Opening the dossier…
Opening the dossier…
Contractor dossier
14 projects on file, including joint ventures this contractor is part of.
Total projects
14
Total budget
₱632.6M
Average progress
99.5%
Completion rate
85.7%
Average risk score
35.2
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 14 | ₱632.6M | 35.2 | 0 | 99.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 9 | ₱560.9M | 39.2 | 0 | 99.3% |
| Roads | 5 | ₱71.7M | 27.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CI0004BASIC INFRASTRUCTURE PROGRAM (BIP); BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER (PHASE I) BARANGAY ESCALER, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱148.5M | 96% | Medium risk59 | —-0.036 |
| 2 | 25CI0007BASIC INFRASTRUCTURE PROGRAM (BIP); BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER (PHASE III), BARANGAY TURU, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱148.5M | 98% | Medium risk59 | —-0.037 |
| 3 | 24CI0130FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANG BALEN RIVER, DOWNSTREAM OF SAPANG BALEN BRIDGE (LEFT DIKE), PHASE I, MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱48.2M | 100% | Medium risk43 | —-0.028 |
| 4 | 24CI0131FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANGBALEN RIVER, DOWNSTREAM OF SAPANGBALEN BRIDGE (LEFT DIKE), PHASE II, MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱48.2M | 100% | Medium risk43 | —-0.028 |
| 5 | 23CI0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM; SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; IMPROVEMENT OF ROAD AT ANGELES CITY, PAMPA | Region III | Pampanga 3rd DEO | Completed | ₱19.6M | 100% | Medium risk33 | —-0.103 |
| 6 | 25CI0012FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALASAS CREEK (PHASE III), BARANGAY SAN AGUSTIN, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.093 |
| 7 | 23CI0148CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION/IMPROVEMENT OF ANGELES-MAGALANG | Region III | Pampanga 3rd DEO | Completed | ₱19.6M | 100% | Medium risk32 | —-0.104 |
| 8 | 24CI0024OFF-CARRIAGEWAY IMPROVEMENT: TERTIARY ROADS ALONG DAVID ROAD, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱19.6M | 100% | Medium risk31 | —-0.105 |
| 9 | 24CI0040INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG MANILA NORTH RD (S04206LZ)-K0085+573-K0086+345, BARANGAY DAU, MABALACAT, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱9.6M | 100% | Medium risk30 | —-0.101 |
| 10 | 25CI0045FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANGBATO RIVER, MARGOT, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱24.4M | 100% | Low risk29 | —-0.088 |
| 11 | 23CI0039FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY AMSIC TO BRGY ANUNAS, ANGELES CITY, PAM | Region III | Pampanga 3rd DEO | Completed | ₱29.2M | 100% | Low risk29 | —-0.087 |
| 12 | 25CI0002FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBALEN RIVER, SITIO PITABACAN, BARANGAY SAN ILDEFONSO, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱38.6M | 100% | Low risk29 | —-0.092 |
| 13 | 23CI0097FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REPAIR/IMPROVEMENT OF REINFORCED CONCRETE SLOPE PROTECTION ALONG SAPANGBALEN CREEK, SITIO PITABACAN, BRGY SAN ILDEFONSO, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱26.3M | 100% | Low risk29 | —-0.091 |
| 14 | 24CI0066NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS, MANILA NORTH RD-K0093+499-K0093+783 (WITH SOLAR LED STREET LIGHTS), ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱3.3M | 100% | Low risk13 | —-0.099 |