Contractor dossier
99 projects on file, including joint ventures this contractor is part of.
Total projects
99
Total budget
₱5B
Average progress
93.7%
Completion rate
77.8%
Average risk score
39.3
Medium risk on average, out of 100
Flagged as unusual
13
13.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 98 | ₱4.8B | 38.9 | 12 | 94.1% |
| Central Office | 1 | ₱215M | 83.0 | 1 | 59.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 48 | ₱2.4B | 31.6 | 0 | 98.1% |
| Flood Control and Drainage | 18 | ₱1B | 34.9 | 0 | 100.0% |
| OTHER | 11 | ₱913.9M | 79.3 | 8 | 81.1% |
| Buildings and Facilities | 8 | ₱57.4M | 20.2 | 0 | 100.0% |
| Bridges | 6 | ₱335M | 31.3 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱19.3M | 24.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱69.6M | 91.8 | 2 | 11.1% |
| GAA 2025 OO-2 | 2 | ₱163M | 87.9 | 2 | 66.3% |
| GAA 2025 SSP | 1 | ₱4.7M | 89.8 | 1 | 24.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MI0034CONSTRUCTION OF LUMAYONG FLOOD CONTROL PROJECT (DOWNSTREAM OF CARMEN BRIDGE, KAYAGA TO SITIO PUNOL, PHASE V) ALONG PULANGI RIVER, KABACAN COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱136.3M | 77% | High risk92 | Flagged0.007 |
| 25M00117WIDENING OF BRIDGE - LANGKONG BR. (B02133MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1901+481-K1901+513, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 8% | High risk92 | Flagged0.029 |
| 25M00113WIDENING OF BRIDGE - BUGASAN BR. (B02131MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1887+986.000-K1888+046.000, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 14% | High risk92 | Flagged0.028 |
| 25MI0096COMPLETION/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BRGY. TINIMBACAN, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱4.7M | 25% | High risk90 | Flagged0.035 |
| 24M00319CONSTRUCTION OF ROAD, STA 0+000 - STA 1+200, BARANGAY SOLON, SULTAN MASTURA, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.7M | 23% | High risk87 | Flagged0.065 |
| 25MC0021CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 6, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.6M | 55% | High risk84 | Flagged0.001 |
| 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 24M00006WIDENING OF BRIDGE - LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱137M | 100% | High risk81 | Flagged0.010 |
| 23M00004CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA. 0+000 STA. 0+238, PIGCAWAYAN, COTABATO | Region XII | Region XII | On-Going | ₱106.2M | 100% | High risk81 | Flagged0.018 |
| 24M00235CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, PHASE I, BARANGAY SALIMBAO, STA. 0+000 - STA. 0+350, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱66.5M | 100% | High risk79 | —-0.000 |
| 24M00234CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG RIO GRANDE DE MINDANAO, BARANGAY SALIMBAO (PHASE II), STA. 0+000 - STA. 0+340, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱66.5M | 100% | High risk79 | —-0.000 |
| 23M00030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR | Region XII | Region XII | On-Going | ₱101.3M | 73% | High risk79 | Flagged0.025 |
| 24MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1666 + 620 - K1666 + 766, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱72.4M | 96% | High risk79 | Flagged0.005 |
| 24M00060WIDENING OF BRIDGE - PIGCALAGAN BR. BR. (B02135MN) ALONG DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECT), K1719 + 008.5 - K1719 + 026.5, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.4M | 41% | High risk76 | Flagged0.013 |
| 23M00235REHABILITATION OF PANATAN BRIDGE ALONG DAVAO-COTABATO ROAD, K1717+(-809) - K1717+(-797), SULTAN KUDARAT, MAGUINDANAO-PHASE II | Region XII | Region XII | Completed | ₱19.3M | 100% | High risk74 | —-0.035 |
| 23M00169ROAD WIDENING - COTABATO-LANAO ROAD, K1901+290 - K1903+280, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱92.6M | 100% | High risk74 | Flagged0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24M00319CONSTRUCTION OF ROAD, STA 0+000 - STA 1+200, BARANGAY SOLON, SULTAN MASTURA, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.7M | 23% | High risk87 | Flagged0.065 |
| 25MI0096COMPLETION/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BRGY. TINIMBACAN, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱4.7M | 25% | High risk90 | Flagged0.035 |
| 25M00117WIDENING OF BRIDGE - LANGKONG BR. (B02133MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1901+481-K1901+513, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 8% | High risk92 | Flagged0.029 |
| 25M00113WIDENING OF BRIDGE - BUGASAN BR. (B02131MN) ALONG MAHARLIKA HIGHWAY( COTABATO-LANAO RD), K1887+986.000-K1888+046.000, MATANOG, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱34.8M | 14% | High risk92 | Flagged0.028 |
| 23M00030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR | Region XII | Region XII | On-Going | ₱101.3M | 73% | High risk79 | Flagged0.025 |
| 23M00004CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA. 0+000 STA. 0+238, PIGCAWAYAN, COTABATO | Region XII | Region XII | On-Going | ₱106.2M | 100% | High risk81 | Flagged0.018 |
| 23M00169ROAD WIDENING - COTABATO-LANAO ROAD, K1901+290 - K1903+280, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱92.6M | 100% | High risk74 | Flagged0.013 |
| 24M00060WIDENING OF BRIDGE - PIGCALAGAN BR. BR. (B02135MN) ALONG DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECT), K1719 + 008.5 - K1719 + 026.5, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱18.4M | 41% | High risk76 | Flagged0.013 |
| 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 24M00006WIDENING OF BRIDGE - LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱137M | 100% | High risk81 | Flagged0.010 |
| 25MI0034CONSTRUCTION OF LUMAYONG FLOOD CONTROL PROJECT (DOWNSTREAM OF CARMEN BRIDGE, KAYAGA TO SITIO PUNOL, PHASE V) ALONG PULANGI RIVER, KABACAN COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱136.3M | 77% | High risk92 | Flagged0.007 |
| 24MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1666 + 620 - K1666 + 766, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱72.4M | 96% | High risk79 | Flagged0.005 |
| 25MC0021CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 6, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.6M | 55% | High risk84 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22M00024CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) AT ESTEROS RIVER UPSTREAM, PHASE II, STA 0+000-STA 0+200, COTABATO CITY | Region XII | Region XII | Completed | ₱28.8M | 100% | Low risk25 | —-0.077 |
| 77 | 21MD0028LIBUNGAN RIVER FLOOD CONTROL PROJECT (NALIN SECTION-PHASE III), NALIN, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱30.9M | 100% | Low risk25 | —-0.075 |
| 78 | 18MD0099CONST. OF FLOOD MITIGATION STRUCTURE- CONST. OF NALIN FLOOD CONTROL ALONG LIBUNGAN RIVER, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱32.4M | 100% | Low risk25 | —-0.078 |
| 79 | 20MD0022CONSTRUCTION OF CAMANSI FLOOD CONTROL ALONG LIBUNGAN RIVER, CAMANSI, ALAMADA, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱34.2M | 100% | Low risk25 | —-0.077 |
| 80 | 18MD0070PREVENTIV MAINTENANCE ROAD : CONCRETE REBLOCKING-BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, ALAMADA & LIBUNGAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱6.2M | 100% | Low risk25 | —-0.090 |
| 81 | 23MI0074CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SALAMA, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱9.7M | 100% | Low risk25 | —-0.056 |
| 82 | 21MC0062ROAD WIDENING - DAVAO - COTABATO RD (DUAL) - (S00684MN) CHAINAGE 181 - CHAINAGE 821, CHAINAGE 911 - CHAINAGE 1421, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱26M | 100% | Low risk25 | —-0.087 |
| 83 | 22MC0014WIDENING OF PERMANENT BRIDGES - BIG MATEO BR. (B01935MN) ALONG KIDAPAWAN-MAGPET-PANGAOAN RD, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱34.2M | 100% | Low risk25 | —-0.056 |
| 84 | 25MI0005BATO-SARAYAN ROAD IN SUPPORT TO FISH, CORN, AND RICE INDUSTRIES, MATALAM, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱29.3M | 100% | Low risk25 | —-0.089 |
| 85 | 22MD0067CONSTRUCTION OF BRIDGE- CONSTRUCTION OF BRIDGE IN SAN ISIDRO, MIDSAYAP, NORTH COTABATO, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱24.4M | 100% | Low risk24 | —-0.057 |
| 86 | 23MI0045CONSTRUCTION OF WATER SYSTEM IN BARANGAY TINIMBACAN, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱4.8M | 100% | Low risk24 | —-0.056 |
| 87 | 23MI0043CONSTRUCTION OF WATER SYSTEM IN BARANGAY BUSAON, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱4.8M | 100% | Low risk24 | —-0.056 |
| 88 | 21M00066REHABILITATION OF PANATAN BRIDGE ALONG DAVAO-COTABATO ROAD, SULTAN KUDARAT, MAGUINDANAO | Region XII | Region XII | Completed | ₱9.5M | 100% | Low risk24 | —-0.062 |
| 89 | 19MC0118CONCRETING OF CROSSING TILAKAP, BRGY. PACO- BRGY. KALAISAN FMR, BRGY. PACO AND BRGY. KALAISAN, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱19.9M | 100% | Low risk21 | —-0.030 |
| 90 | 18MH0088CONCRETING OF KEYTODAC - NEW CALINOG FMR BRGY. KEYTODAC, LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱9.7M | 100% | Low risk21 | —-0.027 |
| 91 | 18MD0194CONSTRUCTION OF 2STY 6CL SCHOOL BUILDING (BUILDING 2), NICAAN HIGH SCHOOL, LIBUNGAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱11.1M | 100% | Low risk21 | —-0.046 |
| 92 | 23MI0097CONCRETING OF PUROK 3, BRGY. TAMBAC FMR, BRGY. TAMBAC, TULUNAN. COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱11.9M | 100% | Low risk20 | —-0.035 |
| 93 | 18MA0073CONCRETING OF ROAD, BRGY. POBLACION I, PARANG, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱2.4M | 100% | Low risk19 | —-0.052 |
| 94 | 17MD0062ROAD UPGRADING (UNPAVED TO PAVED) ALONG KAPINPILAN-LUMOPOG RD, BRGY LUMOPOG, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱2.8M | 100% | Low risk19 | —-0.052 |
| 95 | 18MA0074CONCRETING OF ROAD, BRGY. POBLACION II, PARANG, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱2.4M | 100% | Low risk19 | —-0.052 |
| 96 | 19MA0048CONSTRUCTION OF ROAD, SITIO LU-LEA, SULTAN KUDARAT, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱2.9M | 100% | Low risk12 | —-0.085 |
| 97 | 21MA0045CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY UNGAP, SULTAN KUDARAT, MAGUINDANAO | Region XII | Region XII | Completed | ₱3M | 100% | Low risk9 | —-0.089 |
| 98 | 23MI0082CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE COVERED COURT, SITIO LANAG, BRGY. MIGUEL MACASARTE, BANISILAN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱2.7M | 100% | Low risk8 | —-0.088 |
| 99 | 18MD0212COMPLETION OF 2STY 6CL SCHOOL BUILDING 2, NICAAN HIGH SCHOOL, LIBUNGAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱1.5M | 100% | Low risk4 | —-0.045 |