Opening the dossier…
Opening the dossier…
Contractor dossier
204 projects on file, including joint ventures this contractor is part of.
Total projects
204
Total budget
₱5.5B
Average progress
95.4%
Completion rate
73.0%
Average risk score
45.8
Medium risk on average, out of 100
Flagged as unusual
9
4.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 156 | ₱4.4B | 45.5 | 8 | 98.0% |
| Negros Island Region | 48 | ₱1.1B | 46.8 | 1 | 87.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 75 | ₱2.6B | 45.8 | 4 | 93.4% |
| Roads | 71 | ₱1.7B | 44.8 | 0 | 96.6% |
| Buildings and Facilities | 33 | ₱572M | 37.3 | 1 | 94.6% |
| OTHER | 18 | ₱390.3M | 61.5 | 2 | 99.5% |
| Water Provision and Storage | 4 | ₱30.6M | 39.6 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱47.5M | 95.4 | 1 | 94.0% |
| GAA 2025 OO-2 | 1 | ₱144.7M | 92.9 | 1 | 90.8% |
| Bridges | 1 | ₱25M | 47.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY ALMARIA PROP | Region VII | Bohol 3rd DEO | On-Going | ₱47.5M | 94% | High risk95 | Flagged0.013 |
| 25HB0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCTURE ALONG GABAYAN RIVER, CANDIJAY, BOHOL, STA. 0+600.00 - STA. 1+068.00, S | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 91% | High risk93 | Flagged0.002 |
| 24HO0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS-PUROK NANGKA (PACKAGE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS - PUROK NANGKA, BARAN | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 24HB0035ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE NEAR MAKAPIKO BRIDGE, BATUAN, BOHO | Region VII | Bohol 3rd DEO | On-Going | ₱77.1M | 91% | High risk73 | Flagged0.014 |
| 19HB0032ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR ROAD (S00077BH), K0153+-609 - K0153+000, K0178+122 - K0178+399, K0168+659 - K0189+279, K0178+881 - K0179+737 | Region VII | Bohol 3rd DEO | Completed | ₱86.6M | 100% | High risk71 | —-0.024 |
| 24HB0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, TABAJAN, GUINDULMAN, BOHOL STA.0+000.00-STA.0+324.00 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 90% | High risk71 | Flagged0.031 |
| 24HM0088001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, SIQUIJOR-SAN ANTONIO-CAMPALANAS ROAD, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 70% | High risk70 | —-0.017 |
| 18HB0155CONCRETING OF BRGY. TANGCASAN SUR-BRGY. TANGCASAN NORTE FMR, BRGY. TANGCASAN SUR, LOAY, BOHOL STA. 0+000.00-STA. 0+414.28 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk69 | Flagged0.013 |
| 22HM0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), GABAYAN-TALAYONG-LOWER CABANGCALAN-CAMPALANAS ROAD LEADING TO MARINE PROTECTIVE | Negros Island Region | Siquijor DEO | On-Going | ₱7.4M | 92% | High risk65 | —-0.003 |
| 24HM0023002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DATAG RIVER, HELEN, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 100% | High risk64 | —-0.022 |
| 23HO0067ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO LOWER TALAYONG, BRGY. TUPAS - SI | Region VII | Cebu 7th DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.066 |
| 24HB0113ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMURAN - SARANGANI RIVER CONTROL, PHASE II, CANDIJAY, | Region VII | Bohol 3rd DEO | Completed | ₱144.6M | 100% | High risk63 | —-0.055 |
| 19HB0024NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS, JCT. (LIR) DAT-AN, CARMEN-SIERRA BULLONES-PILAR-ALICIA ROAD, K083+000 - K083+316, K083+346 - K084+109, K084+134 - K084+135, K084+160 - K084+386, K084+396.64 - K085+040, K089+065 - K089+428 | Region VII | Bohol 3rd DEO | Completed | ₱24.4M | 100% | High risk62 | —-0.030 |
| 20HB0160LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS CONSTRUCTION/REHABILITATION OF JCT (TER) LA UNION (CANDIJAY) - CABULAO - LUNGSODAAN - POOK ROAD (MABINI), CANDIJAY, BOHOL STA. 0+389.00 - STA. 4+213.85 | Region VII | Bohol 3rd DEO | Completed | ₱19.8M | 100% | High risk62 | —-0.030 |
| 20HB0051ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT -SECONDARY ROADS, LOAY INTERIOR ROAD - KO176 + 329 - KO176 + 719, KO177 + 200, KO177 + 557, KO177 + 582 - KO178 + 122, KO178 | Region VII | Bohol 3rd DEO | Completed | ₱20M | 100% | High risk62 | —-0.030 |
| 17HB0020NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT-INCLUDING DRAINAGE-SECONDARY ROADS JCT.(TER)-JAGNA-SIERRA BULLONES ROAD, BOHOL PROVINCE | Region VII | Bohol 3rd DEO | Completed | ₱18.4M | 100% | High risk62 | —-0.030 |
| 18HB0088CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (TER) DIMIAO-OAC-BILAR JCT. (LIR) ROAD IN SUPPORT OF THE AGRI BUSINESS INDUSTRY , BILAR, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱16.2M | 100% | High risk62 | —-0.030 |
| 19HB0124ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) KO197+804-KO197+982 KO198+021-KO198+251 KO218+554-KO218+747 | Region VII | Bohol 3rd DEO | Completed | ₱20.8M | 100% | High risk62 | —-0.029 |
| 17HB0025NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROADS - JCT. DAT-AN CARMEN-SIERRA BULLONES-PILAR- ALICIA ROAD, SECTION 1: K0072+-498 - K0072+046 (K0071+600 - K0072+000); SECTION 2: K0091+262 - K0091+412 (K0091+262 - K0091+7 | Region VII | Bohol 3rd DEO | Completed | ₱14.3M | 100% | High risk61 | —-0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HO0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS-PUROK NANGKA (PACKAGE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK MAIS - PUROK NANGKA, BARAN | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 24HB0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, TABAJAN, GUINDULMAN, BOHOL STA.0+000.00-STA.0+324.00 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 90% | High risk71 | Flagged0.031 |
| 24H00159REPAIR/REHABILITATION OF BISU-CANDIJAY CAMPUS - BOHOL ISLAND STATE UNIVERSITY | Region VII | Region VII | On-Going | ₱49.7M | 67% | Medium risk48 | Flagged0.014 |
| 24HB0035ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE NEAR MAKAPIKO BRIDGE, BATUAN, BOHO | Region VII | Bohol 3rd DEO | On-Going | ₱77.1M | 91% | High risk73 | Flagged0.014 |
| 18HB0155CONCRETING OF BRGY. TANGCASAN SUR-BRGY. TANGCASAN NORTE FMR, BRGY. TANGCASAN SUR, LOAY, BOHOL STA. 0+000.00-STA. 0+414.28 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk69 | Flagged0.013 |
| 25HB0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY ALMARIA PROP | Region VII | Bohol 3rd DEO | On-Going | ₱47.5M | 94% | High risk95 | Flagged0.013 |
| 25HB0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCTURE ALONG GABAYAN RIVER, CANDIJAY, BOHOL, STA. 0+600.00 - STA. 1+068.00, S | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 91% | High risk93 | Flagged0.002 |
| 24HM0052002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CANTAROC-A, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱49M | 0% | Medium risk51 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18HB0116CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TUBOD, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk35 | —-0.093 |
| 177 | 23HM0041001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0046+000 - K0046+063 | Negros Island Region | Siquijor DEO | On-Going | ₱2.5M | 100% | Medium risk35 | —-0.046 |
| 178 | 23HM0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BASAC-PISONG B ROAD LEADING TO CANGBANGAG FALLS, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱2.9M | 88% | Medium risk34 | —-0.042 |
| 179 | 23HM0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), PISONG A-PISONG B ROAD LEADING TO CANGBANGAG FALLS, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱2.9M | 98% | Medium risk34 | —-0.044 |
| 180 | 23HM0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), SAN-ANTONIO-CANTABON-BANDILAAN ROAD LEADING TO VARIOUS CANTABON CAVE, HEALING SITES A | Negros Island Region | Siquijor DEO | On-Going | ₱2.9M | 99% | Medium risk34 | —-0.044 |
| 181 | 23HM0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), NONOC-CANG-ALLAS-CALUNASAN ROAD LEADING TO ST. FRANCIS OF ASSISI CHURCH & BELFRYM CAN | Negros Island Region | Siquijor DEO | On-Going | ₱3.4M | 84% | Medium risk34 | —-0.041 |
| 182 | 23HM0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), GABAYAN-TALAYONG-LOWER CABANGCALAN-CAMPALANAS ROAD LEADING TO MARINE PROTECTIVE AREAS | Negros Island Region | Siquijor DEO | On-Going | ₱2.9M | 99% | Medium risk34 | —-0.044 |
| 183 | 23HM0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CANLAMBO-BALOLONG-BINTANGAN ROAD, BRGY. CANLAMBO, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱2.9M | 88% | Medium risk33 | —-0.042 |
| 184 | 23HM0042002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE/SHORE PROTECTION AT HELEN, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱2.9M | 52% | Medium risk33 | —-0.005 |
| 185 | 23HM0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE FACILITIES, BARANGAY CANG-ALWANG, SIQUJIOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱2M | 100% | Medium risk32 | —-0.038 |
| 186 | 17HB0032CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - ACCESS ROAD LEADING TO LOAY PORT | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk28 | —-0.062 |
| 187 | 24HN0194CLUSTER II-RAINWATER COLLECTORS IN PUBLIC FACILITIES-A.)CABANCALAN HS, MANDAUE CITY C.)MANDAUE CITY CENTRAL SCHOOL, MANDAUE CITY D.)CANSAGA E/S, CONSOLACION E.)SACSAC E/S, CONSOLACION F.)BUYONG E/S SCHOOL, LAPU-LAPU CITY G.)MACTAN NAT'L H/S, LAPU-LAPU | Region VII | Cebu 6th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.063 |
| 188 | 24HM0054CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING IN BARANGAY BOLOS, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱1.9M | 22% | Low risk22 | —-0.017 |
| 189 | 18HB0165CONSTRUCTION/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF SEAWALL, BARANGAY CATUGASAN, LILA, BOHOL STA. 0+124.00 - STA. 0+248.00 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk21 | —-0.076 |
| 190 | 18HB0104CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF SEAWALL, BARANGAY CATUGASAN, LILA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk21 | —-0.076 |
| 191 | 18HB0102CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF SEAWALL, BARANGAY TAONGON CABATUAN, DIMIAO, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk20 | —-0.075 |
| 192 | 18HB0100CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MADUA SUR RIVER CONTROL, DUERO, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk20 | —-0.074 |
| 193 | 18HB0099CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MADUA NORTE RIVER CONTROL, DUERO, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk20 | —-0.074 |
| 194 | 19HB0019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF MANAO RIVER CONTROL, POBLACION, GARCIA HERNANDEZ, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk20 | —-0.074 |
| 195 | 18HB0045CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEMENT OF SEAWALL, BARANGAY LOOC, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.4M | 100% | Low risk20 | —-0.074 |
| 196 | 18HB0103CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF SEAWALL, BARANGAY CANDUAO ORIENTAL, VALENCIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk20 | —-0.075 |
| 197 | 18HN0046CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING (CHILD MINDING CENTER) IN CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱3M | 100% | Low risk19 | —-0.095 |
| 198 | 18HB0075REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS - JCT. DAT-AN, CARMEN - SIERRA BULLONES - PILAR - ALICIA ROAD | Region VII | Bohol 3rd DEO | Completed | ₱960.4K | 100% | Low risk17 | —-0.091 |
| 199 | 18HB0079LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS-CONSTRUCTION OF CONCRETE ROAD, BRGY. QUEZON, BILAR, BOHOL, KO 0+000.00-KO 0+220.00 | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.091 |
| 200 | 20HB0062LOCAL PROGRAM, CONSTRUCTION/REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF ROAD, BRGY. LOMBOG, GUINDULMAN, BOHOL STA.0+000.00 -STA.0+105.03 | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.094 |