Contractor dossier
168 projects on file, including joint ventures this contractor is part of.
Total projects
168
Total budget
₱6.2B
Average progress
95.1%
Completion rate
88.1%
Average risk score
46.4
Medium risk on average, out of 100
Flagged as unusual
5
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 168 | ₱6.2B | 46.4 | 5 | 95.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 81 | ₱2.4B | 43.5 | 0 | 97.3% |
| Buildings and Facilities | 34 | ₱924.4M | 35.9 | 0 | 92.1% |
| Flood Control and Drainage | 19 | ₱836.3M | 47.3 | 0 | 96.8% |
| Bridges | 17 | ₱1B | 56.0 | 1 | 93.2% |
| OTHER | 13 | ₱611.2M | 69.6 | 2 | 98.1% |
| GAA 2025 SSP | 2 | ₱173.7M | 95.2 | 2 | 32.7% |
| Bridges, Roads | 1 | ₱182.5M | 67.8 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3M | 43.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 25DP0081CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (PAMANTASAN NG LUNGSOD NG SAN PABLO), BRGY SAN JOSE, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱96.5M | 0% | High risk95 | Flagged0.030 |
| 23DC0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN SEBASTIAN, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱99M | 75% | High risk74 | Flagged0.015 |
| 23DD0264CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD INCLUDING DRAINAGE, BRGY. POBLACION AND BRGY | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 100% | High risk73 | Flagged0.004 |
| 25DP0053CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY DEL REMEDIO, SAN PABLO CITY, LAGUNA (PHASE 1) | Region IV-A | Laguna 3rd DEO | On-Going | ₱33.8M | 0% | High risk72 | —-0.009 |
| 19DD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - OFF - CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ROSARIO - SN JUAN RD - K0138 + 299 - K0140 + 381 | Region IV-A | Batangas 4th DEO | Completed | ₱65.5M | 100% | High risk71 | —-0.040 |
| 20DD0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0122+236 - K0123+800 | Region IV-A | Batangas 4th DEO | Completed | ₱61.8M | 100% | High risk70 | —-0.039 |
| 17DC0006MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, P | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | High risk70 | —-0.041 |
| 17DD0010OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, LIPA-ROSARIO ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱22.5M | 100% | High risk69 | —-0.043 |
| 20DC0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA CITY-ALAMINOS RD | Region IV-A | Batangas 3rd DEO | Completed | ₱43.1M | 100% | High risk69 | —-0.043 |
| 17DD0017OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, BANAY-BANAY-MOJON CUENCA ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱23.5M | 100% | High risk69 | —-0.043 |
| 17DC0035MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, | Region IV-A | Batangas 3rd DEO | Completed | ₱6.5M | 100% | High risk69 | —-0.040 |
| 17DC0034MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, | Region IV-A | Batangas 3rd DEO | Completed | ₱6.6M | 100% | High risk69 | —-0.043 |
| 19DC0013ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱66.6M | 100% | High risk68 | —-0.035 |
| 18D00027ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONST. OF BY-PASS & DIVERSION ROADS, ALAMINOS-SAN PABLO CITY BY-PASS ROAD, INCL. ROW AND BRIDGE, LAGUNA | Region IV-A | Region IV-A | Completed | ₱182.5M | 100% | High risk68 | —-0.037 |
| 18DC0127CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | High risk68 | —-0.023 |
| 18DC0089ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk67 | —-0.019 |
| 20DC0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, DINGIN ROAD LEADING TO BINUKALAN SHRINE, POBLACION WEST, ALITAGTAG, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱34M | 100% | High risk67 | —-0.042 |
| 17DC0001MFO-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADS, CONSTRUCTION/UPGRADING/P | Region IV-A | Batangas 3rd DEO | Completed | ₱9.4M | 100% | High risk66 | —-0.075 |
| 25D00150CONSTRUCTION OF MULTI-PURPOSE BUILDING, ROSARIO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱194.1M | 0% | High risk64 | —-0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0081CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (PAMANTASAN NG LUNGSOD NG SAN PABLO), BRGY SAN JOSE, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱96.5M | 0% | High risk95 | Flagged0.030 |
| 23DC0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN SEBASTIAN, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱99M | 75% | High risk74 | Flagged0.015 |
| 23DE0140OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BATANGAS CITY-SAN PASCUAL-BAUAN DIVERSION ROAD, PACKAGE J, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 0% | High risk63 | Flagged0.013 |
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 23DD0264CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD INCLUDING DRAINAGE, BRGY. POBLACION AND BRGY | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 100% | High risk73 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23DD0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, BATANGAS-QUEZON RD - K0108 + (-378) - K0108 +000, K0112 + 000 - K0113 + 793, K0114 + 216 - K0114 + 653 | Region IV-A | Batangas 4th DEO | Completed | ₱62.2M | 100% | Medium risk54 | —-0.103 |
| 52 | 24DD0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD INCLUDING DRAINAGE, BRGY. BUKAL-BRGY. MAUGAT EA | Region IV-A | Batangas 4th DEO | On-Going | ₱62.4M | 99% | Medium risk54 | —-0.065 |
| 53 | 22DD0246CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY TAMAK TO BARANGAY MAUGAT EAST, PADRE | Region IV-A | Batangas 4th DEO | Completed | ₱81.7M | 100% | Medium risk54 | —-0.101 |
| 54 | 22DD0107ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ROSARIO-SN JUAN RD - K0143 + 385 - K0143 + 586, K0144 + 316 - | Region IV-A | Batangas 4th DEO | Completed | ₱62.3M | 100% | Medium risk54 | —-0.103 |
| 55 | 24DC0052ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER - PHAS | Region IV-A | Batangas 3rd DEO | Completed | ₱86.8M | 100% | Medium risk53 | —-0.080 |
| 56 | 22DC0052ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER, TANAUA | Region IV-A | Batangas 3rd DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.084 |
| 57 | 21DC0103ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVERBANK PROTECTION ALONG PANSIPIT RIVER, AGONCILLO-SAN NICOLAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱67.5M | 100% | Medium risk53 | —-0.085 |
| 58 | 21DD0236LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PUBLIC MARKET), PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱46.1M | 100% | Medium risk52 | —-0.099 |
| 59 | 24DD0071ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, SN JUAN-LAIYA RD - K0146 + 433 - K0147 + 688, K0147 + 705 - K0148 + 631, K0154 + 282 - K0154 + 392, K0160 | Region IV-A | Batangas 4th DEO | On-Going | ₱55M | 96% | Medium risk52 | —-0.062 |
| 60 | 22DD0180CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF TAYSAN - ROSARIO ROAD, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱53.1M | 100% | Medium risk52 | —-0.104 |
| 61 | 23DD0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY (PUBLIC MARKET), ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱33.6M | 100% | Medium risk52 | —-0.093 |
| 62 | 23DD0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱28.8M | 100% | Medium risk51 | —-0.102 |
| 63 | 24DP0058NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - MASPANG H-WAY - K0070 + 850 - K0070 + 863, K0071 + 272 - K00710 + 280, K0071 + 403 - K0071 + 411, K0071 + 677 - K0071 + 730, K0073 + 029 - K0073 + 214, K0071 + 553 - K0072 + 497 | Region IV-A | Laguna 3rd DEO | On-Going | ₱47.5M | 80% | Medium risk51 | —-0.060 |
| 64 | 18DP0025CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS TAYAK HILLS ROAD LEADING TO TAYAK NATURE, ADVENTURE AND WILDLIFE PARK, BRGY. TALA, RIZAL, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱48.5M | 100% | Medium risk51 | —-0.104 |
| 65 | 21DD0314LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, SLOPE PROTECTION BY ROCK NETTING WITH SHOTCRETE AT BATANGAS-LOBO ROAD, (BRGY. PINA), TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | Medium risk51 | —-0.105 |
| 66 | 20DC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, PRIMARY ROADS, DAANG MAHARLIKA (LZ) | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.106 |
| 67 | 20DC0083ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES ALONG SAN JUAN RIVER, STO. TOMAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱48M | 100% | Medium risk50 | —-0.088 |
| 68 | 23DC0127CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX AND CONVECTION CENTER ), BRGY. DARASA, TANAUAN CITY, BATANG | Region IV-A | Batangas 3rd DEO | Completed | ₱9.9M | 100% | Medium risk50 | —-0.107 |
| 69 | 24DP0069FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE FOR MASAPANG BR. 2 (B02882LZ), VICTORIA, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱47.5M | 39% | Medium risk50 | —-0.027 |
| 70 | 23DI0015CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG MAULAWIN WATERWAYS, LOS BANOS, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱48.2M | 100% | Medium risk50 | —-0.088 |
| 71 | 21DC0081ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG SAN JUAN RIVER, TANAUAN-STO. TOMAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.089 |
| 72 | 24DP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE FOR MASAPANG BR. 1 (B02881LZ), VICTORIA, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 73 | 22DE0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC FRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. JAYBANGA | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 74 | 24DP0096CONCRETING OF BRGY. MALAYA FMR, BRGY. MALAYA, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱14.9M | 95% | Medium risk48 | —-0.011 |
| 75 | 24DP0135CONCRETING OF BRGY. SANTIAGO II FMR, BRGY. SANTIAGO II, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱14.9M | 59% | Medium risk48 | —-0.001 |