Opening the dossier…
Opening the dossier…
Contractor dossier
258 projects on file, including joint ventures this contractor is part of.
Total projects
258
Total budget
₱8.4B
Average progress
95.5%
Completion rate
84.1%
Average risk score
49.2
Medium risk on average, out of 100
Flagged as unusual
9
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 251 | ₱7.9B | 49.2 | 9 | 95.7% |
| Region III | 5 | ₱453.8M | 50.3 | 0 | 100.0% |
| Region IV-B | 1 | ₱63.5M | 48.2 | 0 | 5.6% |
| National Capital Region | 1 | ₱39.2M | 47.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 92 | ₱2.9B | 48.4 | 0 | 95.3% |
| Buildings and Facilities | 87 | ₱1.7B | 46.8 | 1 | 96.9% |
| Flood Control and Drainage | 56 | ₱3.1B | 52.4 | 4 | 94.1% |
| OTHER | 9 | ₱172.5M | 68.0 | 3 | 88.9% |
| Bridges | 8 | ₱341.3M | 48.3 | 1 | 100.0% |
| Water Provision and Storage | 5 | ₱35.2M | 28.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 90.8 | 0 | 60.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DG0015CONST. OF BREAKWATER, BRGY. BUCANA SASAHAN, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱47.8M | 60% | High risk91 | —-0.022 |
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 24DF0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG IMUS RIVER,SEGMENT 2 | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 100% | High risk79 | —-0.020 |
| 24DF0074ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG CAÑAS RIVER, BARANGAY PARADAHAN II, PHASE III,TANZA | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.004 |
| 24DF0282CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST (COMPLETION) OF MULTI-PURPOSE BUILDING (DAMBANA NG PAMBANSANG WATAWAT), BARANGAY ALAPAN II-B, CITY OF IMUS, | Region IV-A | Cavite 1st DEO | On-Going | ₱59.4M | 38% | High risk76 | —-0.014 |
| 24DF0166CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG, BRGY CALUMPANG CERCA, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 86% | High risk75 | —-0.027 |
| 24DF0119CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (MULTI-PURPOSE HALL PHASE 2) AT BARANGAY CALUMPANG LEJOS, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 100% | High risk75 | —-0.035 |
| 25DF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROG CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER BRGY. BAYAN LUMA IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱71.7M | 74% | High risk74 | —-0.017 |
| 22DF0283CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)CONSTRUCTION OF ARESCOM MULTI-PURPOSE BUILDING (MOTORPO | Region IV-A | Cavite 1st DEO | Completed | ₱7.8M | 100% | High risk72 | —-0.073 |
| 22DF0326CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKASCONSTRUCTION OF ARMY ROTC CENTER AND MUSEUM - CAMP RIEGO | Region IV-A | Cavite 1st DEO | Completed | ₱29.7M | 100% | High risk72 | —-0.072 |
| 24DF0068CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANABU IB, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.9M | 92% | High risk72 | —-0.029 |
| 22DF0319CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS CONSTRUCTION OF ARESCOM GRANDSTAND, CAMP RIEGO DE DIOS, T | Region IV-A | Cavite 1st DEO | Completed | ₱11.8M | 100% | High risk71 | —-0.071 |
| 21DF0213ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0037 + 486.9 - K0038 + 700 | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 21DF0037LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG II, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG I, | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk69 | —-0.043 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 20DF0058LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE FACILITIES, CONST. OF MULTI-PURPOSE BUILDING BRGY. MAHABANG KAHOY CERCA, INDANG, CAVITE; REHAB. OF MULTIPURPOSE BLDG. GOV. DRIVE, BRGY. SAN AGUSTIN, TRECE MARTIRES CI | Region IV-A | Cavite 1st DEO | Completed | ₱14.9M | 100% | High risk68 | —-0.042 |
| 19DF0085LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS -CONCRETING OF ROADS, BUCANDALA-CARSADANG BAGO, BARANGAY BUCANDALA, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱24.7M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 24DF0306CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING (PHASE 2) AT BARANGAY SANTOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | Medium risk48 | Flagged0.028 |
| 24DF0308CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG AT BRGY AMAYA I, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 31% | Medium risk55 | Flagged0.023 |
| 24DF0305CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING AT BARANGAY AMAYA 5, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 100% | High risk64 | Flagged0.017 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 23DF0208CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF ROAD W/ DRAINAGE & BR.CONNECTING BRGY MAHARLIKA & ANABU | Region IV-A | Cavite 1st DEO | Completed | ₱28.7M | 100% | Medium risk52 | Flagged0.006 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22DF0030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVER, BRGY, MALAGASANG I-F, WEST S | Region IV-A | Cavite 1st DEO | Completed | ₱90.7M | 100% | Medium risk55 | —-0.079 |
| 52 | 22DQ0055ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGES - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - BANALO BR. (B04893LZ) ALONG GEN EVANGELISTA RD AND BINAKAYAN BR. (B02889LZ) ALONG MANILA-CAVITE (NCR BDRY-JCT CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱63.7M | 100% | Medium risk55 | —-0.060 |
| 53 | 19DF0131CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT AGUINALDO ES, KAWIT, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱62.3M | 100% | Medium risk55 | —-0.042 |
| 54 | 24DF0308CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG AT BRGY AMAYA I, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 31% | Medium risk55 | Flagged0.023 |
| 55 | 18DQ0128CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOL BUILDING AT HABAY ELEMENTARY SCHOOL, BACOOR CITY,CAVITE | Region IV-A | Region IV-A | Completed | ₱65M | 100% | Medium risk55 | —-0.042 |
| 56 | 21DG0014CONST .OF CONCRETE BRIDGE - GEN. AGUINALDO-MAGALLANES-NASUGBU RD. (EAST-WEST RD), PACKAGE 2, GEN. A, | Region IV-A | Cavite 2nd DEO | Completed | ₱77.2M | 100% | Medium risk55 | —-0.055 |
| 57 | 24DQ0022CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD CONNECTING MUSEO DE BACOOR IN POBLACION TO SINBANALI (FORMERLY SINEGUELASAN, BANALO AND ALIMA) FISH PORT AND MANG | Region IV-A | Cavite 3rd DEO | On-Going | ₱77.2M | 100% | Medium risk54 | —-0.064 |
| 58 | 22DF0007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0058+500 - K0059+000 | Region IV-A | Cavite 1st DEO | Completed | ₱86.1M | 100% | Medium risk54 | —-0.098 |
| 59 | 20DG0012CONST. OF CONC. BRIDGE-BALIWAG BRIDGE-GEN. AGUINALDO-MAGALLANES-NASUGBU RD (EAST-WEST ROAD) MAGALLAN | Region IV-A | Cavite 2nd DEO | Completed | ₱77.2M | 100% | Medium risk54 | —-0.057 |
| 60 | 17DF0141CONSTRUCTION OF 4STY 16CL AND 4STY 20CL SCHOOL BUILDING AT TANZA NATIONAL TRADE SCHOOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱78.3M | 100% | Medium risk54 | —-0.017 |
| 61 | 23DG0063REHAB OF CONCRETRE ROAD @ BULALONG MATANDA ROAD, IRUHIN EAST, TAGAYTAY CITY, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱84.1M | 100% | Medium risk54 | —-0.097 |
| 62 | 22DG0023CONST OF CONCRETE ROAD-MARAGONDON-BYPASS ROAD (PHASE I), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱70.4M | 100% | Medium risk54 | —-0.086 |
| 63 | 20DF0087ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS NOVELETA-NAIC-TAGAYTAY ROAD (S06093LZ), K0033+725 - K0033+861, K0 | Region IV-A | Cavite 1st DEO | Completed | ₱57M | 100% | Medium risk54 | —-0.100 |
| 64 | 22DQ0002ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIVE | Region IV-A | Cavite 3rd DEO | Completed | ₱67.2M | 100% | Medium risk52 | —-0.083 |
| 65 | 23DF0208CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF ROAD W/ DRAINAGE & BR.CONNECTING BRGY MAHARLIKA & ANABU | Region IV-A | Cavite 1st DEO | Completed | ₱28.7M | 100% | Medium risk52 | Flagged0.006 |
| 66 | 25DI0079CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY NUEVA, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk52 | —-0.073 |
| 67 | 23DG0012CONST OF PARALLEL BRIDGE-TIMALAN PARALLEL ALONG NOV-NAIC-TAG ROAD | Region IV-A | Cavite 2nd DEO | Completed | ₱50.2M | 100% | Medium risk51 | —-0.058 |
| 68 | 22DF0216ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSCARSADANG BAGO - MALAGASANG DIVERSION ROAD, MALAGASANG SECTION, SEGMENT 2, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱50.7M | 100% | Medium risk51 | —-0.047 |
| 69 | 22DG0042CONST OF CONCRETE ROAD - CONST OF ROAD CONNECTING SVD ROAD | Region IV-A | Cavite 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.099 |
| 70 | 23DG0007ROAD WIDENING-JUANITO R. REMULLA, SR. RD-K0054+000-K0055+025 | Region IV-A | Cavite 2nd DEO | Completed | ₱49.4M | 100% | Medium risk51 | —-0.102 |
| 71 | 22DF0059CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF DON PLACIDO CAMPOS AVE. BAR | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.103 |
| 72 | 22DF0107CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF ANABU - PATINDIG ARAW BYPAS | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 73 | 22DF0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF NIA ROAD, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 74 | 24DG0086CONST OF CONC ROAD-CONST OF ROAD, BRGY MALAINEN BAGO-BRGY MALAINEN LUMA,NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱49.4M | 75% | Medium risk51 | —-0.054 |
| 75 | 23DG0062CONST OF CONC ROAD-CONST OF ROAD FROM BRGY MALAINEN BAGO-BRGY MALAINEN LUMA, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.101 |