Contractor dossier
192 projects on file, including joint ventures this contractor is part of.
Total projects
192
Total budget
₱1.7B
Average progress
97.9%
Completion rate
86.5%
Average risk score
44.1
Medium risk on average, out of 100
Flagged as unusual
3
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 192 | ₱1.7B | 44.1 | 3 | 97.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 104 | ₱663.8M | 41.3 | 0 | 97.6% |
| Roads | 56 | ₱643.8M | 40.2 | 0 | 99.6% |
| Flood Control and Drainage | 13 | ₱166M | 46.3 | 0 | 100.0% |
| GAA 2025 SSP | 7 | ₱86.8M | 92.9 | 1 | 92.9% |
| OTHER | 6 | ₱58.1M | 72.1 | 2 | 85.2% |
| Bridges | 5 | ₱32.2M | 39.8 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.4M | 25.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0026CONSTRUCTION OF BRIDGE, BARANGAY POBLACION 2 - BARANGAY POBLACION 3, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱24M | 79% | High risk95 | Flagged0.002 |
| 25DL0074CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT ISLAND DISTRICT HOSPITAL, PHASE II, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱19.1M | 100% | High risk95 | —-0.008 |
| 25DM0062CONSTRUCTION OF ROAD, MAGSAYSAY - SAN VICENTE KANLURAN, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱14.6M | 100% | High risk94 | —-0.008 |
| 25DL0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DEL PILAR, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱7.3M | 83% | High risk94 | —-0.002 |
| 25DL0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SILANG, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱7.3M | 88% | High risk93 | —-0.003 |
| 25DM0040CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY BUYAO, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk90 | —-0.032 |
| 25DM0039CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PINAGBAYANAN, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk89 | —-0.032 |
| 25DL0196BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, CONSTRUCTION OF SCHOOL BUILDING, ANGELES ELEMENTARY SCHOOL, BARANGAY ANGELES, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 85% | High risk82 | Flagged0.034 |
| 25DL0051BARANGAYS MABUNGA, BUNGAHAN ACCESS ROAD IN SUPPORT OF AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | High risk76 | —-0.017 |
| 25DL0064LALAGUNA ECOTOURISM ROAD LEADING TO KAMPO PUSA, MARSHLAND, VERA SHRINE, CENTENNIAL TREES, COMMUNITY FLOWER GARDEN, AND COMMUNITY LIVELIHOOD CENTER AND DELICACIES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 28% | High risk75 | Flagged0.004 |
| 25DL0029CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), ACCESS ROADS IN SUPPORT OF AGRI-BASED INDUSTRIES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 99% | High risk75 | —-0.016 |
| 22DL0134ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0143 + 096 - K0143 + 332, K0145 + 369 - K0145 + 520 | Region IV-A | Quezon 4th DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.040 |
| 25DM0064NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - AGDANGAN BY-PASS ROAD, QUEZON, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱96.1M | 77% | High risk61 | —-0.062 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0196BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, CONSTRUCTION OF SCHOOL BUILDING, ANGELES ELEMENTARY SCHOOL, BARANGAY ANGELES, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 85% | High risk82 | Flagged0.034 |
| 25DL0064LALAGUNA ECOTOURISM ROAD LEADING TO KAMPO PUSA, MARSHLAND, VERA SHRINE, CENTENNIAL TREES, COMMUNITY FLOWER GARDEN, AND COMMUNITY LIVELIHOOD CENTER AND DELICACIES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 28% | High risk75 | Flagged0.004 |
| 25DL0026CONSTRUCTION OF BRIDGE, BARANGAY POBLACION 2 - BARANGAY POBLACION 3, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱24M | 79% | High risk95 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23DL0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 13. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAPULUAN CENTRAL, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.101 |
| 77 | 24DM0009CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KINAGUNAN IBABA, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.102 |
| 78 | 24DL0020ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 13. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANGIRIN RIVER, PEREZ, | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.085 |
| 79 | 24DL0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 5. ACCESS ROAD LEADING TO LIMBON LIMBON FALLS, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.105 |
| 80 | 24DL0098ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 20. CONSTRUCTION OF SEAWALL, BARANGAY MANLAYO, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.085 |
| 81 | 24DL0066ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 15. CONSTRUCTION OF PROTECTION STRUCTURE ALONG FRENZA RIVER, GUINAYANGAN, | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.086 |
| 82 | 22DL0144ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MALING RIVER, ATIMONAN, Q | Region IV-A | Quezon 4th DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.087 |
| 83 | 25DL0198BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, CONSTRUCTION OF SCHOOL BUILDING, SAN RAFAEL ELEMENTARY SCHOOL, BARANGAY SAN RAFAEL, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.006 |
| 84 | 25DL0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD LEADING TO LAMESANG BATO, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.077 |
| 85 | 24DL0065ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 11. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOSONG RIVER, PLARIDEL | Region IV-A | Quezon 4th DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.087 |
| 86 | 22DL0061ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BOCBOC CREEK, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.085 |
| 87 | 22DL0040ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF PROTECTION WORKS (SEAWALL) ALONG FRENZA RIVER, GUINAYANG | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.085 |
| 88 | 22DL0041ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL IN BARANGAY MANLAYO, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.086 |
| 89 | 22DL0072PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MALING RIVER, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.087 |
| 90 | 24DL0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 15. LALAGUNA ECOTOURISM ROAD LEADING TO KAMPO PUSA, MARSHLAND, VERA SHRINE, CENTENNIAL | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.104 |
| 91 | 25DM0032CONSTRUCTION OF ROAD, BARANGAY KANLURANG MALIGAYA, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱14.6M | 100% | Medium risk46 | —-0.077 |
| 92 | 24DL0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 2. ACCESS ROAD LEADING TO INACLAGAN FALLS, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.106 |
| 93 | 24DL0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 4. ACCESS ROAD LEADING TO LAMESANG BATO, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 94 | 23DM0114CONSTRUCTION OF MULTI-PURPOSE BUILDINGS, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.099 |
| 95 | 24DL0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) 3. ACCESS ROADS IN SUPPORT OF COCONUT PROCESSING, COFFEE AND OTHER AGRI-BASED INDUSTRIES, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.106 |
| 96 | 22DL0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ATIMONAN-PLARIDEL ROAD VIA DUHAT, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.106 |
| 97 | 24DL0111CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) 5. ACCESS ROADS IN SUPPORT OF HANDICRAFTS, FOODS, COCONUT PROCESSING AND OTHER AGRI-BASED INDUSTRIES, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.107 |
| 98 | 24DL0006CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 1. ACCESS ROAD LEADING TO BOSQUE CAVE, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.105 |
| 99 | 22DL0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SUMULONG-GUINAYANGAN ROAD | Region IV-A | Quezon 4th DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.101 |
| 100 | 24DL0034ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 3. LOPEZ BY-PASS, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.105 |