Opening the dossier…
Opening the dossier…
Contractor dossier
258 projects on file, including joint ventures this contractor is part of.
Total projects
258
Total budget
₱8.4B
Average progress
95.5%
Completion rate
84.1%
Average risk score
49.2
Medium risk on average, out of 100
Flagged as unusual
9
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 251 | ₱7.9B | 49.2 | 9 | 95.7% |
| Region III | 5 | ₱453.8M | 50.3 | 0 | 100.0% |
| Region IV-B | 1 | ₱63.5M | 48.2 | 0 | 5.6% |
| National Capital Region | 1 | ₱39.2M | 47.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 92 | ₱2.9B | 48.4 | 0 | 95.3% |
| Buildings and Facilities | 87 | ₱1.7B | 46.8 | 1 | 96.9% |
| Flood Control and Drainage | 56 | ₱3.1B | 52.4 | 4 | 94.1% |
| OTHER | 9 | ₱172.5M | 68.0 | 3 | 88.9% |
| Bridges | 8 | ₱341.3M | 48.3 | 1 | 100.0% |
| Water Provision and Storage | 5 | ₱35.2M | 28.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 90.8 | 0 | 60.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DG0015CONST. OF BREAKWATER, BRGY. BUCANA SASAHAN, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱47.8M | 60% | High risk91 | —-0.022 |
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 24DF0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG IMUS RIVER,SEGMENT 2 | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 100% | High risk79 | —-0.020 |
| 24DF0074ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG CAÑAS RIVER, BARANGAY PARADAHAN II, PHASE III,TANZA | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.004 |
| 24DF0282CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST (COMPLETION) OF MULTI-PURPOSE BUILDING (DAMBANA NG PAMBANSANG WATAWAT), BARANGAY ALAPAN II-B, CITY OF IMUS, | Region IV-A | Cavite 1st DEO | On-Going | ₱59.4M | 38% | High risk76 | —-0.014 |
| 24DF0166CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG, BRGY CALUMPANG CERCA, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 86% | High risk75 | —-0.027 |
| 24DF0119CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (MULTI-PURPOSE HALL PHASE 2) AT BARANGAY CALUMPANG LEJOS, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 100% | High risk75 | —-0.035 |
| 25DF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROG CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER BRGY. BAYAN LUMA IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱71.7M | 74% | High risk74 | —-0.017 |
| 22DF0283CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)CONSTRUCTION OF ARESCOM MULTI-PURPOSE BUILDING (MOTORPO | Region IV-A | Cavite 1st DEO | Completed | ₱7.8M | 100% | High risk72 | —-0.073 |
| 22DF0326CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKASCONSTRUCTION OF ARMY ROTC CENTER AND MUSEUM - CAMP RIEGO | Region IV-A | Cavite 1st DEO | Completed | ₱29.7M | 100% | High risk72 | —-0.072 |
| 24DF0068CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANABU IB, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.9M | 92% | High risk72 | —-0.029 |
| 22DF0319CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS CONSTRUCTION OF ARESCOM GRANDSTAND, CAMP RIEGO DE DIOS, T | Region IV-A | Cavite 1st DEO | Completed | ₱11.8M | 100% | High risk71 | —-0.071 |
| 21DF0213ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0037 + 486.9 - K0038 + 700 | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 21DF0037LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG II, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG I, | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk69 | —-0.043 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 20DF0058LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE FACILITIES, CONST. OF MULTI-PURPOSE BUILDING BRGY. MAHABANG KAHOY CERCA, INDANG, CAVITE; REHAB. OF MULTIPURPOSE BLDG. GOV. DRIVE, BRGY. SAN AGUSTIN, TRECE MARTIRES CI | Region IV-A | Cavite 1st DEO | Completed | ₱14.9M | 100% | High risk68 | —-0.042 |
| 19DF0085LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS -CONCRETING OF ROADS, BUCANDALA-CARSADANG BAGO, BARANGAY BUCANDALA, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱24.7M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 24DF0306CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING (PHASE 2) AT BARANGAY SANTOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | Medium risk48 | Flagged0.028 |
| 24DF0308CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG AT BRGY AMAYA I, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 31% | Medium risk55 | Flagged0.023 |
| 24DF0305CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING AT BARANGAY AMAYA 5, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 100% | High risk64 | Flagged0.017 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 23DF0208CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF ROAD W/ DRAINAGE & BR.CONNECTING BRGY MAHARLIKA & ANABU | Region IV-A | Cavite 1st DEO | Completed | ₱28.7M | 100% | Medium risk52 | Flagged0.006 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24DG0042ROAD WIDENING-MAR-MAG-AMUYONG RD-K0065+000-K00695+547 | Region IV-A | Cavite 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.106 |
| 152 | 22DF0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN ROAD, K0061+163 - K0061+400 | Region IV-A | Cavite 1st DEO | Completed | ₱40.5M | 100% | Medium risk47 | —-0.104 |
| 153 | 21DG0006CONST OF CONCRETE ROAD - MARAGONDON BYPASS ROAD | Region IV-A | Cavite 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.090 |
| 154 | 22DG0018ROAD WIDENING-JUANITO P. REMULLA, SR. RD-K0050+340-K0051+100 | Region IV-A | Cavite 2nd DEO | Completed | ₱37.1M | 100% | Medium risk47 | —-0.092 |
| 155 | 23DG0001REHAB OF PAVED ROAD-JUANITO P REMULLA, SR RD-K0052+047-K0052+884; | Region IV-A | Cavite 2nd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.104 |
| 156 | 22DG0024CONST OF CONCRETE ROAD-MARAGONDON BYPASS ROAD(PHASE II), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱37.8M | 100% | Medium risk47 | —-0.104 |
| 157 | 19DG0015ROAD WIDENING ALONG MARAGONDON-MAGALLANES-AMUYONG ROAD (SO1776LZ) K0063+000-K0063+965 MARAGONDON,CAV | Region IV-A | Cavite 2nd DEO | Completed | ₱41.7M | 100% | Medium risk47 | —-0.106 |
| 158 | 19DG0010CONST OF GRAVEL ROAD-MARAGONDON BYPASS ROAD, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱30.3M | 100% | Medium risk47 | —-0.106 |
| 159 | 22DF0073ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSMANILA-CAVITE RD - K0027+383 - K0028+173 | Region IV-A | Cavite 1st DEO | Completed | ₱34.8M | 100% | Medium risk47 | —-0.104 |
| 160 | 20DQ0010ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, BRGY. CABILANG B | Region IV-A | Cavite 3rd DEO | Completed | ₱36.7M | 100% | Medium risk47 | —-0.087 |
| 161 | 20DG0053CONST OF FOUR (4) STOREY-EIGHT (8) CLASSROOM SCHOOL BLDG @ BALIWAG ELEM SCHOOL, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱32.1M | 100% | Medium risk47 | —-0.050 |
| 162 | 19DQ0011ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG BALUCTOT RIVER, PHASE IV, EAST SIDE, | Region IV-A | Region IV-A | Completed | ₱46.3M | 100% | Medium risk47 | —-0.084 |
| 163 | 17DF0150CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT BAGBAG NHS, ROSARIO | Region IV-A | Cavite 1st DEO | Completed | ₱41.6M | 100% | Medium risk47 | —-0.023 |
| 164 | 18DQ0050LOCAL PROGRAM CONSTRUCTION/ REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS FLOOD CONTROL AND DRAINAGE DRAINAGE/ PROTECTION WORKS EXPANSION OF ROAD WITH BOX CULVERT, PNPA FACILITIES AT CAMP GEN. MARIANO N. CAS | Region IV-A | Region IV-A | Completed | ₱15.6M | 100% | Medium risk47 | —-0.089 |
| 165 | 20DF0064ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, BRGY. SANTOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.087 |
| 166 | 25DG0007ROAD WIDENING-SECONDARY RDS.-JUANITO R, REMULLA, SR. RD - K0053+000-K0053+497 | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.5M | 87% | Medium risk47 | —-0.070 |
| 167 | 24DG0041ROAD WIDENING-JUANITO R. REMULLA, SR. ROAD-K0051+379-K0052+040 | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.5M | 84% | Medium risk47 | —-0.058 |
| 168 | 20DG0002CONST. OF SLOPE PROTECTION STRUCTURE - ALONG - TAGAYTAY-TAAL LAKE R. - K0062+771 - K0062+802 | Region IV-A | Cavite 2nd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.107 |
| 169 | 18DG0003RETROFITTING/STRENGHTHENING OF PERM BRIDGES - CAPUTATAN BR. (B04544LZ), MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱5.3M | 100% | Medium risk47 | —-0.064 |
| 170 | 19DF0043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, CAVITE-BATANGAS ROAD, K0019+076 - K0019+413, K0019+717 - K0019+8 | Region IV-A | Cavite 1st DEO | Completed | ₱18.9M | 100% | Medium risk46 | —-0.106 |
| 171 | 18DF0027ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS;FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BRGY. A | Region IV-A | Cavite 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.086 |
| 172 | 20DF0001ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱30.7M | 100% | Medium risk46 | —-0.087 |
| 173 | 22DF0290CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF PUNTA - OPEN CANA | Region IV-A | Cavite 1st DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.108 |
| 174 | 18DQ0132CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT SALINAS ELEMENTARY SCHOOL, BACOOR CITY, CAVITE | Region IV-A | Region IV-A | Completed | ₱23.9M | 100% | Medium risk46 | —-0.054 |
| 175 | 19DF0120LOCAL PROGRAM -CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS -CONSTRUCTION/CONCRETING OF BYPASS ROAD DAANG HARI TO PATINDIG ARAW SECTION LINKING TO AGUINALDO HIGHW | Region IV-A | Cavite 1st DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.107 |