Opening the dossier…
Opening the dossier…
Contractor dossier
168 projects on file, including joint ventures this contractor is part of.
Total projects
168
Total budget
₱6.2B
Average progress
95.1%
Completion rate
88.1%
Average risk score
46.4
Medium risk on average, out of 100
Flagged as unusual
5
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 168 | ₱6.2B | 46.4 | 5 | 95.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 81 | ₱2.4B | 43.5 | 0 | 97.3% |
| Buildings and Facilities | 34 | ₱924.4M | 35.9 | 0 | 92.1% |
| Flood Control and Drainage | 19 | ₱836.3M | 47.3 | 0 | 96.8% |
| Bridges | 17 | ₱1B | 56.0 | 1 | 93.2% |
| OTHER | 13 | ₱611.2M | 69.6 | 2 | 98.1% |
| GAA 2025 SSP | 2 | ₱173.7M | 95.2 | 2 | 32.7% |
| Bridges, Roads | 1 | ₱182.5M | 67.8 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3M | 43.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 25DP0081CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (PAMANTASAN NG LUNGSOD NG SAN PABLO), BRGY SAN JOSE, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱96.5M | 0% | High risk95 | Flagged0.030 |
| 23DC0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN SEBASTIAN, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱99M | 75% | High risk74 | Flagged0.015 |
| 23DD0264CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD INCLUDING DRAINAGE, BRGY. POBLACION AND BRGY | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 100% | High risk73 | Flagged0.004 |
| 25DP0053CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY DEL REMEDIO, SAN PABLO CITY, LAGUNA (PHASE 1) | Region IV-A | Laguna 3rd DEO | On-Going | ₱33.8M | 0% | High risk72 | —-0.009 |
| 19DD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - OFF - CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ROSARIO - SN JUAN RD - K0138 + 299 - K0140 + 381 | Region IV-A | Batangas 4th DEO | Completed | ₱65.5M | 100% | High risk71 | —-0.040 |
| 20DD0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0122+236 - K0123+800 | Region IV-A | Batangas 4th DEO | Completed | ₱61.8M | 100% | High risk70 | —-0.039 |
| 17DC0006MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, P | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | High risk70 | —-0.041 |
| 17DD0010OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, LIPA-ROSARIO ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱22.5M | 100% | High risk69 | —-0.043 |
| 20DC0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA CITY-ALAMINOS RD | Region IV-A | Batangas 3rd DEO | Completed | ₱43.1M | 100% | High risk69 | —-0.043 |
| 17DD0017OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, BANAY-BANAY-MOJON CUENCA ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱23.5M | 100% | High risk69 | —-0.043 |
| 17DC0035MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, | Region IV-A | Batangas 3rd DEO | Completed | ₱6.5M | 100% | High risk69 | —-0.040 |
| 17DC0034MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, | Region IV-A | Batangas 3rd DEO | Completed | ₱6.6M | 100% | High risk69 | —-0.043 |
| 19DC0013ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱66.6M | 100% | High risk68 | —-0.035 |
| 18D00027ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONST. OF BY-PASS & DIVERSION ROADS, ALAMINOS-SAN PABLO CITY BY-PASS ROAD, INCL. ROW AND BRIDGE, LAGUNA | Region IV-A | Region IV-A | Completed | ₱182.5M | 100% | High risk68 | —-0.037 |
| 18DC0127CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | High risk68 | —-0.023 |
| 18DC0089ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk67 | —-0.019 |
| 20DC0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, DINGIN ROAD LEADING TO BINUKALAN SHRINE, POBLACION WEST, ALITAGTAG, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱34M | 100% | High risk67 | —-0.042 |
| 17DC0001MFO-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADS, CONSTRUCTION/UPGRADING/P | Region IV-A | Batangas 3rd DEO | Completed | ₱9.4M | 100% | High risk66 | —-0.075 |
| 25D00150CONSTRUCTION OF MULTI-PURPOSE BUILDING, ROSARIO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱194.1M | 0% | High risk64 | —-0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0081CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (PAMANTASAN NG LUNGSOD NG SAN PABLO), BRGY SAN JOSE, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱96.5M | 0% | High risk95 | Flagged0.030 |
| 23DC0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN SEBASTIAN, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱99M | 75% | High risk74 | Flagged0.015 |
| 23DE0140OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BATANGAS CITY-SAN PASCUAL-BAUAN DIVERSION ROAD, PACKAGE J, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 0% | High risk63 | Flagged0.013 |
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 23DD0264CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD INCLUDING DRAINAGE, BRGY. POBLACION AND BRGY | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 100% | High risk73 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 2 | 25DP0081CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (PAMANTASAN NG LUNGSOD NG SAN PABLO), BRGY SAN JOSE, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱96.5M | 0% | High risk95 | Flagged0.030 |
| 3 | 23DC0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN SEBASTIAN, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱99M | 75% | High risk74 | Flagged0.015 |
| 4 | 23DD0264CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD INCLUDING DRAINAGE, BRGY. POBLACION AND BRGY | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 100% | High risk73 | Flagged0.004 |
| 5 | 25DP0053CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY DEL REMEDIO, SAN PABLO CITY, LAGUNA (PHASE 1) | Region IV-A | Laguna 3rd DEO | On-Going | ₱33.8M | 0% | High risk72 | —-0.009 |
| 6 | 19DD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - OFF - CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ROSARIO - SN JUAN RD - K0138 + 299 - K0140 + 381 | Region IV-A | Batangas 4th DEO | Completed | ₱65.5M | 100% | High risk71 | —-0.040 |
| 7 | 20DD0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0122+236 - K0123+800 | Region IV-A | Batangas 4th DEO | Completed | ₱61.8M | 100% | High risk70 | —-0.039 |
| 8 | 17DC0006MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, P | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | High risk70 | —-0.041 |
| 9 | 17DD0010OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, LIPA-ROSARIO ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱22.5M | 100% | High risk69 | —-0.043 |
| 10 | 20DC0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA CITY-ALAMINOS RD | Region IV-A | Batangas 3rd DEO | Completed | ₱43.1M | 100% | High risk69 | —-0.043 |
| 11 | 17DD0017OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, BANAY-BANAY-MOJON CUENCA ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱23.5M | 100% | High risk69 | —-0.043 |
| 12 | 17DC0035MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, | Region IV-A | Batangas 3rd DEO | Completed | ₱6.5M | 100% | High risk69 | —-0.040 |
| 13 | 17DC0034MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, | Region IV-A | Batangas 3rd DEO | Completed | ₱6.6M | 100% | High risk69 | —-0.043 |
| 14 | 19DC0013ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱66.6M | 100% | High risk68 | —-0.035 |
| 15 | 18D00027ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONST. OF BY-PASS & DIVERSION ROADS, ALAMINOS-SAN PABLO CITY BY-PASS ROAD, INCL. ROW AND BRIDGE, LAGUNA | Region IV-A | Region IV-A | Completed | ₱182.5M | 100% | High risk68 | —-0.037 |
| 16 | 18DC0127CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | High risk68 | —-0.023 |
| 17 | 18DC0089ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk67 | —-0.019 |
| 18 | 20DC0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, DINGIN ROAD LEADING TO BINUKALAN SHRINE, POBLACION WEST, ALITAGTAG, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱34M | 100% | High risk67 | —-0.042 |
| 19 | 17DC0001MFO-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADS, CONSTRUCTION/UPGRADING/P | Region IV-A | Batangas 3rd DEO | Completed | ₱9.4M | 100% | High risk66 | —-0.075 |
| 20 | 25D00150CONSTRUCTION OF MULTI-PURPOSE BUILDING, ROSARIO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱194.1M | 0% | High risk64 | —-0.002 |
| 21 | 23DD0246CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE ALONG BARANGAY SAN BENITO-SAN ISIDRO ROAD IN | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk64 | —-0.055 |
| 22 | 23DD0226ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYA RIVE | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 23 | 24DM0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PIRIS RIVER, BUENAVISTA, PACKAGE 1, QUEZON, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.070 |
| 24 | 20D00038FY 2020 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADSALAMINOS SAN PABLO CITY BYPASS, PACKAGE D, LAGUNA | Region IV-A | Region IV-A | Completed | ₱107.6M | 100% | High risk64 | —-0.051 |
| 25 | 21D00064FY 2021 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALAMINOS - SAN PABLO BYPASS ROAD, PACKAGE E, LAGUNA | Region IV-A | Region IV-A | Completed | ₱105.9M | 100% | High risk63 | —-0.048 |