Contractor dossier
135 projects on file, including joint ventures this contractor is part of.
Total projects
135
Total budget
₱6.7B
Average progress
92.9%
Completion rate
83.0%
Average risk score
46.7
Medium risk on average, out of 100
Flagged as unusual
4
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 30 | ₱906.7M | 46.4 | 0 | 100.0% |
| Region IV-B | 24 | ₱1.5B | 46.1 | 1 | 98.0% |
| Region III | 24 | ₱933M | 34.2 | 0 | 98.0% |
| National Capital Region | 20 | ₱1B | 50.3 | 0 | 85.2% |
| Region VI | 10 | ₱712.8M | 54.8 | 0 | 93.5% |
| Region XI | 9 | ₱498M | 49.5 | 1 | 96.9% |
| Region VIII | 7 | ₱466.3M | 64.3 | 1 | 43.7% |
| Region XII | 5 | ₱378.7M | 46.5 | 1 | 100.0% |
| Negros Island Region | 3 | ₱145.9M | 55.5 | 0 | 74.2% |
| Region I | 2 | ₱84.1M | 44.1 | 0 | 100.0% |
| Region II | 1 | ₱27.2M | 43.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 51 | ₱3.3B | 48.4 | 0 | 92.2% |
| Buildings and Facilities | 41 | ₱1.2B | 41.6 | 1 | 90.8% |
| Roads | 39 | ₱1.9B | 45.7 | 1 | 96.3% |
| GAA 2025 SSP | 2 | ₱125.5M | 93.1 | 2 | 95.7% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 93.7 | 0 | 74.0% |
| OTHER | 1 | ₱45.1M | 64.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EH0070CONSTRUCTION OF SABLAYAN FLOOD CONTROL STRUCTURE, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱38.6M | 91% | High risk94 | Flagged0.009 |
| 25IC0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO MALIPURON, BARANGAY GUINCIAMAN, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 74% | High risk94 | —-0.006 |
| 25MB0036CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE INCLUDING FACILITIES, DACERA AVENUE CONNECTING TO SILWAY 8-UPPER LABAY BYPASS ROAD, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱86.8M | 100% | High risk92 | Flagged0.021 |
| 24C00083SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 24CC0461CONSTRUCTION OF MULTI-PURPOSE BUILDING (BIÑANG ELEMENTARY SCHOOL), BIÑANG 1ST, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱45.6M | 53% | High risk75 | —-0.018 |
| 25HJ0140ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING ALONG PRIMARY ROAD-DUMAGUETE NORTH ROAD (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY) K0122+869 - K0124+130, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱57M | 31% | High risk70 | —-0.016 |
| 25GD0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER, BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱142.9M | 41% | High risk68 | —-0.008 |
| 24GD0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL AT ZIBALA RIVER, BARANGAY POBLACION, PILAR, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱94.3M | 96% | High risk65 | —-0.023 |
| 24IM0134CONSTRUCTION OF OFFICE BUILDING, DEPARTMENT OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (DICT) - REGIONAL OFFICE 8, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 0% | High risk65 | Flagged0.054 |
| 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 18CC0259CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANDI-ANGAT ROAD CONNECTING GEN. ALEJO SANTOS HIGHWAY & BALAGTAS-PANDI ROAD & STA. CLARA-PANDI ROAD IN SUPPORT OF FURNITURE AND GARMENTS PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱45.1M | 100% | High risk64 | —-0.036 |
| 24E00174SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 1), BRGY. BONO-BONO SECTION, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 24E00205SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 2), BRGY. MARANGAS-BRGY. BONO-BONO SECTION, STA. 000+000-STA. 001+029.70, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 24OI0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PALIWAS CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.076 |
| 21DM0056CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PIRIS RIVER, BRGY. POBLACION, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.070 |
| 18DQ0139ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY. | Region IV-A | Region IV-A | Completed | ₱92.6M | 100% | High risk63 | —-0.077 |
| 23IM0092COMPLETION OF THE PSYCHIATRIC AND ADMINISTRATIVE BUILDING, EASTERN VISAYAS MEDICAL CENTER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱69.2M | 68% | High risk62 | —-0.024 |
| 24GD0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER AT BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱92.5M | 100% | High risk62 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IM0134CONSTRUCTION OF OFFICE BUILDING, DEPARTMENT OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (DICT) - REGIONAL OFFICE 8, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 0% | High risk65 | Flagged0.054 |
| 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 25MB0036CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE INCLUDING FACILITIES, DACERA AVENUE CONNECTING TO SILWAY 8-UPPER LABAY BYPASS ROAD, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱86.8M | 100% | High risk92 | Flagged0.021 |
| 25EH0070CONSTRUCTION OF SABLAYAN FLOOD CONTROL STRUCTURE, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱38.6M | 91% | High risk94 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25EH0070CONSTRUCTION OF SABLAYAN FLOOD CONTROL STRUCTURE, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱38.6M | 91% | High risk94 | Flagged0.009 |
| 2 | 25IC0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO MALIPURON, BARANGAY GUINCIAMAN, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 74% | High risk94 | —-0.006 |
| 3 | 25MB0036CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE INCLUDING FACILITIES, DACERA AVENUE CONNECTING TO SILWAY 8-UPPER LABAY BYPASS ROAD, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱86.8M | 100% | High risk92 | Flagged0.021 |
| 4 | 24C00083SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 5 | 24CC0461CONSTRUCTION OF MULTI-PURPOSE BUILDING (BIÑANG ELEMENTARY SCHOOL), BIÑANG 1ST, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱45.6M | 53% | High risk75 | —-0.018 |
| 6 | 25HJ0140ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING ALONG PRIMARY ROAD-DUMAGUETE NORTH ROAD (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY) K0122+869 - K0124+130, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱57M | 31% | High risk70 | —-0.016 |
| 7 | 25GD0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER, BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱142.9M | 41% | High risk68 | —-0.008 |
| 8 | 24GD0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL AT ZIBALA RIVER, BARANGAY POBLACION, PILAR, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱94.3M | 96% | High risk65 | —-0.023 |
| 9 | 24IM0134CONSTRUCTION OF OFFICE BUILDING, DEPARTMENT OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (DICT) - REGIONAL OFFICE 8, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 0% | High risk65 | Flagged0.054 |
| 10 | 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 11 | 18CC0259CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANDI-ANGAT ROAD CONNECTING GEN. ALEJO SANTOS HIGHWAY & BALAGTAS-PANDI ROAD & STA. CLARA-PANDI ROAD IN SUPPORT OF FURNITURE AND GARMENTS PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱45.1M | 100% | High risk64 | —-0.036 |
| 12 | 24E00174SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 1), BRGY. BONO-BONO SECTION, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 13 | 24E00205SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 2), BRGY. MARANGAS-BRGY. BONO-BONO SECTION, STA. 000+000-STA. 001+029.70, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 14 | 24OI0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PALIWAS CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.076 |
| 15 | 21DM0056CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PIRIS RIVER, BRGY. POBLACION, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.070 |
| 16 | 18DQ0139ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY. | Region IV-A | Region IV-A | Completed | ₱92.6M | 100% | High risk63 | —-0.077 |
| 17 | 23IM0092COMPLETION OF THE PSYCHIATRIC AND ADMINISTRATIVE BUILDING, EASTERN VISAYAS MEDICAL CENTER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱69.2M | 68% | High risk62 | —-0.024 |
| 18 | 24GD0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER AT BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱92.5M | 100% | High risk62 | —-0.026 |
| 19 | 24IM0120CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR THE INTEGRATED BAR OF THE PHILIPPINES, LEYTE CHAPTER, (PHASE 2), TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱49M | 3% | Medium risk59 | —-0.018 |
| 20 | 25IE0093CONSTRUCTION OF DPWH LEYTE 3RD DISTRICT ENGINEERING OFFICE BUILDING, BARANGAY SUBA, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱49M | 0% | Medium risk59 | —-0.026 |
| 21 | 23EH0078CONSTRUCTION OF PAG-ALAD FLOOD MITIGATING STRUCTURE (PHASE 2) ALONG PARPAGOHA RIVER CONTROL, SAN ANDRES, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱94.1M | 100% | Medium risk58 | —-0.064 |
| 22 | 23IG0070CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF PUBLIC MARKET, BRGY. NALIBUNAN, ABUYOG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱48.3M | 100% | Medium risk58 | —-0.091 |
| 23 | 23C00227FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 24 | 18OI0186CONST. OF TWO (2) UNITS FOUR (4) STOREY, SIXTEEN (16) CLASSROOM S/B AT PEDRO E. DIAZ, H/S, MUNTINLUP | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱78.1M | 100% | Medium risk54 | —-0.027 |
| 25 | 22DM0083NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CATANAUAN DIVERSION ROAD, (PACKAGE 2), QUEZON, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱62.7M | 100% | Medium risk54 | —-0.098 |