Contractor dossier
61 projects on file, including joint ventures this contractor is part of.
Total projects
61
Total budget
₱5.5B
Average progress
83.7%
Completion rate
68.9%
Below 70%
Average risk score
60.2
High risk on average, out of 100
Flagged as unusual
10
16.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 61 | ₱5.5B | 60.2 | 10 | 83.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 28 | ₱2.7B | 57.7 | 2 | 87.2% |
| Roads | 14 | ₱885M | 54.2 | 1 | 79.4% |
| OTHER | 8 | ₱790M | 78.1 | 5 | 71.5% |
| Bridges | 7 | ₱534.5M | 54.4 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱101.6M | 52.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱252.6M | 96.1 | 1 | 40.1% |
| GAA 2025 OO-2 | 1 | ₱195.6M | 93.5 | 1 | 40.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00050SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PHASE 4, BARANGAY 89, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱252.6M | 40% | High risk96 | Flagged0.047 |
| 25I00080CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱195.6M | 40% | High risk93 | Flagged0.020 |
| 24I00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG AND BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱187.9M | 82% | High risk84 | Flagged0.031 |
| 23I00115SIPAG - INTERJURISDICTIONAL ROADS AND/OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, BARANGAY 89, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱96.4M | 100% | High risk83 | —-0.020 |
| 24IC0068CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. MALAGUICAY AND BRGY. BINONGTOAN, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.018 |
| 22I00061CONSTRUCTION (COMPLETION) OF STORM SURGE PROTECTION: BACKWATER DIKE AND EARLY WARNING STRUCTURE, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱97.5M | 91% | High risk82 | Flagged0.030 |
| 17I00015IMPROVEMENT / WIDENING OF NATIONAL ROADS, DAANG MAHARLIKA (LT), KO941+1488 - KO943+277; KO944+225 - KO945+212; KO946+460 - KO947+000; KO949+000 - KO949+290; KO954+448 - KO955+550, (S00083LT), LEYTE | Region VIII | Region VIII | Completed | ₱86.4M | 100% | High risk81 | —-0.025 |
| 20I00041NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PALO WEST BYPASS ROAD, LEYTE, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱78.2M | 100% | High risk81 | —-0.027 |
| 25I00073CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱236.2M | 20% | High risk68 | Flagged0.009 |
| 24I00012CONSTRUCTION OF BANGON FLOOD CONTROL STRUCTURE ALONG BANGON RIVER, BARANGAY SAN JOSE (PHASE 2), PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱169.7M | 91% | High risk68 | —-0.009 |
| 24IC0073CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (LEFT BANK-UPSTREAM), BRGY. CALOGCOG AND BRGY. ATIPOLO, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 69% | High risk67 | —-0.012 |
| 24IC0078CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, PHASE 2, BRGY. BALUD TO BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 85% | High risk67 | —-0.018 |
| 25I00111CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱207.1M | 27% | High risk67 | Flagged0.005 |
| 24I00002CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY STA. ELENA (UPSTREAM), TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱192.9M | 89% | High risk67 | —-0.002 |
| 23I00008CLUSTER 3: 1. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.8, BARANGAY SAN ROQUE, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.9, BARANGAY SAN ROQUE, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱226.2M | 100% | High risk67 | —-0.038 |
| 23I00023NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BYPASS ROAD EXTENSION, (CONSTRUCTION OF BRIDGE), BRGY. TIGBAO, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱207.1M | 100% | High risk67 | —-0.020 |
| 18ID0063CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES MINUHANG(BALUARTE)BALUD AND BALUD-DUKA ROAD CONNECTING TO BAGAHUPI-BABATNGON_STA. CRUZ-BARUGO-CARIGARA NATIONAL ROAD IN SUPPORT OF THE BARUGO ECO-ZONE,BARUGO,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱142.3M | 100% | High risk67 | —-0.034 |
| 24I00116SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM (PHASE 3), BARANGAY 89, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱192.9M | 76% | High risk66 | —-0.019 |
| 24IM0062REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, ST. FRANCIS 1 AND ST. FRANCIS 2, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.5M | 0% | High risk66 | Flagged0.004 |
| 24IM0072REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, NEW HOPE VILLAGE, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.5M | 0% | High risk65 | Flagged0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00050SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PHASE 4, BARANGAY 89, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱252.6M | 40% | High risk96 | Flagged0.047 |
| 24I00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG AND BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱187.9M | 82% | High risk84 | Flagged0.031 |
| 22I00061CONSTRUCTION (COMPLETION) OF STORM SURGE PROTECTION: BACKWATER DIKE AND EARLY WARNING STRUCTURE, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱97.5M | 91% | High risk82 | Flagged0.030 |
| 23IM0153CONSTRUCTION OF ROAD WITH DRAINAGE, HYACINTH EXT ST, BRGY. 77 TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱14.4M | 0% | Medium risk51 | Flagged0.027 |
| 25I00080CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱195.6M | 40% | High risk93 | Flagged0.020 |
| 24IC0068CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. MALAGUICAY AND BRGY. BINONGTOAN, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.018 |
| 25I00073CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱236.2M | 20% | High risk68 | Flagged0.009 |
| 25I00111CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱207.1M | 27% | High risk67 | Flagged0.005 |
| 24IM0072REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, NEW HOPE VILLAGE, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.5M | 0% | High risk65 | Flagged0.004 |
| 24IM0062REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, ST. FRANCIS 1 AND ST. FRANCIS 2, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.5M | 0% | High risk66 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23IC0114CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱106.1M | 100% | High risk63 | —-0.065 |
| 27 | 22I00057CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, BINAHAAN RIVER BASIN, RIGHT SIDE BANK, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱97.5M | 100% | High risk62 | —-0.068 |
| 28 | 25IC0046CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY SAN ISIDRO, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.4M | 62% | High risk62 | —-0.020 |
| 29 | 17I00033NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS - PRIMARY ROADS, PALO - CARIGARA - ORMOC ROAD, KO980+372 - KO982+186, KO945+654 - KO946+766, LEYTE, 2ND LD | Region VIII | Region VIII | Completed | ₱83.1M | 100% | Medium risk59 | —-0.053 |
| 30 | 19ID0050CONSTRUCTION OF NEW PERMANENT BRIDGES-IBAWON BR. ALONG LA PAZ-JAVIER-BITO ROAD | Region VIII | Leyte 2nd DEO | Completed | ₱89.6M | 100% | Medium risk57 | —-0.048 |
| 31 | 24IM0019ROAD WIDENING - TERTIARY ROADS - TIGBAO- STA FE-SN MIGUEL RD - K0903+089 - K0903+634, K0904+197 - K0904+926 | Region VIII | Tacloban City DEO | On-Going | ₱87.2M | 35% | Medium risk56 | —-0.026 |
| 32 | 19I00065CONSTRUCTION OF BANGON RIVER LEFT BANK BACKWATER DIKE, STA. 1+420.00 - STA. 1+800.00, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱89.9M | 100% | Medium risk56 | —-0.065 |
| 33 | 21IM0030INSTALLATION OF ROAD STUD (SOLAR), TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱74.9M | 100% | Medium risk56 | —-0.090 |
| 34 | 23IC0090NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PALO WEST BYPASS ROAD, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱77.1M | 100% | Medium risk56 | —-0.078 |
| 35 | 17IC0028OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG STA. FE-PASTRANA-DAGAMI ROAD (S00041LT), K0925+(-058) - K0928+215, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱27.9M | 100% | Medium risk55 | —-0.060 |
| 36 | 18ID0064CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD LEADING TO VILLACONZOILO AGRI AND ECO-TOURISM FARM AND SIWALA FALLS,BRGY. VILLAGONZOILO(VILLA CONSUELO)JARO,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱82M | 100% | Medium risk55 | —-0.088 |
| 37 | 22I00037CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.7, BRGY. SAN ROQUE, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱84.7M | 100% | Medium risk54 | —-0.072 |
| 38 | 22I00030CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.6, BRGY. SAN ROQUE, TANAUAN, LEYTE (REVISED) | Region VIII | Region VIII | Completed | ₱84.3M | 100% | Medium risk54 | —-0.069 |
| 39 | 19I00086CONSTRUCTION OF STORM SURGE PROTECTION: ROAD HEIGHTENING AND TIDE EMBANKMENT, SECTION 5 PHASE 10B, STATION 3+480 - STATION 3+700, SAN JOAQUIN, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱82.8M | 100% | Medium risk54 | —-0.069 |
| 40 | 23IM0076INSTALLATION OF SOLAR LED STREET LIGHTS ALONG DAANG MAHARLIKA (S00022LT) K0908+(-830) - K0910+472, TACLOBAN, CITY | Region VIII | Tacloban City DEO | Completed | ₱48M | 100% | Medium risk54 | —-0.095 |
| 41 | 19IM0049CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. 89, SAN JOSE, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱70.8M | 100% | Medium risk53 | —-0.076 |
| 42 | 23IM0153CONSTRUCTION OF ROAD WITH DRAINAGE, HYACINTH EXT ST, BRGY. 77 TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱14.4M | 0% | Medium risk51 | Flagged0.027 |
| 43 | 23IC0041CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. COGON, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.079 |
| 44 | 21IC0028CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD, K0918+757 - K0919+205, PAL0, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48.5M | 100% | Medium risk50 | —-0.079 |
| 45 | 23IC0108SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD STUD (SOLAR) ALONG KILING-TANAUAN-TABONTABON-JULITA ROAD (S00068LT) - K0928+(-672) - K0931+184, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱44.1M | 100% | Medium risk49 | —-0.095 |
| 46 | 18IM0032REPLACEMENT OF BRIDGE-PAYAPAY BR. (B00484LT) ALONG SN JOSE-MANLURIP-MACARTHUR PARK ROAD, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱27M | 100% | Medium risk49 | —-0.061 |
| 47 | 24IM0042CONSTRUCTION OF ROAD WITH DRAINAGE, PABLO COMPOUND, BARANGAY 79, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱19.6M | 0% | Medium risk49 | —-0.020 |
| 48 | 23IM0100INSTALLATION OF SOLAR LED STREET LIGHTS ALONG CALANIPAWAN ROAD (S00028LT) K0914+(-279) - K0915+214 & (S00019LT) K0913+(-721) - K0913+076, TACLOBAN, CITY | Region VIII | Tacloban City DEO | Completed | ₱21M | 100% | Medium risk49 | —-0.094 |
| 49 | 24IC0003ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - STA. FE-PASTRANA-DAGAMI ROAD - K0925+(-161) - K0925+714, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱34.3M | 100% | Medium risk49 | —-0.095 |
| 50 | 18IC0021WIDENING OF PERMANENT BRIDGES, CANDAHUG BRIDGE (B00052LT) ALONG GOVERNMENT CENTER ROAD NETWORK (S00047LT), PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱14.8M | 100% | Medium risk49 | —-0.061 |