Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱6.6B
Average progress
95.8%
Completion rate
84.3%
Average risk score
54.7
Medium risk on average, out of 100
Flagged as unusual
12
10.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 114 | ₱6.5B | 54.5 | 11 | 96.3% |
| Region IX | 1 | ₱48.9M | 78.9 | 1 | 44.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱4.1B | 50.1 | 0 | 98.8% |
| Flood Control and Drainage | 17 | ₱1.1B | 52.2 | 1 | 98.4% |
| OTHER | 12 | ₱573.4M | 72.1 | 6 | 88.8% |
| Buildings and Facilities | 5 | ₱247.6M | 50.6 | 0 | 94.9% |
| GAA 2025 SSP | 4 | ₱366.1M | 95.6 | 4 | 56.5% |
| GAA 2025 OO-2 | 1 | ₱144.7M | 92.9 | 1 | 77.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 25HA0083CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱72.3M | 79% | High risk95 | Flagged0.021 |
| 25HB0045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84 | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 77% | High risk93 | Flagged0.006 |
| 24HA0159CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱33.7M | 91% | High risk87 | Flagged0.052 |
| 24HB0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.0 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 91% | High risk86 | Flagged0.059 |
| 24JB0048CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱48.9M | 45% | High risk79 | Flagged0.019 |
| 20HB0169CONCRETING OF SITIO TAWID, BRGY. MAYUGA TO BRGY. BIABAS FMR, MAYUGA AND BRGY. BIABAS, GUINDULMAN, BOHOL STA.0+954.55 - STA.1+068.00; STA.1 +840.00 - STA.1+943.86; STA.2+082.15 -STA.2+251.81; STA.2+637.81 -STA.2+808.27 | Region VII | Bohol 3rd DEO | Completed | ₱11.5M | 100% | High risk79 | Flagged0.012 |
| 21HB0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), BRGY. PROGRESO - BRGY. CAMBAO LEADING TO ALICIA PANORAMIC PARK, ALICIA, BOHOL, SECTION 1: ST | Region VII | Bohol 3rd DEO | Completed | ₱96.5M | 100% | High risk75 | —-0.019 |
| 25HC0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱79.6M | 81% | High risk74 | Flagged0.006 |
| 22HA0086CONSTRUCTION OF SIKATUNA-BALILIHAN VIA CAN-AGONG ROAD, SIKATUNA AND BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱79.2M | 100% | High risk72 | —-0.021 |
| 24HB0078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72 | Region VII | Bohol 3rd DEO | On-Going | ₱53.5M | 57% | High risk71 | Flagged0.018 |
| 17H00018MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, ANTEQUERA-BALILIHAN VIA DOROL ROAD LEADING TO CHOCOLATE HILLS VIA BALILIHAN-HANOPOL-BATUAN ROAD FROM CATAGBACAN INTERNATION | Region VII | Region VII | Completed | ₱96.5M | 100% | High risk69 | —-0.050 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
| 17H00017MF0 1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106520VS, SECONDARY ROADS, S00030BH, TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.) | Region VII | Region VII | Completed | ₱147M | 100% | High risk65 | —-0.038 |
| 24H00031CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT SAN ANTONIO RIVER, BRGY. SAN ANTONIO, DUERO, BOHOL | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk64 | —-0.008 |
| 17HA0050CONSTRUCTION OF CAMAYAAN RIVER FLOOD CONTROL, CORTES, BOHOL, PROJECT ID - P00121490VS | Region VII | Bohol 1st DEO | Completed | ₱27.5M | 100% | High risk63 | —-0.050 |
| 21H00013LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF JCT. (TER) LA UNION (CANDIJAY)-CABULAO-LUNGSODAAN-POOK ROAD (MABINI), CANDIJAY, BOHOL, SECTION 1: STA.0+000-STA. | Region VII | Region VII | Completed | ₱147.2M | 100% | High risk62 | —-0.069 |
| 19HB0031NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) K0159+786-K0159+900, K0162+519 - K0162+583, K0163+150 - K0163+300, K0174+030 - K0174+639, K0174+990 - K0175+124, K0175+215 - K0175+428, K0175+264 | Region VII | Bohol 3rd DEO | Completed | ₱15.1M | 100% | High risk62 | —-0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HB0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.0 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 91% | High risk86 | Flagged0.059 |
| 24HA0159CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱33.7M | 91% | High risk87 | Flagged0.052 |
| 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 25HA0083CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱72.3M | 79% | High risk95 | Flagged0.021 |
| 24JB0048CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱48.9M | 45% | High risk79 | Flagged0.019 |
| 24HB0078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72 | Region VII | Bohol 3rd DEO | On-Going | ₱53.5M | 57% | High risk71 | Flagged0.018 |
| 20HB0169CONCRETING OF SITIO TAWID, BRGY. MAYUGA TO BRGY. BIABAS FMR, MAYUGA AND BRGY. BIABAS, GUINDULMAN, BOHOL STA.0+954.55 - STA.1+068.00; STA.1 +840.00 - STA.1+943.86; STA.2+082.15 -STA.2+251.81; STA.2+637.81 -STA.2+808.27 | Region VII | Bohol 3rd DEO | Completed | ₱11.5M | 100% | High risk79 | Flagged0.012 |
| 25HB0045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84 | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 77% | High risk93 | Flagged0.006 |
| 25HC0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱79.6M | 81% | High risk74 | Flagged0.006 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 20HA0135CONSTRUCTION OF 4STY 24CL, TAGBILARAN CITY CENTRAL ELEMENTARY SCHOOL, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱56.5M | 100% | Medium risk52 | —-0.038 |
| 52 | 24HB0015CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREET LIGHTS ALONG TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0171 + 174 - K0174 + 695; K0177 + 088 - K0180 + 070 | Region VII | Bohol 3rd DEO | Completed | ₱73M | 100% | Medium risk52 | —-0.088 |
| 53 | 23HB0051ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS TAGBILARAN EAST RD ( | Region VII | Bohol 3rd DEO | Completed | ₱62.6M | 100% | Medium risk51 | —-0.089 |
| 54 | 24HB0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTLING ALONG JCT DAT-AN-CARMEN-SIERRA BULLONES-PILAR-ALICIA RD K007 | Region VII | Bohol 3rd DEO | Completed | ₱72.4M | 100% | Medium risk51 | —-0.088 |
| 55 | 24HA0002CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF VILLANUEVA, TUBIGON, FLOOD CONTROL, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱53M | 100% | Medium risk51 | —-0.077 |
| 56 | 23HA0049REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - JCT. (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS ROAD, K0048+351 - K0048+491 | Region VII | Bohol 1st DEO | Completed | ₱53M | 100% | Medium risk51 | —-0.094 |
| 57 | 19HA0058CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO AIRPORTS - JCT. PICR VIA BIKING-LIBAONG-BOLOD ACCESS ROAD LEADING TO NEW BOHOL INTERNATIONAL AIRPORT, PANGLAO, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱47.3M | 100% | Medium risk51 | —-0.094 |
| 58 | 24HA0037CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONASTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY TAN-AWAN, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱53M | 100% | Medium risk51 | —-0.075 |
| 59 | 20HA0100CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ABATAN RIVER, BRGY. STO. ROSARIO, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.070 |
| 60 | 20HA0125CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ABATAN RIVER, BRGY. CABAWAN AND AGAHAY, MARIBOJOC, BOHOL, PHASE II | Region VII | Bohol 1st DEO | Completed | ₱47.3M | 100% | Medium risk50 | —-0.076 |
| 61 | 20HA0118CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BACLAYON SEAWALL, POBLACION, BACLAYON | Region VII | Bohol 1st DEO | Completed | ₱47.3M | 100% | Medium risk50 | —-0.074 |
| 62 | 23HB0010ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS SECONDARY ROADS TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0224 + 210.32 - K02 | Region VII | Bohol 3rd DEO | Completed | ₱50.6M | 100% | Medium risk50 | —-0.093 |
| 63 | 23HB0071ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL CANHAWAY AND SITIO PONOD, BRGY. SAWANG, GUINDUL | Region VII | Bohol 3rd DEO | Completed | ₱77.2M | 100% | Medium risk50 | —-0.072 |
| 64 | 24HB0140CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL PROTECTION, GARCIA-HERNANDEZ, BOHOL STA. | Region VII | Bohol 3rd DEO | Completed | ₱57.9M | 100% | Medium risk50 | —-0.072 |
| 65 | 23HB0004ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS JCT (TER)-JAGNA-SIERRA BULLONES RD KO078 + 533.00 - K | Region VII | Bohol 3rd DEO | Completed | ₱51.7M | 100% | Medium risk49 | —-0.090 |
| 66 | 20H00063CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS-CONSTRUCTION OF EVACUATION CENTER AT BRGY. GENONOCAN, TUBIGON, BOHOL | Region VII | Region VII | Completed | ₱34.7M | 100% | Medium risk49 | —-0.082 |
| 67 | 24HB0164CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WITH SLIP AND DRAINAGE SYSTEM AT ROAD LEADING TO CAN-UMA | Region VII | Bohol 3rd DEO | On-Going | ₱49.4M | 90% | Medium risk48 | —-0.052 |
| 68 | 24HB0127CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FCILITIES - CONSTRUCTION OF ROADS, BRGY. CASBU-BRGY. BATO, GUINDULMAN, BOHOL, STA. | Region VII | Bohol 3rd DEO | Completed | ₱49.5M | 100% | Medium risk48 | —-0.092 |
| 69 | 24HB0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, PILAR, BOHOL STA. 0+0.000.00 - STA. 2+040.0 | Region VII | Bohol 3rd DEO | Completed | ₱49.5M | 100% | Medium risk48 | —-0.093 |
| 70 | 22HB0130CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF SOLAR STREETLIGHTS ALONG NATIONAL HIGHWAY AT TUGAS-PAGAHAT ROAD, CANDIJAY, BOHOL K0162+000-K0171+337 | Region VII | Bohol 3rd DEO | Completed | ₱48.9M | 100% | Medium risk48 | —-0.092 |
| 71 | 22HB0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - JCT. (TER) BRGY. PROGRESO TO BRGY. CAMBAOL LEADING TO ALICIA PANORAMIC PARK, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.093 |
| 72 | 24HB0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)- BRGY. CATUNGAWAN SUR LEADING TO LANDTHAI HILLS, GUINDULMAN, BOHOL STA.2+900 - STA.3+1 | Region VII | Bohol 3rd DEO | Completed | ₱48.2M | 100% | Medium risk48 | —-0.093 |
| 73 | 24HB0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, GARCIA-HERNANDEZ, BOHOL SEC1: STA. 3+500.00 | Region VII | Bohol 3rd DEO | Completed | ₱49.5M | 100% | Medium risk48 | —-0.091 |
| 74 | 22HB0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF JIMILI-AN BARANGAY ROAD | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.082 |
| 75 | 24HA0125CONCRETING OF BRGY. MAGSIJA TO BRGY. CABAD FMR, BRGY. MAGSIJA AND BRGY. CABAD, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱29.8M | 100% | Medium risk47 | —-0.034 |