Contractor dossier
135 projects on file, including joint ventures this contractor is part of.
Total projects
135
Total budget
₱6.7B
Average progress
92.9%
Completion rate
83.0%
Average risk score
46.7
Medium risk on average, out of 100
Flagged as unusual
4
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 30 | ₱906.7M | 46.4 | 0 | 100.0% |
| Region IV-B | 24 | ₱1.5B | 46.1 | 1 | 98.0% |
| Region III | 24 | ₱933M | 34.2 | 0 | 98.0% |
| National Capital Region | 20 | ₱1B | 50.3 | 0 | 85.2% |
| Region VI | 10 | ₱712.8M | 54.8 | 0 | 93.5% |
| Region XI | 9 | ₱498M | 49.5 | 1 | 96.9% |
| Region VIII | 7 | ₱466.3M | 64.3 | 1 | 43.7% |
| Region XII | 5 | ₱378.7M | 46.5 | 1 | 100.0% |
| Negros Island Region | 3 | ₱145.9M | 55.5 | 0 | 74.2% |
| Region I | 2 | ₱84.1M | 44.1 | 0 | 100.0% |
| Region II | 1 | ₱27.2M | 43.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 51 | ₱3.3B | 48.4 | 0 | 92.2% |
| Buildings and Facilities | 41 | ₱1.2B | 41.6 | 1 | 90.8% |
| Roads | 39 | ₱1.9B | 45.7 | 1 | 96.3% |
| GAA 2025 SSP | 2 | ₱125.5M | 93.1 | 2 | 95.7% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 93.7 | 0 | 74.0% |
| OTHER | 1 | ₱45.1M | 64.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EH0070CONSTRUCTION OF SABLAYAN FLOOD CONTROL STRUCTURE, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱38.6M | 91% | High risk94 | Flagged0.009 |
| 25IC0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO MALIPURON, BARANGAY GUINCIAMAN, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 74% | High risk94 | —-0.006 |
| 25MB0036CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE INCLUDING FACILITIES, DACERA AVENUE CONNECTING TO SILWAY 8-UPPER LABAY BYPASS ROAD, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱86.8M | 100% | High risk92 | Flagged0.021 |
| 24C00083SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 24CC0461CONSTRUCTION OF MULTI-PURPOSE BUILDING (BIÑANG ELEMENTARY SCHOOL), BIÑANG 1ST, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱45.6M | 53% | High risk75 | —-0.018 |
| 25HJ0140ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING ALONG PRIMARY ROAD-DUMAGUETE NORTH ROAD (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY) K0122+869 - K0124+130, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱57M | 31% | High risk70 | —-0.016 |
| 25GD0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER, BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱142.9M | 41% | High risk68 | —-0.008 |
| 24GD0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL AT ZIBALA RIVER, BARANGAY POBLACION, PILAR, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱94.3M | 96% | High risk65 | —-0.023 |
| 24IM0134CONSTRUCTION OF OFFICE BUILDING, DEPARTMENT OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (DICT) - REGIONAL OFFICE 8, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 0% | High risk65 | Flagged0.054 |
| 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 18CC0259CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANDI-ANGAT ROAD CONNECTING GEN. ALEJO SANTOS HIGHWAY & BALAGTAS-PANDI ROAD & STA. CLARA-PANDI ROAD IN SUPPORT OF FURNITURE AND GARMENTS PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱45.1M | 100% | High risk64 | —-0.036 |
| 24E00174SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 1), BRGY. BONO-BONO SECTION, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 24E00205SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 2), BRGY. MARANGAS-BRGY. BONO-BONO SECTION, STA. 000+000-STA. 001+029.70, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 24OI0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PALIWAS CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.076 |
| 21DM0056CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PIRIS RIVER, BRGY. POBLACION, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.070 |
| 18DQ0139ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY. | Region IV-A | Region IV-A | Completed | ₱92.6M | 100% | High risk63 | —-0.077 |
| 23IM0092COMPLETION OF THE PSYCHIATRIC AND ADMINISTRATIVE BUILDING, EASTERN VISAYAS MEDICAL CENTER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱69.2M | 68% | High risk62 | —-0.024 |
| 24GD0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER AT BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱92.5M | 100% | High risk62 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IM0134CONSTRUCTION OF OFFICE BUILDING, DEPARTMENT OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (DICT) - REGIONAL OFFICE 8, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 0% | High risk65 | Flagged0.054 |
| 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 25MB0036CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE INCLUDING FACILITIES, DACERA AVENUE CONNECTING TO SILWAY 8-UPPER LABAY BYPASS ROAD, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱86.8M | 100% | High risk92 | Flagged0.021 |
| 25EH0070CONSTRUCTION OF SABLAYAN FLOOD CONTROL STRUCTURE, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱38.6M | 91% | High risk94 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 18DM0117CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT TAGBACAN NHS (FORMERLY TAGBACAN ILAYA IS) | Region IV-A | Quezon 3rd DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.059 |
| 102 | 18DM0121CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT SAN ISIDRO NATIONAL HIGH SCHOOL | Region IV-A | Quezon 3rd DEO | Completed | ₱12.1M | 100% | Medium risk40 | —-0.059 |
| 103 | 18DM0096CONSTRUCTION OF TWO(2)-STOREY FOUR(4)-CLASSROOM SCHOOL BUILDING AT DAHICAN ES CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱12M | 100% | Medium risk40 | —-0.059 |
| 104 | 18DM0095CONSTRUCTION OF TWO(2)-STOREY FOUR(4)-CLASSROOM SCHOOL BUILDING AT CATANAUAN CS CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱12M | 100% | Medium risk40 | —-0.059 |
| 105 | 21EA0083CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BOAC RIVER, BARANGAY SANTOL, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.074 |
| 106 | 24EA0011ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0054+890 - K0056+640 | Region IV-B | Marinduque DEO | Completed | ₱35.6M | 100% | Medium risk38 | —-0.091 |
| 107 | 23CC0352CONSTRUCTION OF MULTI-PURPOSE BUILDING AT TAMBUBONG ELEMENTARY SCHOOL, TAMBUBONG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱39.6M | 100% | Medium risk38 | —-0.099 |
| 108 | 25EA0040SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BOAC ACCESS ROAD, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱37.9M | 61% | Medium risk38 | —-0.058 |
| 109 | 22EH0112REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0009+128 - K0009+157.70, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱39.2M | 100% | Medium risk37 | —-0.092 |
| 110 | 22EH0131CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 11+466.00 - STA.11+510.00, SAN AGUSTIN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱35.3M | 100% | Medium risk37 | —-0.091 |
| 111 | 20EA0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAWI FLOOD CONTROL, BOAC,MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱45.2M | 100% | Medium risk37 | —-0.074 |
| 112 | 18EF0211IMPLEMENTATION AND MONITORING OF PAMANA PROJECTS-SITIO CABCABEN, BRGY. SALOGON, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱42.1M | 100% | Medium risk37 | —-0.006 |
| 113 | 18EF0210IMPLEMENTATION AND MONITORING OF PAMANA PROJECTS SITIO TABOK, BRGY. SALOGON FROM NATIONAL HIGHWAY BRGY. SALOGON, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱39.5M | 100% | Medium risk37 | —-0.006 |
| 114 | 21CD0093REHABILITATION / IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER, MASIPILIT SECTION PHASE II, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱65.3M | 100% | Medium risk37 | —-0.090 |
| 115 | 22CD0102CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱47.5M | 100% | Medium risk35 | —-0.092 |
| 116 | 23EB0064CONSTRUCTION OF DPWH MINDORO OCCIDENTAL DISTRICT ENGINEERING SUB-OFFICE, BRGY. ARAW AT BITUIN AND BRGY. MALIIG, LUBANG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱9M | 100% | Medium risk35 | —-0.080 |
| 117 | 19CC0145ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - GENERAL ALEJO SANTOS HIGHWAY K0047+300 - K0048+261, K0048+261 - K0048+300, K0048+300 - K0050+461.75 PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱45M | 100% | Medium risk34 | —-0.102 |
| 118 | 20CC0084CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAGTAS RIVER, BRGY. WAWA, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱47.5M | 100% | Medium risk34 | —-0.092 |
| 119 | 19CC0121ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - PULILAN-CALUMPIT ROAD K0050+028 - K0051+381 CALUMPIT & PULILAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱30M | 100% | Medium risk33 | —-0.106 |
| 120 | 23CC0061CONSTRUCTION OF SLOPE PROTECTION AT HINUKAY, STA. 00+150 TO STA. 00+350, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.093 |
| 121 | 18CI0077FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION ALONG QUITANGIL CREEK, BARANGAY SAN ILDEFONSO, SITIO BALIBAGO-SITIO BALAS, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.089 |
| 122 | 20CD0002CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL SIBUL ROAD AT SIBUL RIVER, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱31M | 100% | Medium risk32 | —-0.094 |
| 123 | 20CD0003CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL SIBUL ROAD AT TARTARO RIVER, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱16.9M | 100% | Medium risk31 | —-0.094 |
| 124 | 22CD0047CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46M | 100% | Medium risk31 | —-0.093 |
| 125 | 18CI0099COMPLETE CONSTRUCTION OF 4 STOREY 12 CLASSROOM SCHOOL BUILDING, PAMPANG ELEMENTARY SCHOOL, ANGELES CITY | Region III | Pampanga 3rd DEO | Completed | ₱31.4M | 100% | Low risk29 | —-0.043 |