Contractor dossier
21 projects on file, including joint ventures this contractor is part of.
Total projects
21
Total budget
₱257.2M
Average progress
100.0%
Completion rate
100.0%
Average risk score
41.3
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 13 | ₱207.1M | 47.4 | 0 | 100.0% |
| National Capital Region | 8 | ₱50.2M | 31.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 7 | ₱68.5M | 34.0 | 0 | 100.0% |
| Roads | 6 | ₱68.4M | 40.5 | 0 | 100.0% |
| Flood Control and Drainage | 4 | ₱52.6M | 46.4 | 0 | 100.0% |
| Bridges | 3 | ₱62.2M | 40.9 | 0 | 100.0% |
| OTHER | 1 | ₱5.6M | 77.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17ID0056ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY BURAUEN-MAHAGNAO ROAD S00101LT K0988+200 - K0988+320 | Region VIII | Leyte 2nd DEO | Completed | ₱5.6M | 100% | High risk78 | —-0.035 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17ID0056ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY BURAUEN-MAHAGNAO ROAD S00101LT K0988+200 - K0988+320 | Region VIII | Leyte 2nd DEO | Completed | ₱5.6M | 100% | High risk78 | —-0.035 |
| 2 | 19I00124REPLACEMENT OF BRIDGES FROM TEMPORARY TO PERMANENT, CABIBIHAN BR., BRGY. CABIBIHAN, CAIBIRAN, BILIRAN | Region VIII | Region VIII | Completed | ₱54.5M | 100% | Medium risk54 | —-0.007 |
| 3 | 20OD0088CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GEN. T. DE LEON, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱23.6M | 100% | Medium risk50 | —-0.099 |
| 4 | 18IA0083CONSTRUCTION OF 2-STOREY 8-CLASSROOM NATIONAL HIGH SCHOOL BUILDING, MANLABANG NATIONAL HIGH SCHOOL, BGRY. MANLABANG, CAIBIRAN, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱20.5M | 100% | Medium risk50 | —-0.049 |
| 5 | 19IE0041ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0993+250 - K0993+400, K1001+100-K1001+150LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱30.1M | 100% | Medium risk49 | —-0.095 |
| 6 | 20IE0020ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS, BELEN-CONSUEGRA RD, K0981+600-K0981+750LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱19.5M | 100% | Medium risk49 | —-0.095 |
| 7 | 18IA0107CONSTRUCTION OF 3 STOREY (6 CLASSROOM) SCHOOL BUILDING (9.5M X 23.00M) CABUCGAYAN NATIONAL HIGH SCHOOL | Region VIII | Biliran DEO | Completed | ₱14.8M | 100% | Medium risk49 | —-0.053 |
| 8 | 21IA0019CONSTRUCTION OF SEAWALL, BARANGAY VIRGINIA TO BARANGAY MARVEL, BILIRAN (FROM 11.65824444, 124.5412139 TO 11.65951944, 124.5401722) | Region VIII | Biliran DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.081 |
| 9 | 21IA0048CONSTRUCTION OF BOOL FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.521303, 11.673975 - 124.553470, 11.588473), CULABA, BILIRAN PROVINCE | Region VIII | Biliran DEO | Completed | ₱19.1M | 100% | Medium risk47 | —-0.082 |
| 10 | 19IA0028CONSTRUCTION OF AMAMBAHAG FLOOD CONTROL STRUCTURES ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.52057°, 11.66477° - 124.51943°, 11.66414°), CULABA, BILIRAN | Region VIII | Biliran DEO | Completed | ₱19M | 100% | Medium risk47 | —-0.083 |
| 11 | 20OD0064REHABILITATION OF ROADS AND DRAINAGE ALONG LEGION OF MARY ST., BRGY. MARULAS, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.099 |
| 12 | 21IA0011CONSTRUCTION OF FLOOD CONTROL, BRGY. BOOL EAST, CULABA, BILIRAN 124.521328°, 11.673928° - 124.521303°, 11.673975° | Region VIII | Biliran DEO | Completed | ₱4.8M | 100% | Medium risk45 | —-0.078 |
| 13 | 21IA0078REHABILITAION/ MAJOR REPAIR OF PERMANENT BRIDGE, BAGONGBONG BR. (B00034BR) ALONG BILIRAN CIRCUMFERENTIAL RD | Region VIII | Biliran DEO | Completed | ₱4.7M | 100% | Medium risk44 | —-0.059 |
| 14 | 19OD0231CONSTRUCTION OF ROADS, PATHWALKS AND DRAINAGE SYSTEM ALONG BARANGAY 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.097 |
| 15 | 17IE0015REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSIDE, LEMON-LEYTE-BILIRAN ROAD, K0983+818 - K0983+881BRGY. SAMBULAWAN, LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.8M | 100% | Medium risk33 | —-0.055 |
| 16 | 17IE0014CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES TERTIARY LARAY BR. (B00166LT) ALONG STO. ROSARIO-VILLABA ROADBRGY. CASILION, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.033 |
| 17 | 19OD0233CONSTRUCTION/ REHABILITATION OF ROADS, PATHWALKS AND DRAINAGE SYSTEM ALONG BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.8M | 100% | Low risk24 | —-0.097 |
| 18 | 19OD0083CONSTRUCTION OF MULTI-PURPOSE BUILDING IN PACHECO (PHASE 2), BRGY. DALANDANAN, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.8M | 100% | Low risk24 | —-0.101 |
| 19 | 20OD0065REHABILITATION OF MULTI-PURPOSE BUILDING, MAPULANG LUPA ELEMENTARY SCHOOL, BARANGAY MAPULANG LUPA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.9M | 100% | Low risk24 | —-0.090 |
| 20 | 19OD0081CONSTRUCTION OF MULTI-PURPOSE BUILDING, MALANDAY NATIONAL HIGH SCHOOL PHASE 2, BARANGAY MALANDAY, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.4M | 100% | Low risk23 | —-0.101 |
| 21 | 19OD0089CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PASOLO PHASE 2, BARANGAY PASOLO, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱1.4M | 100% | Low risk18 | —-0.100 |