Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱6.6B
Average progress
95.8%
Completion rate
84.3%
Average risk score
54.7
Medium risk on average, out of 100
Flagged as unusual
12
10.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 114 | ₱6.5B | 54.5 | 11 | 96.3% |
| Region IX | 1 | ₱48.9M | 78.9 | 1 | 44.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱4.1B | 50.1 | 0 | 98.8% |
| Flood Control and Drainage | 17 | ₱1.1B | 52.2 | 1 | 98.4% |
| OTHER | 12 | ₱573.4M | 72.1 | 6 | 88.8% |
| Buildings and Facilities | 5 | ₱247.6M | 50.6 | 0 | 94.9% |
| GAA 2025 SSP | 4 | ₱366.1M | 95.6 | 4 | 56.5% |
| GAA 2025 OO-2 | 1 | ₱144.7M | 92.9 | 1 | 77.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 25HA0083CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱72.3M | 79% | High risk95 | Flagged0.021 |
| 25HB0045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84 | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 77% | High risk93 | Flagged0.006 |
| 24HA0159CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱33.7M | 91% | High risk87 | Flagged0.052 |
| 24HB0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.0 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 91% | High risk86 | Flagged0.059 |
| 24JB0048CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱48.9M | 45% | High risk79 | Flagged0.019 |
| 20HB0169CONCRETING OF SITIO TAWID, BRGY. MAYUGA TO BRGY. BIABAS FMR, MAYUGA AND BRGY. BIABAS, GUINDULMAN, BOHOL STA.0+954.55 - STA.1+068.00; STA.1 +840.00 - STA.1+943.86; STA.2+082.15 -STA.2+251.81; STA.2+637.81 -STA.2+808.27 | Region VII | Bohol 3rd DEO | Completed | ₱11.5M | 100% | High risk79 | Flagged0.012 |
| 21HB0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), BRGY. PROGRESO - BRGY. CAMBAO LEADING TO ALICIA PANORAMIC PARK, ALICIA, BOHOL, SECTION 1: ST | Region VII | Bohol 3rd DEO | Completed | ₱96.5M | 100% | High risk75 | —-0.019 |
| 25HC0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱79.6M | 81% | High risk74 | Flagged0.006 |
| 22HA0086CONSTRUCTION OF SIKATUNA-BALILIHAN VIA CAN-AGONG ROAD, SIKATUNA AND BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱79.2M | 100% | High risk72 | —-0.021 |
| 24HB0078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72 | Region VII | Bohol 3rd DEO | On-Going | ₱53.5M | 57% | High risk71 | Flagged0.018 |
| 17H00018MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, ANTEQUERA-BALILIHAN VIA DOROL ROAD LEADING TO CHOCOLATE HILLS VIA BALILIHAN-HANOPOL-BATUAN ROAD FROM CATAGBACAN INTERNATION | Region VII | Region VII | Completed | ₱96.5M | 100% | High risk69 | —-0.050 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
| 17H00017MF0 1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106520VS, SECONDARY ROADS, S00030BH, TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.) | Region VII | Region VII | Completed | ₱147M | 100% | High risk65 | —-0.038 |
| 24H00031CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT SAN ANTONIO RIVER, BRGY. SAN ANTONIO, DUERO, BOHOL | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk64 | —-0.008 |
| 17HA0050CONSTRUCTION OF CAMAYAAN RIVER FLOOD CONTROL, CORTES, BOHOL, PROJECT ID - P00121490VS | Region VII | Bohol 1st DEO | Completed | ₱27.5M | 100% | High risk63 | —-0.050 |
| 21H00013LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF JCT. (TER) LA UNION (CANDIJAY)-CABULAO-LUNGSODAAN-POOK ROAD (MABINI), CANDIJAY, BOHOL, SECTION 1: STA.0+000-STA. | Region VII | Region VII | Completed | ₱147.2M | 100% | High risk62 | —-0.069 |
| 19HB0031NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) K0159+786-K0159+900, K0162+519 - K0162+583, K0163+150 - K0163+300, K0174+030 - K0174+639, K0174+990 - K0175+124, K0175+215 - K0175+428, K0175+264 | Region VII | Bohol 3rd DEO | Completed | ₱15.1M | 100% | High risk62 | —-0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HB0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER PHASE 3, ILAUD, PILAR, BOHOL STA.0+323.00 - STA.0+470.00 R/S, STA.0 | Region VII | Bohol 3rd DEO | On-Going | ₱93.6M | 91% | High risk86 | Flagged0.059 |
| 24HA0159CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱33.7M | 91% | High risk87 | Flagged0.052 |
| 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Region VII | Bohol 2nd DEO | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 25HA0083CONSTRUCTION OF JCT. TCSR POBLACION-CANCATAC (CORELLA) TO CANTIGUIB (ALBURQUERQUE)-ABUCAY NORTE (SIKATUNA) PROVINCIAL ROAD, CORELLA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱72.3M | 79% | High risk95 | Flagged0.021 |
| 24JB0048CONSTRUCTION OF UPPER GUMAY BRIDGE AT UPPER GUMAY, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱48.9M | 45% | High risk79 | Flagged0.019 |
| 24HB0078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72 | Region VII | Bohol 3rd DEO | On-Going | ₱53.5M | 57% | High risk71 | Flagged0.018 |
| 20HB0169CONCRETING OF SITIO TAWID, BRGY. MAYUGA TO BRGY. BIABAS FMR, MAYUGA AND BRGY. BIABAS, GUINDULMAN, BOHOL STA.0+954.55 - STA.1+068.00; STA.1 +840.00 - STA.1+943.86; STA.2+082.15 -STA.2+251.81; STA.2+637.81 -STA.2+808.27 | Region VII | Bohol 3rd DEO | Completed | ₱11.5M | 100% | High risk79 | Flagged0.012 |
| 25HB0045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE ALONG CASBU RIVER, CANDIJAY, BOHOL, STA. 0+393.84 - STA. 0+947.84 | Region VII | Bohol 3rd DEO | On-Going | ₱144.7M | 77% | High risk93 | Flagged0.006 |
| 25HC0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO UBAY PORT VIA RECLAMATION AREA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱79.6M | 81% | High risk74 | Flagged0.006 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24HA0015REHABILITATION/ ROCONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0019+000-K0019+260, K0022+335-K0022+735, K0022+814-K0022+935, K0023+236-K0023+314, K0023+468-K0023+531, K0023+545-K0023+60 | Region VII | Bohol 1st DEO | Completed | ₱38M | 100% | Medium risk47 | —-0.095 |
| 77 | 23HA0039REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - TAGBILARAN NORTH ROAD (TAGBILARAN- JETAFE SECTION), K0009+719 - K0009+757, K0009+814-K0009+906 | Region VII | Bohol 1st DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.094 |
| 78 | 25HA0017INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT (TNR) MARIBOJOC-ANTEQUERA-CATAGBACAN (LOON) - K0011 + (-357) - K0016 + 605 | Region VII | Bohol 1st DEO | Completed | ₱41.9M | 100% | Medium risk47 | —-0.095 |
| 79 | 22HA0124REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ANTEQUERA-BALILIHAN VIA DOROL ROAD (CANUMAY-BUNGAHAN-MAGASO SECTION) ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.095 |
| 80 | 25HA0039INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGTHING) ALONG THE PRESIDENT CARLOS P. GACIA CIRCUMFERENTIAL RD - K0010+434 - K0010+676, K0011+000 - K0013+500, K0014+000 - K0014+400, K0014+740 - K0016+680, K0017+000 - K0018+000, K0018+450 - | Region VII | Bohol 1st DEO | Completed | ₱38.2M | 100% | Medium risk47 | —-0.095 |
| 81 | 19HA0002REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECTION) K0015+520 - K0016+420, MARIBOJOC, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱31.5M | 100% | Medium risk47 | —-0.096 |
| 82 | 22HA0125REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ANTEQUERA-BALILIHAN VIA DOROL ROAD (ANGILAN SECTION 2), ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.095 |
| 83 | 22HA0121REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ANTIQUERA-BALILIHAN VIA DOROL ROAD (ANGILAN SECTION) ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.095 |
| 84 | 18HA0100CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONSTRUCTION OF ANTEQUERA RIVER CONTROL, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱22.3M | 100% | Medium risk47 | —-0.047 |
| 85 | 18HA0117CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEM - CONSTRUCTION OF CAMAYAAN RIVER CONTROL, CORTES, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱23.5M | 100% | Medium risk47 | —-0.078 |
| 86 | 18HA0059CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-JCT. TCSR ABUCAY NORTE-CAN-AGONG LEADING TO LAKE LINAW SIKATUNA TREE PARK & TARSIER CONSERVATION AREA, BRGY. CAN-AGONG, SIKATUNA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱32.9M | 100% | Medium risk47 | —-0.095 |
| 87 | 22H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD, SIKATUNA TO SEVILLA, BOHOL | Region VII | Region VII | Completed | ₱38.6M | 100% | Medium risk46 | —-0.094 |
| 88 | 24HA0127CONCRETING OF BRGY. CABAD LEADING TO BRGY. CANDASIG FMR, BRGY. CABAD, BALILIHAN | Region VII | Bohol 1st DEO | Completed | ₱24.9M | 100% | Medium risk46 | —-0.037 |
| 89 | 19HA0045CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - LOOC (BINLOD)-BIL-ISAN-CROSSING TANGNAN LEADING TO VERANEANTE RESORT, MOMO BEACH AND HOUSE AND AYACCA CONDO-RESIDENCES RESORT, BRGY. BIL-ISAN TANGNAN, PANGLAO, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱18.9M | 100% | Medium risk46 | —-0.096 |
| 90 | 18HA0041REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD-TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.)-K0017+450-K0018+000, K0036+300-K0036+760, MARIBOJOC AND LOON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱26M | 100% | Medium risk46 | —-0.096 |
| 91 | 18HA0068CONCRETING OF JCT. SAN ISIDRO-BINAYRAN-DAMPAS ROAD STA.00+000-STA.00+315.37,STA.00+435-STA.01+225, TAGBILARAN CITY | Region VII | Bohol 1st DEO | Completed | ₱23.6M | 100% | Medium risk46 | —-0.095 |
| 92 | 19HA0055CONCRETING OF JCT. SAN ISIDRO-BINAYRAN-DAMPAS ROAD, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱22.1M | 100% | Medium risk46 | —-0.095 |
| 93 | 18HA0090WIDENING AND CONCRETING OF HANGOS ROAD, TAGBILARAN CITY, (ROAD LEADING TO NEW PROVINCIAL CAPITOL BUILDING FROM JA CLARIN STREET), TAGBILARAN CITY | Region VII | Bohol 1st DEO | Completed | ₱23.6M | 100% | Medium risk46 | —-0.095 |
| 94 | 18HA0004REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- JCT. (TER) DAUIS-PANGLAO ROAD - K008+000 - K009+000, DAUIS & PANGLAO, BOHOL. PROJECT ID: P00201159VS | Region VII | Bohol 1st DEO | Completed | ₱26M | 100% | Medium risk46 | —-0.095 |
| 95 | 18HA0091CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF CANTOMIMBO RIVER CONTROL, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱23.6M | 100% | Medium risk46 | —-0.078 |
| 96 | 22HB0092CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)_ FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURES, LOBOC RIVER, VILLAFLOR, LOBOC BOH | Region VII | Bohol 3rd DEO | Completed | ₱40.2M | 100% | Medium risk46 | —-0.075 |
| 97 | 21HA0144CONCRETING OF MACAAS TO BOSONGON - BUNACAN CAWAYANAN ROAD, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.097 |
| 98 | 18HB0029NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - TAGBILARAN CITY-CORELLA-SIKATUNA-LOBOC ROAD, BOHOL PROVINCE | Region VII | Bohol 3rd DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.094 |
| 99 | 19HA0050CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - JCT. TCSR POBLACION - LIBJO ROAD LEADING TO MIRRORS OF THE WORLD SIKATUNA AND SIKATUNA TREE PARK, SIKATUNA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱9.5M | 100% | Medium risk45 | —-0.096 |
| 100 | 20HA0009CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - JCT. TCSR POBLACION - LIBJO ROAD LEADING TO MIRRORS OF THE WORLD SIKATUNA AND SIKATUNA TREE PARK, SIKATUNA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱9.5M | 100% | Medium risk45 | —-0.096 |