Opening the dossier…
Opening the dossier…
Contractor dossier
258 projects on file, including joint ventures this contractor is part of.
Total projects
258
Total budget
₱8.4B
Average progress
95.5%
Completion rate
84.1%
Average risk score
49.2
Medium risk on average, out of 100
Flagged as unusual
9
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 251 | ₱7.9B | 49.2 | 9 | 95.7% |
| Region III | 5 | ₱453.8M | 50.3 | 0 | 100.0% |
| Region IV-B | 1 | ₱63.5M | 48.2 | 0 | 5.6% |
| National Capital Region | 1 | ₱39.2M | 47.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 92 | ₱2.9B | 48.4 | 0 | 95.3% |
| Buildings and Facilities | 87 | ₱1.7B | 46.8 | 1 | 96.9% |
| Flood Control and Drainage | 56 | ₱3.1B | 52.4 | 4 | 94.1% |
| OTHER | 9 | ₱172.5M | 68.0 | 3 | 88.9% |
| Bridges | 8 | ₱341.3M | 48.3 | 1 | 100.0% |
| Water Provision and Storage | 5 | ₱35.2M | 28.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 90.8 | 0 | 60.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DG0015CONST. OF BREAKWATER, BRGY. BUCANA SASAHAN, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱47.8M | 60% | High risk91 | —-0.022 |
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 24DF0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG IMUS RIVER,SEGMENT 2 | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 100% | High risk79 | —-0.020 |
| 24DF0074ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG CAÑAS RIVER, BARANGAY PARADAHAN II, PHASE III,TANZA | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.004 |
| 24DF0282CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST (COMPLETION) OF MULTI-PURPOSE BUILDING (DAMBANA NG PAMBANSANG WATAWAT), BARANGAY ALAPAN II-B, CITY OF IMUS, | Region IV-A | Cavite 1st DEO | On-Going | ₱59.4M | 38% | High risk76 | —-0.014 |
| 24DF0166CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG, BRGY CALUMPANG CERCA, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 86% | High risk75 | —-0.027 |
| 24DF0119CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (MULTI-PURPOSE HALL PHASE 2) AT BARANGAY CALUMPANG LEJOS, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 100% | High risk75 | —-0.035 |
| 25DF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROG CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER BRGY. BAYAN LUMA IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱71.7M | 74% | High risk74 | —-0.017 |
| 22DF0283CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)CONSTRUCTION OF ARESCOM MULTI-PURPOSE BUILDING (MOTORPO | Region IV-A | Cavite 1st DEO | Completed | ₱7.8M | 100% | High risk72 | —-0.073 |
| 22DF0326CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKASCONSTRUCTION OF ARMY ROTC CENTER AND MUSEUM - CAMP RIEGO | Region IV-A | Cavite 1st DEO | Completed | ₱29.7M | 100% | High risk72 | —-0.072 |
| 24DF0068CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANABU IB, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.9M | 92% | High risk72 | —-0.029 |
| 22DF0319CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS CONSTRUCTION OF ARESCOM GRANDSTAND, CAMP RIEGO DE DIOS, T | Region IV-A | Cavite 1st DEO | Completed | ₱11.8M | 100% | High risk71 | —-0.071 |
| 21DF0213ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0037 + 486.9 - K0038 + 700 | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 21DF0037LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG II, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG I, | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk69 | —-0.043 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 20DF0058LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE FACILITIES, CONST. OF MULTI-PURPOSE BUILDING BRGY. MAHABANG KAHOY CERCA, INDANG, CAVITE; REHAB. OF MULTIPURPOSE BLDG. GOV. DRIVE, BRGY. SAN AGUSTIN, TRECE MARTIRES CI | Region IV-A | Cavite 1st DEO | Completed | ₱14.9M | 100% | High risk68 | —-0.042 |
| 19DF0085LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS -CONCRETING OF ROADS, BUCANDALA-CARSADANG BAGO, BARANGAY BUCANDALA, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱24.7M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 24DF0306CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING (PHASE 2) AT BARANGAY SANTOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | Medium risk48 | Flagged0.028 |
| 24DF0308CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG AT BRGY AMAYA I, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 31% | Medium risk55 | Flagged0.023 |
| 24DF0305CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING AT BARANGAY AMAYA 5, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 100% | High risk64 | Flagged0.017 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 23DF0208CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF ROAD W/ DRAINAGE & BR.CONNECTING BRGY MAHARLIKA & ANABU | Region IV-A | Cavite 1st DEO | Completed | ₱28.7M | 100% | Medium risk52 | Flagged0.006 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 17DQ0090PROPOSED CONSTRUCTION OF (2) STOREY (8) CLASSROOM AT SENIOR HIGH SCHOOL IN SAN NICOLAS LLL, BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱19.8M | 100% | Medium risk43 | —-0.031 |
| 227 | 21DG0072CONC. OF BRGY. SAPANG 2 FMR, BRGY. SAPANG 2, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | Terminated | ₱4.8M | 100% | Medium risk42 | —-0.021 |
| 228 | 18DG0076CONC. OF SITIO BUNTOG BRGY. DALUSAG FMR, BRGY. DALUSAG, GEN. E. AGUINALDO, CAVITE; 18DG0076 | Region IV-A | Cavite 2nd DEO | Completed | ₱8.5M | 100% | Medium risk42 | —-0.051 |
| 229 | 19DG0070CONCRETING OF PATUTONG MALAKI NORTH FMR, BRGY. PATUTONG MALAKI NORTH, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱4.7M | 100% | Medium risk38 | —-0.052 |
| 230 | 23CD0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, MATICTIC SECTION (RIGHT SIDE), NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱86.8M | 100% | Medium risk37 | —-0.083 |
| 231 | 23C00190CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, SAN MIGUEL, BUL | Region III | Region III | Completed | ₱82M | 100% | Medium risk36 | —-0.085 |
| 232 | 22DF0149CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIESCONCRETING OF DRAINAGE SYSTEM AT BARANGAY POBLACION, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱4.7M | 100% | Medium risk33 | —-0.087 |
| 233 | 17DQ0045LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - WATER MANAGEMENT - WATER SUPPLY - INSTALLATION OF WATER SUPPLY, LALAAN II, SILANG, CAVITE; 5TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱1.9M | 100% | Low risk29 | —-0.047 |
| 234 | 16DG0071IMP/REHAB OF DRAINAGE ALONG TAG-BATS VIA TUY RD LEADING TO BRGY. NEOGAN,K0064+010-K0064+096,TAG CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱1.7M | 100% | Low risk27 | —-0.072 |
| 235 | 17DG0011MFO1-TERTIARY ALONG TAG-LAG VIA CALAMBA RD,K0063+425-K0063+506,TAGAYTAY CITY;7TH LD | Region IV-A | Cavite 2nd DEO | Completed | ₱1.2M | 100% | Low risk27 | —-0.072 |
| 236 | 18DG0036LIP-CONST OF MULTI PURPOSE COVERED COURT, BUNA LEJOS II, INDANG, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.2M | 100% | Low risk26 | —-0.104 |
| 237 | 17DG0032MFO1-REHAB/RECON OF NAT'L ROADS W/SLIPS,SLOPE COLLAPSE&LANDSLIDES-SECONDARY ALONG TAG-TALISAY RD,TAG | Region IV-A | Cavite 2nd DEO | Completed | ₱1.8M | 100% | Low risk26 | —-0.072 |
| 238 | 17DQ0040LOCALLY FUNDED PROJECT - LOCAL INFRASTRUCTURE PROGRAM (LIP) - FLOOD CONTROL AND DRAINAGE - DRAINAGE / PROTECTION WORKS - REHABILITATION OF DRAINAGE SYSTEM, IPIL II, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱1.4M | 100% | Low risk26 | —-0.054 |
| 239 | 18DG0011LIP-MULTI PURPOSE/FACILITIES, CONST OF COVERED COURT, BRGY. TAMBO ILAYA, INDANG, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.2M | 100% | Low risk26 | —-0.102 |
| 240 | 20DG0019CONST. OF MULTI-PURPOSE BLDG. - CONST. OF MULTI-PURPOSE BLDG., BRGY. BUCAL 4B, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.5M | 100% | Low risk26 | —-0.104 |
| 241 | 19DG0042CONST OF MPB (BARANGAY HALL), BRGY. BUCAL 4-B, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱3.3M | 100% | Low risk26 | —-0.104 |
| 242 | 18DG0028LIP-CONST OF MULTI PURPOSE COVERED COURT, BRGY. GARITA B, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.2M | 100% | Low risk26 | —-0.103 |
| 243 | 19DG0041CONST OF MPB (BARANGAY HALL), BRGY. BUCAL 3A, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱3.3M | 100% | Low risk26 | —-0.104 |
| 244 | 20DG0033CONST. OF MULTI-PURPOSE BRGY. HALL, BRGY. KAYTITINGA 3, ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.2M | 100% | Low risk26 | —-0.103 |
| 245 | 18DG0012LIP-MULTI PURPOSE/FACILITIES, CONST OF COVERED COURT, BRGY. URDANETA E/S, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.2M | 100% | Low risk26 | —-0.104 |
| 246 | 20DG0028CONST. OF MULTI-PURPOSE BRGY. HALL, BRGY. PINAGSANHAN A, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱3.3M | 100% | Low risk26 | —-0.097 |
| 247 | 20DF0091LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, CONSTRUCTION (COMPLETION) OF ROAD WITH DRAINAGE INSTALLATION, BRGY. PASONG BUAYA I, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱4.5M | 100% | Low risk26 | —-0.086 |
| 248 | 18DG0039LIP- CONST. OF MULTI-PURPOSE COVERED COURT, BENDITA NHS, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.2M | 100% | Low risk25 | —-0.104 |
| 249 | 20DG0036CONSTRUCTION OF MULTI-PURPOSE BRGY. HALL, BRGY. PINAGSANHAN B, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱3M | 100% | Low risk25 | —-0.099 |
| 250 | 20DQ0147LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES- MULTI-PURPOSE /FACILITIES - CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, SAN PABLO, BRGY. 1, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱3M | 100% | Low risk25 | —-0.103 |