Contractor dossier
204 projects on file, including joint ventures this contractor is part of.
Total projects
204
Total budget
₱5.5B
Average progress
95.4%
Completion rate
73.0%
Average risk score
45.8
Medium risk on average, out of 100
Flagged as unusual
9
4.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 156 | ₱4.4B | 45.5 | 8 | 98.0% |
| Negros Island Region | 48 | ₱1.1B | 46.8 | 1 | 87.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 75 | ₱2.6B | 45.8 | 4 | 93.4% |
| Roads | 71 | ₱1.7B | 44.8 | 0 | 96.6% |
| Buildings and Facilities | 33 | ₱572M | 37.3 | 1 | 94.6% |
| OTHER | 18 | ₱390.3M | 61.5 | 2 | 99.5% |
| Water Provision and Storage | 4 | ₱30.6M | 39.6 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱47.5M | 95.4 | 1 | 94.0% |
| GAA 2025 OO-2 | 1 | ₱144.7M | 92.9 | 1 | 90.8% |
| Bridges | 1 | ₱25M | 47.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY ALMARIA PROP | Region VII | Bohol 3rd DEO | On-Going | ₱47.5M | 94% | High risk95 | Flagged0.013 |
| 25HB0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCTURE ALONG GABAYAN RIVER, CANDIJAY, BOHOL, STA. 0+600.00 - STA. 1+068.00, S | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 91% | High risk93 | Flagged0.002 |
| 24HO0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS-PUROK NANGKA (PACKAGE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS - PUROK NANGKA, BARAN | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 24HB0035ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE NEAR MAKAPIKO BRIDGE, BATUAN, BOHO | Region VII | Bohol 3rd DEO | On-Going | ₱77.1M | 91% | High risk73 | Flagged0.014 |
| 19HB0032ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR ROAD (S00077BH), K0153+-609 - K0153+000, K0178+122 - K0178+399, K0168+659 - K0189+279, K0178+881 - K0179+737 | Region VII | Bohol 3rd DEO | Completed | ₱86.6M | 100% | High risk71 | —-0.024 |
| 24HB0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, TABAJAN, GUINDULMAN, BOHOL STA.0+000.00-STA.0+324.00 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 90% | High risk71 | Flagged0.031 |
| 24HM0088001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, SIQUIJOR-SAN ANTONIO-CAMPALANAS ROAD, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 70% | High risk70 | —-0.017 |
| 18HB0155CONCRETING OF BRGY. TANGCASAN SUR-BRGY. TANGCASAN NORTE FMR, BRGY. TANGCASAN SUR, LOAY, BOHOL STA. 0+000.00-STA. 0+414.28 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk69 | Flagged0.013 |
| 22HM0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), GABAYAN-TALAYONG-LOWER CABANGCALAN-CAMPALANAS ROAD LEADING TO MARINE PROTECTIVE | Negros Island Region | Siquijor DEO | On-Going | ₱7.4M | 92% | High risk65 | —-0.003 |
| 24HM0023002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DATAG RIVER, HELEN, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 100% | High risk64 | —-0.022 |
| 23HO0067ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO LOWER TALAYONG, BRGY. TUPAS - SI | Region VII | Cebu 7th DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.066 |
| 24HB0113ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMURAN - SARANGANI RIVER CONTROL, PHASE II, CANDIJAY, | Region VII | Bohol 3rd DEO | Completed | ₱144.6M | 100% | High risk63 | —-0.055 |
| 19HB0024NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS, JCT. (LIR) DAT-AN, CARMEN-SIERRA BULLONES-PILAR-ALICIA ROAD, K083+000 - K083+316, K083+346 - K084+109, K084+134 - K084+135, K084+160 - K084+386, K084+396.64 - K085+040, K089+065 - K089+428 | Region VII | Bohol 3rd DEO | Completed | ₱24.4M | 100% | High risk62 | —-0.030 |
| 20HB0160LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS CONSTRUCTION/REHABILITATION OF JCT (TER) LA UNION (CANDIJAY) - CABULAO - LUNGSODAAN - POOK ROAD (MABINI), CANDIJAY, BOHOL STA. 0+389.00 - STA. 4+213.85 | Region VII | Bohol 3rd DEO | Completed | ₱19.8M | 100% | High risk62 | —-0.030 |
| 20HB0051ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT -SECONDARY ROADS, LOAY INTERIOR ROAD - KO176 + 329 - KO176 + 719, KO177 + 200, KO177 + 557, KO177 + 582 - KO178 + 122, KO178 | Region VII | Bohol 3rd DEO | Completed | ₱20M | 100% | High risk62 | —-0.030 |
| 17HB0020NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT-INCLUDING DRAINAGE-SECONDARY ROADS JCT.(TER)-JAGNA-SIERRA BULLONES ROAD, BOHOL PROVINCE | Region VII | Bohol 3rd DEO | Completed | ₱18.4M | 100% | High risk62 | —-0.030 |
| 18HB0088CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (TER) DIMIAO-OAC-BILAR JCT. (LIR) ROAD IN SUPPORT OF THE AGRI BUSINESS INDUSTRY , BILAR, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱16.2M | 100% | High risk62 | —-0.030 |
| 19HB0124ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) KO197+804-KO197+982 KO198+021-KO198+251 KO218+554-KO218+747 | Region VII | Bohol 3rd DEO | Completed | ₱20.8M | 100% | High risk62 | —-0.029 |
| 17HB0025NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROADS - JCT. DAT-AN CARMEN-SIERRA BULLONES-PILAR- ALICIA ROAD, SECTION 1: K0072+-498 - K0072+046 (K0071+600 - K0072+000); SECTION 2: K0091+262 - K0091+412 (K0091+262 - K0091+7 | Region VII | Bohol 3rd DEO | Completed | ₱14.3M | 100% | High risk61 | —-0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HO0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS-PUROK NANGKA (PACKAGE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS - PUROK NANGKA, BARAN | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 24HB0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, TABAJAN, GUINDULMAN, BOHOL STA.0+000.00-STA.0+324.00 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 90% | High risk71 | Flagged0.031 |
| 24H00159REPAIR/REHABILITATION OF BISU-CANDIJAY CAMPUS - BOHOL ISLAND STATE UNIVERSITY | Region VII | Region VII | On-Going | ₱49.7M | 67% | Medium risk48 | Flagged0.014 |
| 24HB0035ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE NEAR MAKAPIKO BRIDGE, BATUAN, BOHO | Region VII | Bohol 3rd DEO | On-Going | ₱77.1M | 91% | High risk73 | Flagged0.014 |
| 18HB0155CONCRETING OF BRGY. TANGCASAN SUR-BRGY. TANGCASAN NORTE FMR, BRGY. TANGCASAN SUR, LOAY, BOHOL STA. 0+000.00-STA. 0+414.28 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk69 | Flagged0.013 |
| 25HB0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY ALMARIA PROP | Region VII | Bohol 3rd DEO | On-Going | ₱47.5M | 94% | High risk95 | Flagged0.013 |
| 25HB0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCTURE ALONG GABAYAN RIVER, CANDIJAY, BOHOL, STA. 0+600.00 - STA. 1+068.00, S | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 91% | High risk93 | Flagged0.002 |
| 24HM0052002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CANTAROC-A, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱49M | 0% | Medium risk51 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 24HB0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD / S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, SITIO BOON | Region VII | Bohol 3rd DEO | Completed | ₱28.9M | 100% | Medium risk45 | —-0.093 |
| 102 | 24HB0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUIL | Region VII | Bohol 3rd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.093 |
| 103 | 24HB0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, DUERO, BOHOL STA. 0+300.00 - STA. 1+368.80; | Region VII | Bohol 3rd DEO | Completed | ₱34.6M | 100% | Medium risk44 | —-0.093 |
| 104 | 24HB0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BRGY. BACONG LEADING TO CABAGNAO CAVE, ANDA, BOHOL STA.0+000.00 - STA.0+985.30; STA | Region VII | Bohol 3rd DEO | Completed | ₱31.8M | 100% | Medium risk44 | —-0.092 |
| 105 | 23HB0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF ROADS AT BARANGAY KATIPUNAN - BUENASUERTE - TANOD - L | Region VII | Bohol 3rd DEO | Completed | ₱34.5M | 100% | Medium risk44 | —-0.092 |
| 106 | 18HB0142ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - TAGBILARAN EAST ROAD (TAGB. - JAGNA), KO203+840.00-KO204+040.00 | Region VII | Bohol 3rd DEO | Completed | ₱39.1M | 100% | Medium risk44 | —-0.092 |
| 107 | 19HB0127CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, SIERRA BULLONES, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.6M | 100% | Medium risk44 | —-0.058 |
| 108 | 18HB0144COMPLETION OF BATUAN MUNICIPAL PUBLIC MARKET, BATUAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱19.1M | 100% | Medium risk44 | —-0.092 |
| 109 | 20HB0043CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (LIR) QUINOGUITAN - SEVILLA - HANOPOL - TAGUSTUSAN (BALILIHAN) ROAD IN SUPPORT OF THE FURNITURE AND GARMENTS AND TOURISM INDUSTRIES, SEVILLA, BOHOL STA. 1 + 2 | Region VII | Bohol 3rd DEO | Completed | ₱14.3M | 100% | Medium risk44 | —-0.096 |
| 110 | 18HB0133ASSET PRESERVATION-REHABILITATION/RECONSTRUCTIONOF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) KO192+340.00 - KO192+440.00, JAGNA, B | Region VII | Bohol 3rd DEO | Completed | ₱23M | 100% | Medium risk44 | —-0.093 |
| 111 | 18HB0030NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - OFF-CARRIAGEWAY IMPROVEMENT:SHOULDER PAVING/CONSTRUCTION - JCT. DAT-AN - CARMEN-SIERRA BULLONES-PILAR-ALICIA ROAD, ALICIA, BOHOL, KO086+894-KO088+794 | Region VII | Bohol 3rd DEO | Completed | ₱23.3M | 100% | Medium risk44 | —-0.094 |
| 112 | 18HB0059CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (TER) ITUM-DUAY-PAYAO-ESKAYA ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, DUERO, BOHOL KO 2+040.00-KO 2+855.00 | Region VII | Bohol 3rd DEO | Completed | ₱18.6M | 100% | Medium risk44 | —-0.094 |
| 113 | 18HB0058CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-JCT. (TER) LUNGSODAAN-TAMBONGAN-CADAPDAPAN ROAD(CANDIJAY) LEADING TO CAN-UMANTAD FALLS, BRGY. LUNGSADAAN, CANDIJAY, BOHOL KO 0+000.00-KO 1+600.00 | Region VII | Bohol 3rd DEO | Completed | ₱18.6M | 100% | Medium risk44 | —-0.094 |
| 114 | 21HB0084LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD AT CABATANG, ALICIA, BOHOL, STA. 0+000 - STA. 0+150; STA. 0+190 - STA. 0+270 | Region VII | Bohol 3rd DEO | Completed | ₱19.8M | 100% | Medium risk44 | —-0.095 |
| 115 | 21HB0146LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ROADS AT CANKOKA, ABIHILAN, CANDIJAY, BOHOL, STA. 1+407.00 - STA, 1+879.50; STA. 2+018.00 - STA. 2+740.00 | Region VII | Bohol 3rd DEO | Completed | ₱19.8M | 100% | Medium risk44 | —-0.094 |
| 116 | 18HB0022PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING JCT. DAT-AN CARMEN-SIERRA BULLONES-PILAR-ALICIA ROAD, K066+035 - K0066+075, K0066+260 - K0066+285, K0066+440 - K0066+450, K0066+580 - K0066+605,K0066+700 - K0066+720, K0066+730 - K0066+750, K0066+880 - K | Region VII | Bohol 3rd DEO | Completed | ₱24.3M | 100% | Medium risk44 | —-0.095 |
| 117 | 18HB0019ASSET PRESERVATION-PREVENTIVEMAINTENANCE-TERTIARY ROADS P00200091VS - JCT. DAT-AN CARMEN-SIERRA BULLONES-PILAR-ALICIA ROAD (S00108BH) K0076+108 - K0076+500K, K0076+798 - K0076+928, K0077+000 - K0077+167, K0077+300-K0077+440, CARMEN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱16.4M | 100% | Medium risk44 | —-0.095 |
| 118 | 25H00037CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF ROAD, BARANGAY POBLACION TO BARANGAY CAMBANE, CANDIJAY, BOHOL | Region VII | Region VII | On-Going | ₱9.6M | 88% | Medium risk43 | —-0.056 |
| 119 | 20HB0009CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES JCT. (DIMIAO - BILAR) OAC - OMJON ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, DIMIAO, BOHOL STA. 1+282.00 - STA. 1+778.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | Medium risk43 | —-0.095 |
| 120 | 20HB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. (TER) DIMIAO - OAC -BILAR - JCT. (LIR) ROAD ACCESS FROM BEACHES LEADING TO MAN-MADE FOREST, TARSIER, LOGARI | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | Medium risk43 | —-0.095 |
| 121 | 24HB0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAITENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD CONTROL AT ALEJAWAN RIVER (BOTH SIDES), DUERO AND JAGNA, | Region VII | Bohol 3rd DEO | Completed | ₱39.2M | 100% | Medium risk43 | —-0.075 |
| 122 | 19HB0055ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-JCT. (TER) JAGNA-SIERRA BULLONES ROAD KO065+800-KO066+400, | Region VII | Bohol 3rd DEO | Completed | ₱14M | 100% | Medium risk43 | —-0.094 |
| 123 | 19HB0094CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (TER) DIMIAO-OAC-BILAR JCT. (LIR) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRIES, BILAR, BOHOL,STA. 14+192 - 14+692 | Region VII | Bohol 3rd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.095 |
| 124 | 22HM0075CONCRETING OF SITIO TAG-IBO TO BUAK BATO, BRGY. SAN ANTONIO FMR, BRGY. SAN ANTONIO, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱11.9M | 100% | Medium risk43 | —-0.040 |
| 125 | 18HB0047CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALEJAWAN SHORE P[ROTECTION, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱13.2M | 100% | Medium risk43 | —-0.075 |