Contractor dossier
143 projects on file, including joint ventures this contractor is part of.
Total projects
143
Total budget
₱4.2B
Average progress
98.7%
Completion rate
86.0%
Average risk score
44.1
Medium risk on average, out of 100
Flagged as unusual
4
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 43 | ₱1B | 48.7 | 1 | 99.7% |
| Region X | 39 | ₱815.6M | 37.7 | 0 | 99.6% |
| Region VII | 23 | ₱1.1B | 50.4 | 3 | 95.8% |
| Region XI | 13 | ₱220.3M | 31.3 | 0 | 99.1% |
| Region IV-A | 10 | ₱331.2M | 46.9 | 0 | 98.8% |
| Region XIII | 5 | ₱55.3M | 34.5 | 0 | 100.0% |
| Region VIII | 4 | ₱386M | 60.6 | 0 | 100.0% |
| Negros Island Region | 2 | ₱61.5M | 61.0 | 0 | 100.0% |
| Region XII | 2 | ₱15.6M | 25.7 | 0 | 100.0% |
| Region IV-B | 1 | ₱140.3M | 61.7 | 0 | 63.4% |
| Region VI | 1 | ₱86.4M | 52.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 64 | ₱740M | 38.7 | 0 | 99.8% |
| Roads | 46 | ₱2B | 48.3 | 1 | 98.2% |
| Flood Control and Drainage | 21 | ₱1.2B | 51.9 | 1 | 96.1% |
| Buildings and Facilities | 8 | ₱108.7M | 33.0 | 0 | 99.3% |
| OTHER | 2 | ₱61.2M | 75.6 | 1 | 100.0% |
| Water Provision and Storage | 2 | ₱53.9M | 48.0 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JD0002REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, SINDANGAN-LILOY RD - K1938 + 835 - K1938 + 905, K1939 +000 -0K1939 + 080, K1939 + 150 - K1939 + 285, K1939 + 400 - K1939 + 540, K1939 + 925 - K1940 + 140, ZAMB | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱48.7M | 100% | High risk78 | Flagged0.003 |
| 19GL0068RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE TALABAN BR. (B00367NR) ALONG BACOLOD SOUTH RD | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱12.5M | 100% | High risk73 | —-0.036 |
| 22H00025ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TAYUD CAUSEWAY, BARANGAY TAYUD, STA. 0+000 STA. 0+850, CO | Region VII | Region VII | Completed | ₱115.8M | 100% | High risk64 | —-0.062 |
| 23JJ0027REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, LILOY-SIOCON RD - K2043 + 550 - K2043 + 642 | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱82M | 100% | High risk63 | —-0.075 |
| 23H00038ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk63 | —-0.064 |
| 21LB0293CONSTRUCTION OF REVETMENT ALONG MATINA RIVER, OUTFALL SECTION, STA. 0+465 TO STA. 0+790, LEFT BANK, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱94.3M | 100% | High risk63 | —-0.044 |
| 21JG0090CONSTRUCTION OF MISSING LINK/NEW ROAD ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD (BAGONG KAHAYAG - BULULAWAN SECTION), BRGY. BAGONG KAHAYAG, LAKEWOOD, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱73.1M | 100% | High risk62 | —-0.021 |
| 24JD0044WIDENING OF PERMANENT BRIDGES, POLANDOC BRIDGE (B00523MN0 ALONG SINDANGAN-LILOY ROAD (PHASE II), LEON B. POSTIGO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱81.2M | 91% | High risk62 | —-0.013 |
| 22E00064ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD, BRGY. MANIWAYA, STA. CRUZ, MARINDUQUE (PHASE II), STA. 0+000-STA. 1+580 (RIGHT SIDE OF PIER); STA. 0+000-STA. 0+540 (LEFT SIDE OF PI | Region IV-B | Region IV-B | On-Going | ₱140.3M | 63% | High risk62 | —-0.021 |
| 22H00037ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - SECONDARY ROADS, JCT (TER) - JAGNA - SIERRA BULLONES RD - K0071 + 030 | Region VII | Region VII | On-Going | ₱244.1M | 66% | High risk62 | Flagged0.001 |
| 23JD0039REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, SINDANGAN-LILOY RD - K1937 + 920 - K1937 + 980, K1938 + 080 - K1938 + 135, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱70.6M | 100% | High risk61 | —-0.038 |
| 22JC0004REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, SINDANGAN - LILOY RD - K1937 + 580 - K1937 + 720, K1937 + 840 - K1937 + 920, ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱67.6M | 100% | High risk61 | —-0.080 |
| 21IL0133FLOOD CONTROL AND DRAINAGE - DRAINAGE / PROTECTION WORKS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG ICHON - SINDANGAN - GUINABONAN - MANINGNING RO | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.067 |
| 21IL0140FLOOD CONTROL AND DRAINAGE / PROTECTION WORKS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.066 |
| 21IL0137FLOOD CONTROL AND DRAINAGE - DRAINAGE / PROTECTION WORKS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.065 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JD0002REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, SINDANGAN-LILOY RD - K1938 + 835 - K1938 + 905, K1939 +000 -0K1939 + 080, K1939 + 150 - K1939 + 285, K1939 + 400 - K1939 + 540, K1939 + 925 - K1940 + 140, ZAMB | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱48.7M | 100% | High risk78 | Flagged0.003 |
| 22HG0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM, WATER SUPPLY SYSTEM, IMPROVEMENT OF ARGAO WATER SUPPLY SYSTEM (LEVEL III), ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱49M | 100% | Medium risk53 | Flagged0.001 |
| 22H00037ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - SECONDARY ROADS, JCT (TER) - JAGNA - SIERRA BULLONES RD - K0071 + 030 | Region VII | Region VII | On-Going | ₱244.1M | 66% | High risk62 | Flagged0.001 |
| 23HH0065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAHUG RIVER, BARANGA | Region VII | Cebu City DEO | On-Going | ₱56.1M | 36% | Medium risk54 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 21HH0168OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, KM18+503.09-KM18+573.09, CEBU | Region VII | Cebu City DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.087 |
| 27 | 22JD0042RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, SALUG DACU BRIDGE (BO0424MN) ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY. ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 100% | Medium risk53 | —-0.008 |
| 28 | 23JC0025WIDENING OF PERMANENT BRIDGE -PONOT DACU BRIDGE (B00446MN) ALONG DIPOLOG-SINDANGAN-LILOY ROAD | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk53 | —-0.037 |
| 29 | 19JD0062RETROFITTING/STRENGTHENING OF DILAWA BRIDGE PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱9.5M | 100% | Medium risk53 | —-0.055 |
| 30 | 22HG0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM, WATER SUPPLY SYSTEM, IMPROVEMENT OF ARGAO WATER SUPPLY SYSTEM (LEVEL III), ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱49M | 100% | Medium risk53 | Flagged0.001 |
| 31 | 21HH0122OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS - CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, K0018+320-K0018+503.09, CEBU C | Region VII | Cebu City DEO | On-Going | ₱55.3M | 100% | Medium risk53 | —-0.029 |
| 32 | 21JG0053CONSTRUCTION OF NEW BRIDGES CULASIAN BR. ALONG ZAMBOANGA DEL SUR COASTAL RD, BRGY. CULASIAN, SAN PABLO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱27.9M | 100% | Medium risk53 | —-0.045 |
| 33 | 22JG0012REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGE PAVE ROADS - TERTIARY ROADS ALONG ZAMBOANGA DEL SUR COASTAL RD - (S01101MN) REBOKON, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱14M | 100% | Medium risk52 | —-0.086 |
| 34 | 23JC0024WIDENING OF PERMANENT BRIDGE-MINANG BRIDGE (B00428MN) ALONG DIPOLOG-SINDANGAN-LILOY ROAD | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱21.9M | 100% | Medium risk52 | —-0.037 |
| 35 | 21JG0059CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL PROJECT IN SIBUGUEY RIVER, BRGY. KAHAYAGAN, BAYOG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱23.6M | 100% | Medium risk52 | —-0.073 |
| 36 | 22JG0018REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT GUINICOLALAY BR. (B01072MN) ALONG ZAMBOANGA DEL SUR COASTAL ROAD, DINAS, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱23.3M | 100% | Medium risk52 | —-0.055 |
| 37 | 20GE0096ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S0025GR) K0058+392 - K0060+392 | Region VI | Guimaras DEO | Completed | ₱86.4M | 100% | Medium risk52 | —-0.075 |
| 38 | 21JG0047RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES DINAS BR. (B00538MN) ALONG JCT. DUMALINAO-MARGOSATUBIG RD, BRGY. BALONGATING, GUIPOS, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱28.5M | 100% | Medium risk52 | —-0.055 |
| 39 | 20KB0046REHAB/RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BUKIDNON-DAVAO CITY ROAD, K1607+900 - K1607+980, PALACAPAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱69.5M | 100% | Medium risk52 | —-0.083 |
| 40 | 22KB0024ROAD WIDENING ALONG MARAMAG-MARADUGAO ROAD, K1558+700-K1560+000, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱59.6M | 100% | Medium risk52 | —-0.083 |
| 41 | 23KH0033CONSTRUCTION OF UPPER CARMEN TO CANITOAN DRAINAGE SYSTEM, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱72.4M | 99% | Medium risk52 | —-0.042 |
| 42 | 22JB0014WIDENING OF BRIDGE - LANGATIAN BRIDGE (B00430MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱6.7M | 100% | Medium risk51 | —-0.044 |
| 43 | 21JG0052CONSTRUCTION OF NEW BRIDGES BALUNO BR. 1 ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG RD, BRGY. DIPLO, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱24.1M | 100% | Medium risk51 | —-0.048 |
| 44 | 19JG0154REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT MACLOB BRIDGE, DAO-AN, SAN MIGUEL ,ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱10.6M | 100% | Medium risk51 | —-0.057 |
| 45 | 20JG0032WIDENING OF PERMANENT BRIDGE - DIPLO BR. (B00551MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD., DIPLO, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱26M | 100% | Medium risk51 | —-0.047 |
| 46 | 21JG0088CONSTRUCTION OF NEW BRIDGES AT KUMALARANG BR.2 ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱20.2M | 100% | Medium risk51 | —-0.055 |
| 47 | 20JG0031WIDENING OF PERMANENT BRIDGE - BOYUGAN BR. (B00553MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD., BOYUGAN, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱27.9M | 100% | Medium risk51 | —-0.046 |
| 48 | 22JG0017REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT DUMALINAO BR. (B00543MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱5.4M | 100% | Medium risk51 | —-0.055 |
| 49 | 20JG0034WIDENING OF PERMANENT BRIDGE - PICANAN BR. (B00552MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD., PICANAN, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱18.5M | 100% | Medium risk51 | —-0.047 |
| 50 | 20JG0030RETROFITTIING/STRENGTHENING OF PERMANENT BRIDGE - TICKWAS BR. (B00536MN) ALONG JCT. DUMALINAO-MARGOSATUBIG RD. TICKWAS, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱5.1M | 100% | Medium risk51 | —-0.056 |