Contractor dossier
272 projects on file, including joint ventures this contractor is part of.
Total projects
272
Total budget
₱8.3B
Average progress
90.4%
Completion rate
79.4%
Average risk score
50.5
Medium risk on average, out of 100
Flagged as unusual
31
11.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 239 | ₱6.8B | 51.2 | 29 | 89.2% |
| Region III | 10 | ₱538.4M | 41.4 | 0 | 100.0% |
| Region IV-B | 10 | ₱219.6M | 40.2 | 0 | 100.0% |
| Cordillera Administrative Region | 6 | ₱357.5M | 56.9 | 1 | 97.1% |
| Region XIII | 3 | ₱159M | 44.1 | 0 | 100.0% |
| Region II | 2 | ₱60.8M | 49.7 | 0 | 100.0% |
| Negros Island Region | 1 | ₱96.5M | 57.7 | 0 | 100.0% |
| Region VI | 1 | ₱14.8M | 48.9 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 85 | ₱2.4B | 49.6 | 8 | 87.1% |
| Flood Control and Drainage | 74 | ₱2.3B | 52.6 | 6 | 96.7% |
| Bridges | 62 | ₱2.9B | 53.4 | 8 | 89.8% |
| Buildings and Facilities | 44 | ₱432.4M | 40.5 | 4 | 90.6% |
| OTHER | 3 | ₱148.4M | 74.9 | 2 | 97.0% |
| GAA 2025 OO-1 | 2 | ₱142.8M | 92.5 | 2 | 46.5% |
| GAA 2025 SSP | 1 | ₱9.5M | 95.2 | 1 | 0.0% |
| Water Provision and Storage | 1 | ₱978K | 23.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0199CONVE & SPEC SUP PROG - SUST INFRA PROJ ALLE GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEAD TO MAJOR/STRA PUBLIC BLDGS/FAC - CONST OF MARUAYA-DUPITAC-CALAMBEG ESTANCIA RD LEAD TO LOWLAND COFFEE CONVE INITIA PROJ, BRGY. ESTANCIA, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk95 | Flagged0.046 |
| 25A00245CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG - CARASI - CALANASAN ROAD, ILOCOS NORTE | Region I | Region I | On-Going | ₱136.6M | 55% | High risk94 | Flagged0.030 |
| 25A00297WIDENING OF PERMANENT BRIDGES - INNHS IRRIGATION BR. 1 (B00553LZ) ALONG ABLAN AVE. | Region I | Region I | On-Going | ₱6.3M | 38% | High risk91 | Flagged0.018 |
| 23PA0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CALABA, BANGUED, | Cordillera Administrative Region | Abra DEO | On-Going | ₱96.5M | 95% | High risk81 | Flagged0.026 |
| 25AA0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RIVERSIDE ROAD, LOING-CABAROAN, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0432CONVE AND SPE SUP PROG - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRA PUBLIC BLDG/FACILITIES - REHAB OF BIMMANGA - MANGITAYAG ROAD, BARANGAY 4 BIMMANGA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0299CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF ROAD, BARANGAY 22 BOYBOY, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk80 | Flagged0.009 |
| 25AA0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BRGY 54-B CAMANGAAN TO BRGY 28, L.C., I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 14% | High risk78 | —-0.017 |
| 25AA0244CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY 61 CATABAN, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 50% | High risk77 | —-0.032 |
| 24AA0334SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY 21 STA. MARIA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 96% | High risk77 | —-0.046 |
| 24AA0405CONCRETING OF BRGY. CAMANGGAAN TO BRGY. RIOENG FMR, BRGY. CAMANGGAAN AND BRGY. RIOENG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.1M | 92% | High risk76 | Flagged0.017 |
| 24AA0386BIP - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORTSOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSEBUILDING, (COVERED COURT) BARANGAY MAAB ABACA, PIDDIG,ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk76 | —-0.044 |
| 18AA0144CONST. OF FC ALONG BISLAK RIVER SANJERAS, TAGUIPORO-MANAYON BRGY. 16 SALSALAMAGUI VINTAR, I.N. | Region I | Ilocos Norte 1st DEO | Completed | ₱4.8M | 100% | High risk76 | —-0.066 |
| 25AA0200CONVE & SPE SUP PROG - SUSTAIN INFRA PROJ ALLE GAPS (SIPAG) - ACC RDS AND/OR BR FROM THE NATL ROAD/S LEADING TO MAJOR/STRA PUBLIC BLDG/FACILITIES - CONST OF TANGAOAN-PALLAS RD LEADING TO PARAISO ECOTOURISM PROJECT ECO & REFORESTATION PROJECT, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk75 | Flagged0.006 |
| 23AA0448CONCRETING OF BRGY. MAAB-ABACA FMR, BRGY. MAAB-ABACA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 23AA0447CONCRETING OF BRGY. ARUA-AY FMR, BRGY. ARUA-AY, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.048 |
| 23AA0452CONCRETING OF BRGY. GAYAMAT TO BRGY. MARUAYA FMR, BRGY. GAYAMAT AND BRGY. MARUAYA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 22AA0154CONSTRUCTION OF MULTI-PURPOSE (SENIOR CITIZENS HEALTH BUILDING) BRGY. ANAO PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk73 | —-0.079 |
| 25A00296REPLACEMENT OF PERMANENT WEAK BRIDGES - PASALENG BR. (B00550LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱144.9M | 20% | High risk73 | Flagged0.025 |
| 20CN0124SLOPE PROTECTION ALONG NUEVA ECIJA - AURORA ROAD, K0176+200 - K0176+360 | Region III | Aurora DEO | Completed | ₱99M | 100% | High risk73 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AA0448CONCRETING OF BRGY. MAAB-ABACA FMR, BRGY. MAAB-ABACA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 23AA0452CONCRETING OF BRGY. GAYAMAT TO BRGY. MARUAYA FMR, BRGY. GAYAMAT AND BRGY. MARUAYA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 23AA0447CONCRETING OF BRGY. ARUA-AY FMR, BRGY. ARUA-AY, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.048 |
| 25AA0199CONVE & SPEC SUP PROG - SUST INFRA PROJ ALLE GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEAD TO MAJOR/STRA PUBLIC BLDGS/FAC - CONST OF MARUAYA-DUPITAC-CALAMBEG ESTANCIA RD LEAD TO LOWLAND COFFEE CONVE INITIA PROJ, BRGY. ESTANCIA, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk95 | Flagged0.046 |
| 24AA0552FLOOD MANAGEMENT PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGICPUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG GUISIT RIVER, BARANGAY MANGITAYAG, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.1M | 80% | High risk72 | Flagged0.043 |
| 24AA0553FLOOD MANAGEMENT PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGICPUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG DINGRIS RIVER, BARANGAY DUPITAC, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.5M | 89% | High risk72 | Flagged0.036 |
| 25A00245CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG - CARASI - CALANASAN ROAD, ILOCOS NORTE | Region I | Region I | On-Going | ₱136.6M | 55% | High risk94 | Flagged0.030 |
| 24A00598CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - PASUQUIN SUPER HEALTH CENTER, ILOCOS NORTE | Region I | Region I | On-Going | ₱11.7M | 61% | Medium risk53 | Flagged0.029 |
| 25AA0292CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BRGY ESTANCIA, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | Medium risk55 | Flagged0.027 |
| 23PA0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CALABA, BANGUED, | Cordillera Administrative Region | Abra DEO | On-Going | ₱96.5M | 95% | High risk81 | Flagged0.026 |
| 25A00296REPLACEMENT OF PERMANENT WEAK BRIDGES - PASALENG BR. (B00550LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱144.9M | 20% | High risk73 | Flagged0.025 |
| 25A00297WIDENING OF PERMANENT BRIDGES - INNHS IRRIGATION BR. 1 (B00553LZ) ALONG ABLAN AVE. | Region I | Region I | On-Going | ₱6.3M | 38% | High risk91 | Flagged0.018 |
| 24AA0405CONCRETING OF BRGY. CAMANGGAAN TO BRGY. RIOENG FMR, BRGY. CAMANGGAAN AND BRGY. RIOENG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.1M | 92% | High risk76 | Flagged0.017 |
| 23AA0490CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MAGDALENA CREEK, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱8M | 100% | High risk69 | Flagged0.017 |
| 17AB0235REPAIR/MAINTENANCE OF DAMAGED BANK PROTECTION ALONG BONGO RIVER, BRGY. ALBANO, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱45.8M | 100% | High risk62 | Flagged0.016 |
| 17AB0241REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) LEFT BANK, BRGY. ELIZABETH, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱47M | 100% | High risk60 | Flagged0.014 |
| 17AB0245REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) LEFT BANK, BRGY. PACIFICO, MARCOS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱45.6M | 100% | Medium risk59 | Flagged0.014 |
| 25AA0238SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE,BARANGAY 52-B LATAAG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 0% | High risk70 | Flagged0.011 |
| 25AA0239SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BRIDGE, BARANGAY 55-C VIRA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 11% | High risk69 | Flagged0.011 |
| 25AA0432CONVE AND SPE SUP PROG - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRA PUBLIC BLDG/FACILITIES - REHAB OF BIMMANGA - MANGITAYAG ROAD, BARANGAY 4 BIMMANGA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18AA0396WIDENING OF TAMUCALAO BR. 1 (B00524LZ) ALONG MNR, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱48.7M | 100% | High risk70 | —-0.038 |
| 52 | 18AA0317CONCRETING OF CABANGARAN TO ISIC-ISIC ROAD, BRGYS. CABANGARAN AND ISIC-ISIC, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱19.2M | 100% | High risk70 | —-0.082 |
| 53 | 18AA0146CONTINUATION OF FC FACILITIES/STRUCTURES UNDER THE LAOAG RIVER BASIN FC AND SABO PROJECT (LRBDCSP) | Region I | Ilocos Norte 1st DEO | Completed | ₱9.5M | 100% | High risk70 | —-0.067 |
| 54 | 24AA0062WIDENING OF PERMANENT BRIDGES - SAN MATEO BR. (B00769LZ) ALONG LAOAG-SARRAT-PIDDIG-SOLSONA RD. | Region I | Ilocos Norte 1st DEO | On-Going | ₱32.3M | 95% | High risk70 | —-0.018 |
| 55 | 25AA0238SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE,BARANGAY 52-B LATAAG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 0% | High risk70 | Flagged0.011 |
| 56 | 24AA0043ROAD WIDENING - TERTIARY ROADS - LAOAG - SARRAT - PIDDIG - SOLSONA RD - K0497 + 130 - K0498 + 500 | Region I | Ilocos Norte 1st DEO | Completed | ₱57.9M | 100% | High risk70 | —-0.076 |
| 57 | 23AA0032CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER ALONG LAOAG (SARRAT) RIVER, BARANGAY 8, SAN ANTONIO, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱19.6M | 100% | High risk69 | —-0.068 |
| 58 | 25AA0239SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BRIDGE, BARANGAY 55-C VIRA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 11% | High risk69 | Flagged0.011 |
| 59 | 23AA0023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG PADSAN RIVER BASIN, BARANGAY SAN LORENZO AND BARANGAY 10 SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.066 |
| 60 | 23AA0016WIDENING OF PERMANENT BRIDGES - DE BATAC BR. (B00772LZ) ALONG LAOAG-SARRAT-PIDDIG-SOLSONA RD., PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱67M | 86% | High risk69 | Flagged0.002 |
| 61 | 23AA0054SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES REHAB. OF STA. MATILDE - STA. CATALINA RD (INCLUDING BRIDGE, BAGO SECTION), PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 68% | High risk69 | Flagged0.009 |
| 62 | 18AA0394CONST. OF MPB/MUNICIPAL AUDITORIUM, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱14.3M | 100% | High risk69 | —-0.081 |
| 63 | 19AA0141CONC. OF ROAD, BRGY. CANAAM, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49.5M | 100% | High risk69 | —-0.077 |
| 64 | 20AA0355CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI PURPOSE BUILDING, BRGY. ANAO, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk69 | —-0.082 |
| 65 | 18AA0416WIDENING OF PERMANENT BRIDGES-BANGSIRIT BR. (B00527LZ) ALONG MNR, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱40.1M | 100% | High risk69 | —-0.040 |
| 66 | 23AA0490CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MAGDALENA CREEK, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱8M | 100% | High risk69 | Flagged0.017 |
| 67 | 24AA0191SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.064 |
| 68 | 23AA0045SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BACASA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱37.8M | 87% | High risk69 | —-0.001 |
| 69 | 25AA0202SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BARANGAY POBLACION 3, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.9M | 28% | High risk69 | Flagged0.002 |
| 70 | 22AA0156CONSTRUCTION OF EVACUATION CENTER, BARANGAY SAUD, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.8M | 100% | High risk68 | —-0.081 |
| 71 | 25A00299WIDENING OF PERMANENT BRIDGES - BAAG BR. (B04590LZ) ALONG MANILA NORTH RD (PHASE II) | Region I | Region I | On-Going | ₱9.4M | 53% | High risk67 | —-0.005 |
| 72 | 23AA0036CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - ACCESS ROAD LEADING TO THE TOURIST SPOTS AND CENTERS, BRGY. SAN JOAQUIN, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱39.2M | 100% | High risk67 | —-0.079 |
| 73 | 17AB0037CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BAGBAG BRIDGE 3 (B00814LZ) ALONG LAOAG-SARRAT-PIDDIG-SOLSONA ROAD, SOLSONA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱65M | 100% | High risk67 | —-0.021 |
| 74 | 24A00358WIDENING OF PERMANENT BRIDGES, BAAG BR. (B04590LZ) ALONG MANILA NORTH RD | Region I | Region I | Completed | ₱31.8M | 100% | High risk66 | —-0.043 |
| 75 | 24PA0040RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DON MARIANO MARCOS BRIDGE (B02229LZ) ALONG ABRA-KALINGA ROAD, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.7M | 94% | High risk63 | —-0.002 |