Contractor dossier
258 projects on file, including joint ventures this contractor is part of.
Total projects
258
Total budget
₱8.4B
Average progress
95.5%
Completion rate
84.1%
Average risk score
49.2
Medium risk on average, out of 100
Flagged as unusual
9
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 251 | ₱7.9B | 49.2 | 9 | 95.7% |
| Region III | 5 | ₱453.8M | 50.3 | 0 | 100.0% |
| Region IV-B | 1 | ₱63.5M | 48.2 | 0 | 5.6% |
| National Capital Region | 1 | ₱39.2M | 47.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 92 | ₱2.9B | 48.4 | 0 | 95.3% |
| Buildings and Facilities | 87 | ₱1.7B | 46.8 | 1 | 96.9% |
| Flood Control and Drainage | 56 | ₱3.1B | 52.4 | 4 | 94.1% |
| OTHER | 9 | ₱172.5M | 68.0 | 3 | 88.9% |
| Bridges | 8 | ₱341.3M | 48.3 | 1 | 100.0% |
| Water Provision and Storage | 5 | ₱35.2M | 28.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 90.8 | 0 | 60.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DG0015CONST. OF BREAKWATER, BRGY. BUCANA SASAHAN, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱47.8M | 60% | High risk91 | —-0.022 |
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 24DF0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG IMUS RIVER,SEGMENT 2 | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 100% | High risk79 | —-0.020 |
| 24DF0074ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG CAÑAS RIVER, BARANGAY PARADAHAN II, PHASE III,TANZA | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.004 |
| 24DF0282CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST (COMPLETION) OF MULTI-PURPOSE BUILDING (DAMBANA NG PAMBANSANG WATAWAT), BARANGAY ALAPAN II-B, CITY OF IMUS, | Region IV-A | Cavite 1st DEO | On-Going | ₱59.4M | 38% | High risk76 | —-0.014 |
| 24DF0166CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG, BRGY CALUMPANG CERCA, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 86% | High risk75 | —-0.027 |
| 24DF0119CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (MULTI-PURPOSE HALL PHASE 2) AT BARANGAY CALUMPANG LEJOS, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 100% | High risk75 | —-0.035 |
| 25DF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROG CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER BRGY. BAYAN LUMA IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱71.7M | 74% | High risk74 | —-0.017 |
| 22DF0283CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)CONSTRUCTION OF ARESCOM MULTI-PURPOSE BUILDING (MOTORPO | Region IV-A | Cavite 1st DEO | Completed | ₱7.8M | 100% | High risk72 | —-0.073 |
| 22DF0326CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKASCONSTRUCTION OF ARMY ROTC CENTER AND MUSEUM - CAMP RIEGO | Region IV-A | Cavite 1st DEO | Completed | ₱29.7M | 100% | High risk72 | —-0.072 |
| 24DF0068CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANABU IB, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.9M | 92% | High risk72 | —-0.029 |
| 22DF0319CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS CONSTRUCTION OF ARESCOM GRANDSTAND, CAMP RIEGO DE DIOS, T | Region IV-A | Cavite 1st DEO | Completed | ₱11.8M | 100% | High risk71 | —-0.071 |
| 21DF0213ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0037 + 486.9 - K0038 + 700 | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 21DF0037LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG II, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT MALAGASANG I, | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk69 | —-0.043 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 20DF0058LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE FACILITIES, CONST. OF MULTI-PURPOSE BUILDING BRGY. MAHABANG KAHOY CERCA, INDANG, CAVITE; REHAB. OF MULTIPURPOSE BLDG. GOV. DRIVE, BRGY. SAN AGUSTIN, TRECE MARTIRES CI | Region IV-A | Cavite 1st DEO | Completed | ₱14.9M | 100% | High risk68 | —-0.042 |
| 19DF0085LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS -CONCRETING OF ROADS, BUCANDALA-CARSADANG BAGO, BARANGAY BUCANDALA, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱24.7M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 24DF0306CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING (PHASE 2) AT BARANGAY SANTOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | Medium risk48 | Flagged0.028 |
| 24DF0308CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG AT BRGY AMAYA I, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 31% | Medium risk55 | Flagged0.023 |
| 24DF0305CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIESCONSTRUCTION OF CANAL LINING AT BARANGAY AMAYA 5, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 100% | High risk64 | Flagged0.017 |
| 21DF0163LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF CITY HALL BUILDING, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 21DF0159LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT CITY HALL COMPOUND AT BARANGAY SAN AGUSTIN, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.9M | 100% | High risk68 | Flagged0.012 |
| 23DF0208CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF ROAD W/ DRAINAGE & BR.CONNECTING BRGY MAHARLIKA & ANABU | Region IV-A | Cavite 1st DEO | Completed | ₱28.7M | 100% | Medium risk52 | Flagged0.006 |
| 24DF0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.6M | 60% | High risk79 | Flagged0.004 |
| 25DF0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG JULIAN RIVE | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 0% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 22DF0188CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF ROAD AT BUCANDALA | Region IV-A | Cavite 1st DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.106 |
| 202 | 22DF0189CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF ROAD AT BUCANDALA | Region IV-A | Cavite 1st DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.106 |
| 203 | 20DF0175LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION (COMPLETION) OF ROADS AT BUCANDALA CARSADANG BAGO ROAD, IMUS | Region IV-A | Cavite 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.106 |
| 204 | 22DF0071ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMOFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0065+000 - K0066+330, K0066+430 - K0066+539 | Region IV-A | Cavite 1st DEO | Completed | ₱6.9M | 100% | Medium risk46 | —-0.103 |
| 205 | 17DF0109CONSTRUCTION OF 4STY 16CL SCHOOL BUILDING AT TANZA NATIONAL TRADE SCHOOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱36.9M | 100% | Medium risk46 | —-0.026 |
| 206 | 17DF0122CONSTRUCTION OF 4STY 16CL SCHOOL BUILDING AT TANZA NATIONAL TRADE SCHOOL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱36.9M | 100% | Medium risk46 | —-0.026 |
| 207 | 21DF0178ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLENATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSTANZA - TRECE MARTIRES CITY - INDANG RD, K0045+000 - K0045+223 | Region IV-A | Cavite 1st DEO | Completed | ₱7.3M | 100% | Medium risk46 | —-0.101 |
| 208 | 22DF0125CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONCRETING OF ROAD AT BARANGAY CALUMPANG CERCA, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.105 |
| 209 | 16DF0207CONSTRUCTION OF CLASSROOMS - CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT LUIS Y. FERRER, JR. NORTH NATIONAL HIGH SCHOOL, GEN. TRIAS | Region IV-A | Cavite 1st DEO | Completed | ₱21.5M | 100% | Medium risk46 | —-0.028 |
| 210 | 20DF0046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, PRIMARY ROAD, INDANG-ALFONSO VIA LUKSUHIN RD. - K0056+311.7 - K0056+582 | Region IV-A | Cavite 1st DEO | Completed | ₱5.7M | 100% | Medium risk46 | —-0.102 |
| 211 | 18DG0077CONC. OF SITIO BUBUYAN BRGY. DALUSAG FMR, BRGY. DALUSAG, GEN. E. AGUINALDO, CAVITE; 18DG0077 | Region IV-A | Cavite 2nd DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.050 |
| 212 | 24DG0018RECONST TO CONC PAVEMENT-MAR-MAG-AMUYONG RD-K0058+407-K0058+834 | Region IV-A | Cavite 2nd DEO | On-Going | ₱10.4M | 92% | Medium risk46 | —-0.061 |
| 213 | 22DG0019ROAD WIDENING-JUANITO R. REMULLA SR. RD-K0052+830-K0052+900 | Region IV-A | Cavite 2nd DEO | Completed | ₱6.6M | 100% | Medium risk46 | —-0.097 |
| 214 | 23DG0009CONSTRUCTION OF CONCRETE ROAD-MAR BYPASS ROAD, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.107 |
| 215 | 19DG0053CONC OF ROAD W/ SLOPE PROTECTION, BRGY. URDANETA, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱9.4M | 100% | Medium risk45 | —-0.107 |
| 216 | 17DQ0099PROPOSED CONSTRUCTION OF (4) STOREY (12) CLASSROOM AT SENIOR HIGH SCHOOL IN DULONG BAYAN, BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱36.4M | 100% | Medium risk45 | —-0.026 |
| 217 | 17DQ0116CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOLBUILDING AT DULONG BAYAN ELEMENTARY SCHOOL, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱36.4M | 100% | Medium risk45 | —-0.026 |
| 218 | 20DF0209CONSTRUCTION/REPAIR/REHAB OF MULTI-PURPOSE BUILDING AT MEDICION II, IMUS; CONSTRUCTION/REPAIR/REHAB OF MULTI-PURPOSE BUILDING (COVERED COURT) AT PINAGBUKLOD, IMUS AND CONSTRUCTION/REPAIR/REHAB OF MULTI-PURPOSE BUILDING (COVERED COURT) AT POBLACION IV-C, I | Region IV-A | Cavite 1st DEO | Completed | ₱14.5M | 100% | Medium risk45 | —-0.032 |
| 219 | 23DG0084CONST OF TWO(2) STOREY-FOUR(4) CL SB @ DAO E/S, GEN EMILIO AGUINALDO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱17.5M | 100% | Medium risk45 | —-0.055 |
| 220 | 18DF0132CONSTRUCTION OF 2STY 4CL SCHOOL BUILDING AT SAN JUAN ELEMENTARY SCHOOL,NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9M | 100% | Medium risk45 | —-0.058 |
| 221 | 17DQ0089PROPOSED CONSTRUCTION OF (2) STOREY (8) CLASSROOM AT SENIOR HIGH SCHOOL IN DULONG BAYAN, BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱19.8M | 100% | Medium risk45 | —-0.030 |
| 222 | 17DF0121CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT ANABU I ES, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱31.8M | 100% | Medium risk45 | —-0.027 |
| 223 | 17DQ0133CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOL BUILDING AT BACOOR NHS-MOLINO MAIN, BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱40.5M | 100% | Medium risk44 | —-0.025 |
| 224 | 17DF0149COMPLETION OF 4STY 12CL SCHOOL BUILDING AT BAYANAN ES; 4STY 16CL AND 3STY 6CL SCHOOL BUILDING AT BACOOR ES; 4STY 8CL SCHOOL BUILDING AT POBLACION ES (BACOOR ANNEX); 4STY 16CL SCHOOL BUILDING AT HABAY ES; 4STY 20CL SCHOOL BUILDINGAT QUEENSROW ES; AND 4ST | Region IV-A | Cavite 1st DEO | Completed | ₱38.3M | 100% | Medium risk44 | —-0.023 |
| 225 | 17DQ0104CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOLBUILDING AT SENIOR HIGH SCHOOL IN SAN NICOLAS LLL, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱36.1M | 100% | Medium risk43 | —-0.027 |