Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱6.6B
Average progress
95.8%
Completion rate
84.3%
Average risk score
54.7
Medium risk on average, out of 100
Flagged as unusual
12
10.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 114 | ₱6.5B | 54.5 | 11 | 96.3% |
| Region IX | 1 | ₱48.9M | 78.9 | 1 | 44.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱4.1B | 50.1 | 0 | 98.8% |
| Flood Control and Drainage | 17 | ₱1.1B | 52.2 | 1 | 98.4% |
| OTHER | 12 | ₱573.4M | 72.1 | 6 | 88.8% |
| Buildings and Facilities | 5 | ₱247.6M | 50.6 | 0 | 94.9% |
| GAA 2025 SSP | 4 | ₱366.1M | 95.6 | 4 | 56.5% |
| GAA 2025 OO-2 | 1 | ₱144.7M | 92.9 | 1 | 77.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 25HA0083CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱72.3M | 79% | High risk95 | Flagged0.021 |
| 25HB0045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84 | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 77% | High risk93 | Flagged0.006 |
| 24HA0159CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱33.7M | 91% | High risk87 | Flagged0.052 |
| 24HB0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.0 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 91% | High risk86 | Flagged0.059 |
| 24JB0048CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱48.9M | 45% | High risk79 | Flagged0.019 |
| 20HB0169CONCRETING OF SITIO TAWID, BRGY. MAYUGA TO BRGY. BIABAS FMR, MAYUGA AND BRGY. BIABAS, GUINDULMAN, BOHOL STA.0+954.55 - STA.1+068.00; STA.1 +840.00 - STA.1+943.86; STA.2+082.15 -STA.2+251.81; STA.2+637.81 -STA.2+808.27 | Region VII | Bohol 3rd DEO | Completed | ₱11.5M | 100% | High risk79 | Flagged0.012 |
| 21HB0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), BRGY. PROGRESO - BRGY. CAMBAO LEADING TO ALICIA PANORAMIC PARK, ALICIA, BOHOL, SECTION 1: ST | Region VII | Bohol 3rd DEO | Completed | ₱96.5M | 100% | High risk75 | —-0.019 |
| 25HC0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱79.6M | 81% | High risk74 | Flagged0.006 |
| 22HA0086CONSTRUCTION OF SIKATUNA-BALILIHAN VIA CAN-AGONG ROAD, SIKATUNA AND BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱79.2M | 100% | High risk72 | —-0.021 |
| 24HB0078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72 | Region VII | Bohol 3rd DEO | On-Going | ₱53.5M | 57% | High risk71 | Flagged0.018 |
| 17H00018MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, ANTEQUERA-BALILIHAN VIA DOROL ROAD LEADING TO CHOCOLATE HILLS VIA BALILIHAN-HANOPOL-BATUAN ROAD FROM CATAGBACAN INTERNATION | Region VII | Region VII | Completed | ₱96.5M | 100% | High risk69 | —-0.050 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
| 17H00017MF0 1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106520VS, SECONDARY ROADS, S00030BH, TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.) | Region VII | Region VII | Completed | ₱147M | 100% | High risk65 | —-0.038 |
| 24H00031CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT SAN ANTONIO RIVER, BRGY. SAN ANTONIO, DUERO, BOHOL | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk64 | —-0.008 |
| 17HA0050CONSTRUCTION OF CAMAYAAN RIVER FLOOD CONTROL, CORTES, BOHOL, PROJECT ID - P00121490VS | Region VII | Bohol 1st DEO | Completed | ₱27.5M | 100% | High risk63 | —-0.050 |
| 21H00013LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF JCT. (TER) LA UNION (CANDIJAY)-CABULAO-LUNGSODAAN-POOK ROAD (MABINI), CANDIJAY, BOHOL, SECTION 1: STA.0+000-STA. | Region VII | Region VII | Completed | ₱147.2M | 100% | High risk62 | —-0.069 |
| 19HB0031NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) K0159+786-K0159+900, K0162+519 - K0162+583, K0163+150 - K0163+300, K0174+030 - K0174+639, K0174+990 - K0175+124, K0175+215 - K0175+428, K0175+264 | Region VII | Bohol 3rd DEO | Completed | ₱15.1M | 100% | High risk62 | —-0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HB0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.0 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 91% | High risk86 | Flagged0.059 |
| 24HA0159CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱33.7M | 91% | High risk87 | Flagged0.052 |
| 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 25HA0083CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱72.3M | 79% | High risk95 | Flagged0.021 |
| 24JB0048CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱48.9M | 45% | High risk79 | Flagged0.019 |
| 24HB0078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72 | Region VII | Bohol 3rd DEO | On-Going | ₱53.5M | 57% | High risk71 | Flagged0.018 |
| 20HB0169CONCRETING OF SITIO TAWID, BRGY. MAYUGA TO BRGY. BIABAS FMR, MAYUGA AND BRGY. BIABAS, GUINDULMAN, BOHOL STA.0+954.55 - STA.1+068.00; STA.1 +840.00 - STA.1+943.86; STA.2+082.15 -STA.2+251.81; STA.2+637.81 -STA.2+808.27 | Region VII | Bohol 3rd DEO | Completed | ₱11.5M | 100% | High risk79 | Flagged0.012 |
| 25HB0045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84 | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 77% | High risk93 | Flagged0.006 |
| 25HC0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱79.6M | 81% | High risk74 | Flagged0.006 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 2 | 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 3 | 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 4 | 25HA0083CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱72.3M | 79% | High risk95 | Flagged0.021 |
| 5 | 25HB0045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84 | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 77% | High risk93 | Flagged0.006 |
| 6 | 24HA0159CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱33.7M | 91% | High risk87 | Flagged0.052 |
| 7 | 24HB0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.0 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 91% | High risk86 | Flagged0.059 |
| 8 | 24JB0048CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱48.9M | 45% | High risk79 | Flagged0.019 |
| 9 | 20HB0169CONCRETING OF SITIO TAWID, BRGY. MAYUGA TO BRGY. BIABAS FMR, MAYUGA AND BRGY. BIABAS, GUINDULMAN, BOHOL STA.0+954.55 - STA.1+068.00; STA.1 +840.00 - STA.1+943.86; STA.2+082.15 -STA.2+251.81; STA.2+637.81 -STA.2+808.27 | Region VII | Bohol 3rd DEO | Completed | ₱11.5M | 100% | High risk79 | Flagged0.012 |
| 10 | 21HB0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), BRGY. PROGRESO - BRGY. CAMBAO LEADING TO ALICIA PANORAMIC PARK, ALICIA, BOHOL, SECTION 1: ST | Region VII | Bohol 3rd DEO | Completed | ₱96.5M | 100% | High risk75 | —-0.019 |
| 11 | 25HC0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱79.6M | 81% | High risk74 | Flagged0.006 |
| 12 | 22HA0086CONSTRUCTION OF SIKATUNA-BALILIHAN VIA CAN-AGONG ROAD, SIKATUNA AND BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱79.2M | 100% | High risk72 | —-0.021 |
| 13 | 24HB0078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72 | Region VII | Bohol 3rd DEO | On-Going | ₱53.5M | 57% | High risk71 | Flagged0.018 |
| 14 | 17H00018MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, ANTEQUERA-BALILIHAN VIA DOROL ROAD LEADING TO CHOCOLATE HILLS VIA BALILIHAN-HANOPOL-BATUAN ROAD FROM CATAGBACAN INTERNATION | Region VII | Region VII | Completed | ₱96.5M | 100% | High risk69 | —-0.050 |
| 15 | 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
| 16 | 17H00017MF0 1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106520VS, SECONDARY ROADS, S00030BH, TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.) | Region VII | Region VII | Completed | ₱147M | 100% | High risk65 | —-0.038 |
| 17 | 24H00031CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT SAN ANTONIO RIVER, BRGY. SAN ANTONIO, DUERO, BOHOL | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk64 | —-0.008 |
| 18 | 17HA0050CONSTRUCTION OF CAMAYAAN RIVER FLOOD CONTROL, CORTES, BOHOL, PROJECT ID - P00121490VS | Region VII | Bohol 1st DEO | Completed | ₱27.5M | 100% | High risk63 | —-0.050 |
| 19 | 21H00013LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF JCT. (TER) LA UNION (CANDIJAY)-CABULAO-LUNGSODAAN-POOK ROAD (MABINI), CANDIJAY, BOHOL, SECTION 1: STA.0+000-STA. | Region VII | Region VII | Completed | ₱147.2M | 100% | High risk62 | —-0.069 |
| 20 | 19HB0031NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) K0159+786-K0159+900, K0162+519 - K0162+583, K0163+150 - K0163+300, K0174+030 - K0174+639, K0174+990 - K0175+124, K0175+215 - K0175+428, K0175+264 | Region VII | Bohol 3rd DEO | Completed | ₱15.1M | 100% | High risk62 | —-0.031 |
| 21 | 23HA0106CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) JCT. (TER) ALBURQUERQUE-SIKATUNA ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, S | Region VII | Bohol 1st DEO | Completed | ₱120.5M | 100% | High risk61 | —-0.078 |
| 22 | 17HB0016NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, LOAY INTERIOR ROAD, SECTION 1: K0199+660 - K0200+773; SECTION 2: K0197+509 - K0199+000; SECTION3: K0173+474 - K0174+275; SECTION4:K0157+109 - K0157+879; SECTION5: K0191+011 - K0191+527 | Region VII | Bohol 3rd DEO | Completed | ₱46M | 100% | High risk61 | —-0.030 |
| 23 | 18H00009CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, JCT. DAUIS-PANGLAO ROAD TO LOURDES-BOHOL-TAWALA LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, INCL. ROW, BOHOL PROVINCE | Region VII | Region VII | Completed | ₱94.7M | 100% | High risk60 | —-0.062 |
| 24 | 19HB0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-JCT. (TER) POB. (VALENCIA)-ANOYON-OMJON-QUEZON (BATUAN) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, VALENCIA, BOHOL STA.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk60 | —-0.029 |
| 25 | 19HB0025NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, LOAY INTERIOR ROAD (S00077BH), K0176+719 - K0177+200 | Region VII | Bohol 3rd DEO | Completed | ₱6.4M | 100% | Medium risk60 | —-0.029 |