Contractor dossier
99 projects on file, including joint ventures this contractor is part of.
Total projects
99
Total budget
₱5B
Average progress
93.7%
Completion rate
77.8%
Average risk score
39.3
Medium risk on average, out of 100
Flagged as unusual
13
13.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 98 | ₱4.8B | 38.9 | 12 | 94.1% |
| Central Office | 1 | ₱215M | 83.0 | 1 | 59.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 48 | ₱2.4B | 31.6 | 0 | 98.1% |
| Flood Control and Drainage | 18 | ₱1B | 34.9 | 0 | 100.0% |
| OTHER | 11 | ₱913.9M | 79.3 | 8 | 81.1% |
| Buildings and Facilities | 8 | ₱57.4M | 20.2 | 0 | 100.0% |
| Bridges | 6 | ₱335M | 31.3 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱19.3M | 24.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱69.6M | 91.8 | 2 | 11.1% |
| GAA 2025 OO-2 | 2 | ₱163M | 87.9 | 2 | 66.3% |
| GAA 2025 SSP | 1 | ₱4.7M | 89.8 | 1 | 24.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MI0034CONSTRUCTION OF LUMAYONG FLOOD CONTROL PROJECT (DOWNSTREAM OF CARMEN BRIDGE, KAYAGA TO SITIO PUNOL, PHASE V) ALONG PULANGI RIVER, KABACAN COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱136.3M | 77% | High risk92 | Flagged0.007 |
| 25M00117WIDENING OF BRIDGE - LANGKONG BR. (B02133MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1901+481-K1901+513, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 8% | High risk92 | Flagged0.029 |
| 25M00113WIDENING OF BRIDGE - BUGASAN BR. (B02131MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1887+986.000-K1888+046.000, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 14% | High risk92 | Flagged0.028 |
| 25MI0096COMPLETION/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BRGY. TINIMBACAN, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱4.7M | 25% | High risk90 | Flagged0.035 |
| 24M00319CONSTRUCTION OF ROAD, STA 0+000 - STA 1+200, BARANGAY SOLON, SULTAN MASTURA, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.7M | 23% | High risk87 | Flagged0.065 |
| 25MC0021CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 6, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.6M | 55% | High risk84 | Flagged0.001 |
| 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 24M00006WIDENING OF BRIDGE - LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱137M | 100% | High risk81 | Flagged0.010 |
| 23M00004CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA. 0+000 STA. 0+238, PIGCAWAYAN, COTABATO | Region XII | Region XII | On-Going | ₱106.2M | 100% | High risk81 | Flagged0.018 |
| 24M00235CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, PHASE I, BARANGAY SALIMBAO, STA. 0+000 - STA. 0+350, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱66.5M | 100% | High risk79 | —-0.000 |
| 24M00234CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, BARANGAY SALIMBAO (PHASE II), STA. 0+000 - STA. 0+340, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱66.5M | 100% | High risk79 | —-0.000 |
| 23M00030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR | Region XII | Region XII | On-Going | ₱101.3M | 73% | High risk79 | Flagged0.025 |
| 24MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1666 + 620 - K1666 + 766, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱72.4M | 96% | High risk79 | Flagged0.005 |
| 24M00060WIDENING OF BRIDGE - PIGCALAGAN BR. BR. (B02135MN) ALONG DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECT), K1719 + 008.5 - K1719 + 026.5, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.4M | 41% | High risk76 | Flagged0.013 |
| 23M00235REHABILITATION OF PANATAN BRIDGE ALONG DAVAO-COTABATO ROAD, K1717+(-809) - K1717+(-797), SULTAN KUDARAT, MAGUINDANAO-PHASE II | Region XII | Region XII | Completed | ₱19.3M | 100% | High risk74 | —-0.035 |
| 23M00169ROAD WIDENING - COTABATO-LANAO ROAD, K1901+290 - K1903+280, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱92.6M | 100% | High risk74 | Flagged0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24M00319CONSTRUCTION OF ROAD, STA 0+000 - STA 1+200, BARANGAY SOLON, SULTAN MASTURA, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.7M | 23% | High risk87 | Flagged0.065 |
| 25MI0096COMPLETION/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BRGY. TINIMBACAN, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱4.7M | 25% | High risk90 | Flagged0.035 |
| 25M00117WIDENING OF BRIDGE - LANGKONG BR. (B02133MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1901+481-K1901+513, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 8% | High risk92 | Flagged0.029 |
| 25M00113WIDENING OF BRIDGE - BUGASAN BR. (B02131MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1887+986.000-K1888+046.000, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 14% | High risk92 | Flagged0.028 |
| 23M00030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR | Region XII | Region XII | On-Going | ₱101.3M | 73% | High risk79 | Flagged0.025 |
| 23M00004CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA. 0+000 STA. 0+238, PIGCAWAYAN, COTABATO | Region XII | Region XII | On-Going | ₱106.2M | 100% | High risk81 | Flagged0.018 |
| 23M00169ROAD WIDENING - COTABATO-LANAO ROAD, K1901+290 - K1903+280, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱92.6M | 100% | High risk74 | Flagged0.013 |
| 24M00060WIDENING OF BRIDGE - PIGCALAGAN BR. BR. (B02135MN) ALONG DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECT), K1719 + 008.5 - K1719 + 026.5, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.4M | 41% | High risk76 | Flagged0.013 |
| 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 24M00006WIDENING OF BRIDGE - LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱137M | 100% | High risk81 | Flagged0.010 |
| 25MI0034CONSTRUCTION OF LUMAYONG FLOOD CONTROL PROJECT (DOWNSTREAM OF CARMEN BRIDGE, KAYAGA TO SITIO PUNOL, PHASE V) ALONG PULANGI RIVER, KABACAN COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱136.3M | 77% | High risk92 | Flagged0.007 |
| 24MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1666 + 620 - K1666 + 766, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱72.4M | 96% | High risk79 | Flagged0.005 |
| 25MC0021CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 6, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.6M | 55% | High risk84 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25MI0034CONSTRUCTION OF LUMAYONG FLOOD CONTROL PROJECT (DOWNSTREAM OF CARMEN BRIDGE, KAYAGA TO SITIO PUNOL, PHASE V) ALONG PULANGI RIVER, KABACAN COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱136.3M | 77% | High risk92 | Flagged0.007 |
| 2 | 25M00117WIDENING OF BRIDGE - LANGKONG BR. (B02133MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1901+481-K1901+513, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 8% | High risk92 | Flagged0.029 |
| 3 | 25M00113WIDENING OF BRIDGE - BUGASAN BR. (B02131MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1887+986.000-K1888+046.000, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 14% | High risk92 | Flagged0.028 |
| 4 | 25MI0096COMPLETION/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BRGY. TINIMBACAN, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱4.7M | 25% | High risk90 | Flagged0.035 |
| 5 | 24M00319CONSTRUCTION OF ROAD, STA 0+000 - STA 1+200, BARANGAY SOLON, SULTAN MASTURA, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.7M | 23% | High risk87 | Flagged0.065 |
| 6 | 25MC0021CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 6, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.6M | 55% | High risk84 | Flagged0.001 |
| 7 | 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 8 | 24M00006WIDENING OF BRIDGE - LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱137M | 100% | High risk81 | Flagged0.010 |
| 9 | 23M00004CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA. 0+000 STA. 0+238, PIGCAWAYAN, COTABATO | Region XII | Region XII | On-Going | ₱106.2M | 100% | High risk81 | Flagged0.018 |
| 10 | 24M00235CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, PHASE I, BARANGAY SALIMBAO, STA. 0+000 - STA. 0+350, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱66.5M | 100% | High risk79 | —-0.000 |
| 11 | 24M00234CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, BARANGAY SALIMBAO (PHASE II), STA. 0+000 - STA. 0+340, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱66.5M | 100% | High risk79 | —-0.000 |
| 12 | 23M00030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR | Region XII | Region XII | On-Going | ₱101.3M | 73% | High risk79 | Flagged0.025 |
| 13 | 24MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1666 + 620 - K1666 + 766, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱72.4M | 96% | High risk79 | Flagged0.005 |
| 14 | 24M00060WIDENING OF BRIDGE - PIGCALAGAN BR. BR. (B02135MN) ALONG DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECT), K1719 + 008.5 - K1719 + 026.5, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.4M | 41% | High risk76 | Flagged0.013 |
| 15 | 23M00235REHABILITATION OF PANATAN BRIDGE ALONG DAVAO-COTABATO ROAD, K1717+(-809) - K1717+(-797), SULTAN KUDARAT, MAGUINDANAO-PHASE II | Region XII | Region XII | Completed | ₱19.3M | 100% | High risk74 | —-0.035 |
| 16 | 23M00169ROAD WIDENING - COTABATO-LANAO ROAD, K1901+290 - K1903+280, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱92.6M | 100% | High risk74 | Flagged0.013 |
| 17 | 24M00002ROAD WIDENING - BANISILAN-GUILING-ALAMADA-LIBUNGAN RD - K1682+314- K1686+066, ALAMADA, COTABATO | Region XII | Region XII | On-Going | ₱145.6M | 77% | Medium risk51 | —-0.026 |
| 18 | 21M00038CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-COTABATO CITY EAST DIVERSION ROAD, K1851+735-K1855+911.60; K1855+922.2-K1856+751.30, SULTAN KUDARAT, MAGUINDANAO | Region XII | Region XII | Completed | ₱148.5M | 100% | Medium risk50 | —-0.069 |
| 19 | 24MI0061CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, UPSTREAM OF TACUPAN BRIDGE, TACUPAN, CARMEN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.064 |
| 20 | 23M00151CONSTRUCTION OF KABACAN FLOOD CONTROL DIKE PHASE III ALONG BARANGAY MAGATOS, KILAGASAN AND CUYAPON, STA. 0 + 000 - STA. 0 + 692.109, KABACAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱92.6M | 100% | Medium risk50 | —-0.058 |
| 21 | 24M00084CONCRETING OF ROAD FROM KIARING PROPER TO SITIO TUBPONG, STA. 0+000-STA.1+7145, BRGY. KIARING, BANISILAN, COTABATO | Region XII | Region XII | On-Going | ₱56.8M | 93% | Medium risk48 | —-0.017 |
| 22 | 22M00055WIDENING OF BRIDGE-LUN MASLA BR (B01047MN)ALONG SARANGANI-DAVAO DEL SUR COASTAL RD, MALAPATAN, SARANGANI | Region XII | Region XII | Completed | ₱170.1M | 100% | Medium risk47 | —-0.015 |
| 23 | 17MD0061SLOPE PROTECTION WORKS ALONG MIDSAYAP-MAKAR RD (OLANDANG SECT), MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.050 |
| 24 | 20M00017RECONSTRUCTION OF COTABATO -LANAO NATIONAL ROAD WITH LINE CANAL (PARANG SECTION), K1883+680-K1884+467.264; K1884+491.036-K1886+830, PARANG, MAGUINDANAO. | Region XII | Region XII | Completed | ₱120M | 100% | Medium risk46 | —-0.067 |
| 25 | 18M00002ROAD WIDENING-DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.) K1618+083-K1618+317, K1618+556-K1620+112, K1620+152-K1621+922, K1631+037-K1632+000, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Region XII | Completed | ₱108.7M | 100% | Medium risk45 | —-0.040 |