0.016 |
| 6 | 24C00502BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS,BRGY. STA. INES, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱4.9M | 99% | High risk69 | —-0.040 |
| 7 | 25DF0062ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY. MALAGASANG I-C, IMU | Region IV-A | Cavite 1st DEO | On-Going | ₱29.1M | 90% | High risk68 | —-0.027 |
| 8 | 21DF0065LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT BUCANDALA 4, IMUS; CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT CARSADANG BAGO, IM | Region IV-A | Cavite 1st DEO | Completed | ₱11.9M | 100% | High risk68 | —-0.043 |
| 9 | 24C00503BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROADS, BRGY. LAMBAKIN, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱4.9M | 100% | High risk68 | —-0.068 |
| 10 | 18DF0090LOCAL PROGRAM -LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), BRGY. PASONG BUAYA 2; VALLEJO PLACE SUBDIVISION, BRGY. PASONG BUAYA 2; LA JOYA SUBD., BUHAY NA TU | Region IV-A | Cavite 1st DEO | Completed | ₱25.4M | 100% | High risk68 | —-0.042 |
| 11 | 20DF0060LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PASONG BUAYA I, IMUS CITY; CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TANZANG LUMA I, IMUS CITY; CONSTRUC | Region IV-A | Cavite 1st DEO | Completed | ₱18.3M | 100% | High risk68 | —-0.042 |
| 12 | 23DF0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST. OF REVETMENT ALONG JULIAN RIVER, BARANGAY MALAGASANG I-D, WEST SIDE, IMUS | Region IV-A | Cavite 1st DEO | Completed | ₱91.7M | 100% | Medium risk55 | —-0.078 |
| 13 | 22DF0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVER, BRGY, MALAGASANG II-A, WEST | Region IV-A | Cavite 1st DEO | Completed | ₱90.7M | 100% | Medium risk55 | —-0.079 |
| 14 | 24DF0151ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY. MALAGASANG 1-F, WEST SIDE | Region IV-A | Cavite 1st DEO | Completed | ₱72.4M | 100% | Medium risk52 | —-0.082 |
| 15 | 19DF0001LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHERSTRUCTURES, MULTIPURPOSE/FACILITIES -CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) AT BAYAN LUMA I; BAYAN LUMA III; DREAMVILLE 5, CARSADANG BAGO II; MALAGASANG; PAG-ASA I; RICHMON | Region IV-A | Cavite 1st DEO | Completed | ₱23M | 100% | Medium risk51 | —-0.100 |
| 16 | 18DF0031LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT) AT HOLIDAY VILLAGE; BRGY. TOCLONG 1C; CITILANE SUBDIVISION, BRGY. MALAGASANG 2; GREEN CITY SUBDIVISION, BRGY. | Region IV-A | Cavite 1st DEO | Completed | ₱26.3M | 100% | Medium risk51 | —-0.101 |
| 17 | 18DQ0079LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/ FACILITIES- CONSTRUCTION OF MULTIPURPOSE HALL, BACOOR, CAVITE, CONSTRUCTION OF MULTIPURPOSE BUILDING, LIGAS LLL, BACOOR CITY, CAVITE, CONSTRUCTION/ REHABILITATIO | Region IV-A | Region IV-A | Completed | ₱12.6M | 100% | Medium risk50 | —-0.104 |
| 18 | 18DF0059LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), DEXTERVILLE HOMES; PALLAS ATHENA CLASSIQUE EXECUTIVE VILLAGE; PASONG BUAYA PHASE 11A; LA TERRAZA | Region IV-A | Cavite 1st DEO | Completed | ₱18.3M | 100% | Medium risk50 | —-0.102 |
| 19 | 21DF0035LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT ALAPAN II, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT ANABU 1, IMUS, CAV | Region IV-A | Cavite 1st DEO | Completed | ₱6.9M | 100% | Medium risk50 | —-0.104 |
| 20 | 20DF0029ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 21 | 21DF0110ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 22 | 20DF0173LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. MEDICION II-D, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.104 |
| 23 | 21DF0194CONSTRUCTION/REHABILITATION OF BRIDGE AT MARIANO ESPELETA III, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.066 |
| 24 | 18DF0035ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS;FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BRGY. A | Region IV-A | Cavite 1st DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.087 |
| 25 | 18DF0150CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT PALICO ELEMENTARY SCHOOL,IMUS CITY | Region IV-A | Cavite 1st DEO | Completed | ₱26M | 100% | Medium risk46 | —-0.054 |