Opening the dossier…
Opening the dossier…
Contractor dossier
9 projects on file, including joint ventures this contractor is part of.
Total projects
9
Total budget
₱1.8B
Average progress
27.1%
Completion rate
0.0%
Below 70%
Average risk score
62.9
High risk on average, out of 100
Flagged as unusual
4
44.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 9 | ₱1.8B | 62.9 | 4 | 27.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 5 | ₱1.2B | 67.4 | 4 | 41.1% |
| Roads | 3 | ₱603.3M | 63.6 | 0 | 12.9% |
| Bridges | 1 | ₱24.6M | 38.6 | 0 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00011CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 43% | High risk68 | Flagged0.005 |
| 25E00010CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 42% | High risk68 | Flagged0.005 |
| 25E00064CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276M | 24% | High risk68 | Flagged0.009 |
| 25E00065CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.1M | 30% | High risk68 | Flagged0.008 |
| 25E00027CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG MAMARA RIVER (UPSTREAM), BRGY. TUBILI, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱177.9M | 66% | High risk67 | —-0.005 |
| 25E00231SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR A-BRGY. MELGAR B, STA. 000+760-STA. 001+191.26, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 20% | High risk64 | —-0.015 |
| 25E00191SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF PTO. GALERA-ABRA DE ILOG ROAD (MINDORO CIRCUMFERENTIAL ROAD), CAMURONG SECTION, BRGY. UDALO, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱186.1M | 9% | High risk64 | —-0.014 |
| 25E00190SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF PUERTO GALERA-ABRA DE ILOG ROAD (MINDORO CIRCUMFERENTIAL ROAD), BRGY. UDALO, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱186.1M | 9% | High risk63 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00064CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276M | 24% | High risk68 | Flagged0.009 |
| 25E00065CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.1M | 30% | High risk68 | Flagged0.008 |
| 25E00011CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 43% | High risk68 | Flagged0.005 |
| 25E00010CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 42% | High risk68 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25E00011CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 43% | High risk68 | Flagged0.005 |
| 2 | 25E00010CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 42% | High risk68 | Flagged0.005 |
| 3 | 25E00064CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276M | 24% | High risk68 | Flagged0.009 |
| 4 | 25E00065CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.1M | 30% | High risk68 | Flagged0.008 |
| 5 | 25E00027CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG MAMARA RIVER (UPSTREAM), BRGY. TUBILI, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱177.9M | 66% | High risk67 | —-0.005 |
| 6 | 25E00231SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR A-BRGY. MELGAR B, STA. 000+760-STA. 001+191.26, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 20% | High risk64 | —-0.015 |
| 7 | 25E00191SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF PTO. GALERA-ABRA DE ILOG ROAD (MINDORO CIRCUMFERENTIAL ROAD), CAMURONG SECTION, BRGY. UDALO, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱186.1M | 9% | High risk64 | —-0.014 |
| 8 | 25E00190SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF PUERTO GALERA-ABRA DE ILOG ROAD (MINDORO CIRCUMFERENTIAL ROAD), BRGY. UDALO, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱186.1M | 9% | High risk63 | —-0.014 |
| 9 | 25E00224BRIDGE PROGRAM- CASILIGAN BRIDGE (B00028MR) ALONG CSR JCT. - POLA ROAD, POL;A, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱24.6M | 0% | Medium risk39 | —-0.008 |