Contractor dossier
272 projects on file, including joint ventures this contractor is part of.
Total projects
272
Total budget
₱8.3B
Average progress
90.4%
Completion rate
79.4%
Average risk score
50.5
Medium risk on average, out of 100
Flagged as unusual
31
11.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 239 | ₱6.8B | 51.2 | 29 | 89.2% |
| Region III | 10 | ₱538.4M | 41.4 | 0 | 100.0% |
| Region IV-B | 10 | ₱219.6M | 40.2 | 0 | 100.0% |
| Cordillera Administrative Region | 6 | ₱357.5M | 56.9 | 1 | 97.1% |
| Region XIII | 3 | ₱159M | 44.1 | 0 | 100.0% |
| Region II | 2 | ₱60.8M | 49.7 | 0 | 100.0% |
| Negros Island Region | 1 | ₱96.5M | 57.7 | 0 | 100.0% |
| Region VI | 1 | ₱14.8M | 48.9 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 85 | ₱2.4B | 49.6 | 8 | 87.1% |
| Flood Control and Drainage | 74 | ₱2.3B | 52.6 | 6 | 96.7% |
| Bridges | 62 | ₱2.9B | 53.4 | 8 | 89.8% |
| Buildings and Facilities | 44 | ₱432.4M | 40.5 | 4 | 90.6% |
| OTHER | 3 | ₱148.4M | 74.9 | 2 | 97.0% |
| GAA 2025 OO-1 | 2 | ₱142.8M | 92.5 | 2 | 46.5% |
| GAA 2025 SSP | 1 | ₱9.5M | 95.2 | 1 | 0.0% |
| Water Provision and Storage | 1 | ₱978K | 23.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0199CONVE & SPEC SUP PROG - SUST INFRA PROJ ALLE GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEAD TO MAJOR/STRA PUBLIC BLDGS/FAC - CONST OF MARUAYA-DUPITAC-CALAMBEG ESTANCIA RD LEAD TO LOWLAND COFFEE CONVE INITIA PROJ, BRGY. ESTANCIA, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk95 | Flagged0.046 |
| 25A00245CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG - CARASI - CALANASAN ROAD, ILOCOS NORTE | Region I | Region I | On-Going | ₱136.6M | 55% | High risk94 | Flagged0.030 |
| 25A00297WIDENING OF PERMANENT BRIDGES - INNHS IRRIGATION BR. 1 (B00553LZ) ALONG ABLAN AVE. | Region I | Region I | On-Going | ₱6.3M | 38% | High risk91 | Flagged0.018 |
| 23PA0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CALABA, BANGUED, | Cordillera Administrative Region | Abra DEO | On-Going | ₱96.5M | 95% | High risk81 | Flagged0.026 |
| 25AA0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RIVERSIDE ROAD, LOING-CABAROAN, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0432CONVE AND SPE SUP PROG - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRA PUBLIC BLDG/FACILITIES - REHAB OF BIMMANGA - MANGITAYAG ROAD, BARANGAY 4 BIMMANGA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0299CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF ROAD, BARANGAY 22 BOYBOY, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk80 | Flagged0.009 |
| 25AA0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BRGY 54-B CAMANGAAN TO BRGY 28, L.C., I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 14% | High risk78 | —-0.017 |
| 25AA0244CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY 61 CATABAN, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 50% | High risk77 | —-0.032 |
| 24AA0334SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY 21 STA. MARIA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 96% | High risk77 | —-0.046 |
| 24AA0405CONCRETING OF BRGY. CAMANGGAAN TO BRGY. RIOENG FMR, BRGY. CAMANGGAAN AND BRGY. RIOENG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.1M | 92% | High risk76 | Flagged0.017 |
| 24AA0386BIP - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORTSOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSEBUILDING, (COVERED COURT) BARANGAY MAAB ABACA, PIDDIG,ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk76 | —-0.044 |
| 18AA0144CONST. OF FC ALONG BISLAK RIVER SANJERAS, TAGUIPORO-MANAYON BRGY. 16 SALSALAMAGUI VINTAR, I.N. | Region I | Ilocos Norte 1st DEO | Completed | ₱4.8M | 100% | High risk76 | —-0.066 |
| 25AA0200CONVE & SPE SUP PROG - SUSTAIN INFRA PROJ ALLE GAPS (SIPAG) - ACC RDS AND/OR BR FROM THE NATL ROAD/S LEADING TO MAJOR/STRA PUBLIC BLDG/FACILITIES - CONST OF TANGAOAN-PALLAS RD LEADING TO PARAISO ECOTOURISM PROJECT ECO & REFORESTATION PROJECT, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk75 | Flagged0.006 |
| 23AA0448CONCRETING OF BRGY. MAAB-ABACA FMR, BRGY. MAAB-ABACA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 23AA0447CONCRETING OF BRGY. ARUA-AY FMR, BRGY. ARUA-AY, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.048 |
| 23AA0452CONCRETING OF BRGY. GAYAMAT TO BRGY. MARUAYA FMR, BRGY. GAYAMAT AND BRGY. MARUAYA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 22AA0154CONSTRUCTION OF MULTI-PURPOSE (SENIOR CITIZENS HEALTH BUILDING) BRGY. ANAO PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk73 | —-0.079 |
| 25A00296REPLACEMENT OF PERMANENT WEAK BRIDGES - PASALENG BR. (B00550LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱144.9M | 20% | High risk73 | Flagged0.025 |
| 20CN0124SLOPE PROTECTION ALONG NUEVA ECIJA - AURORA ROAD, K0176+200 - K0176+360 | Region III | Aurora DEO | Completed | ₱99M | 100% | High risk73 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AA0448CONCRETING OF BRGY. MAAB-ABACA FMR, BRGY. MAAB-ABACA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 23AA0452CONCRETING OF BRGY. GAYAMAT TO BRGY. MARUAYA FMR, BRGY. GAYAMAT AND BRGY. MARUAYA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.049 |
| 23AA0447CONCRETING OF BRGY. ARUA-AY FMR, BRGY. ARUA-AY, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.048 |
| 25AA0199CONVE & SPEC SUP PROG - SUST INFRA PROJ ALLE GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEAD TO MAJOR/STRA PUBLIC BLDGS/FAC - CONST OF MARUAYA-DUPITAC-CALAMBEG ESTANCIA RD LEAD TO LOWLAND COFFEE CONVE INITIA PROJ, BRGY. ESTANCIA, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk95 | Flagged0.046 |
| 24AA0552FLOOD MANAGEMENT PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGICPUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG GUISIT RIVER, BARANGAY MANGITAYAG, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.1M | 80% | High risk72 | Flagged0.043 |
| 24AA0553FLOOD MANAGEMENT PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGICPUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG DINGRIS RIVER, BARANGAY DUPITAC, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.5M | 89% | High risk72 | Flagged0.036 |
| 25A00245CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG - CARASI - CALANASAN ROAD, ILOCOS NORTE | Region I | Region I | On-Going | ₱136.6M | 55% | High risk94 | Flagged0.030 |
| 24A00598CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - PASUQUIN SUPER HEALTH CENTER, ILOCOS NORTE | Region I | Region I | On-Going | ₱11.7M | 61% | Medium risk53 | Flagged0.029 |
| 25AA0292CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BRGY ESTANCIA, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | Medium risk55 | Flagged0.027 |
| 23PA0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CALABA, BANGUED, | Cordillera Administrative Region | Abra DEO | On-Going | ₱96.5M | 95% | High risk81 | Flagged0.026 |
| 25A00296REPLACEMENT OF PERMANENT WEAK BRIDGES - PASALENG BR. (B00550LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱144.9M | 20% | High risk73 | Flagged0.025 |
| 25A00297WIDENING OF PERMANENT BRIDGES - INNHS IRRIGATION BR. 1 (B00553LZ) ALONG ABLAN AVE. | Region I | Region I | On-Going | ₱6.3M | 38% | High risk91 | Flagged0.018 |
| 24AA0405CONCRETING OF BRGY. CAMANGGAAN TO BRGY. RIOENG FMR, BRGY. CAMANGGAAN AND BRGY. RIOENG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.1M | 92% | High risk76 | Flagged0.017 |
| 23AA0490CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MAGDALENA CREEK, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱8M | 100% | High risk69 | Flagged0.017 |
| 17AB0235REPAIR/MAINTENANCE OF DAMAGED BANK PROTECTION ALONG BONGO RIVER, BRGY. ALBANO, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱45.8M | 100% | High risk62 | Flagged0.016 |
| 17AB0241REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) LEFT BANK, BRGY. ELIZABETH, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱47M | 100% | High risk60 | Flagged0.014 |
| 17AB0245REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) LEFT BANK, BRGY. PACIFICO, MARCOS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱45.6M | 100% | Medium risk59 | Flagged0.014 |
| 25AA0238SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE,BARANGAY 52-B LATAAG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 0% | High risk70 | Flagged0.011 |
| 25AA0239SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BRIDGE, BARANGAY 55-C VIRA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 11% | High risk69 | Flagged0.011 |
| 25AA0432CONVE AND SPE SUP PROG - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRA PUBLIC BLDG/FACILITIES - REHAB OF BIMMANGA - MANGITAYAG ROAD, BARANGAY 4 BIMMANGA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 19EF0111RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES MACAGUA BR. (B00322PW) ALONG PUERTO PRINCESA SOUTH RD. | Region IV-B | Palawan 2nd DEO | Completed | ₱36.5M | 100% | Medium risk42 | —-0.024 |
| 202 | 18BC0032CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-CONCRETING OF ACCESS ROAD LEADING TO BEACH RESORT BRGY BAGU, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱18.7M | 100% | Medium risk42 | —-0.080 |
| 203 | 20EF0080RETROFITTING OF PERMANENT BRIDGES MAASIN BR. (B00070PW) ALONG PUERTO PRINCESA SOUTH RD. BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱34.3M | 100% | Medium risk41 | —-0.024 |
| 204 | 20AB0135CONCRETING OF AYUSAN-TAGUIPURO, BRGY. STA. RITA FMR, BRGY. STA. RITA, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱12.4M | 100% | Medium risk41 | —-0.032 |
| 205 | 20EF0062RETROFITTING OF PERMANENT BRIDGES ARAMAYWAN BR. (BOOO80PW) ALONG QUEZON-ARAMAYWAN RD., QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱29.5M | 100% | Medium risk41 | —-0.037 |
| 206 | 22AA0153CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. TANGAON, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱3M | 100% | Medium risk40 | —-0.082 |
| 207 | 20CN0123CONSTRUCTION OF SLOPE PROTECTION ALONG BALER - CASIGURAN ROAD (DINADIAWAN - CASIGURAN SECTION), K0297+060 - K0297+143, K0297+190 - K0297+300, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱53.1M | 100% | Medium risk40 | —-0.097 |
| 208 | 19AB0126CONCRETING OF BRGY. MASINTOC - BRGY. BACSIL FMR, BRGY. MASINTOC AND BRGY. BACSIL, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱10M | 100% | Medium risk40 | —-0.029 |
| 209 | 19EE0012RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES LABANGAN BRIDGE (B00033CR)ALONG CORON-BUSUANGA ROAD, KO010+172-KO010+223 CORON, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱24.7M | 100% | Medium risk40 | —-0.049 |
| 210 | 19EE0013RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES LAMORO BRIDGE II (B00339PW) ALONG EL NIDO - JCT. NEW IBAJAY ROAD, KO283+019-KO283+063 EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱17M | 100% | Medium risk40 | —-0.045 |
| 211 | 20AA0316CONSTRUCTION OF MULTI PURPOSE BUILDINGS, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4M | 100% | Medium risk40 | —-0.083 |
| 212 | 19EF0048RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES TARITIEN BR. (B00030PW) ALONG PUERTO PRINCESA SOUTH RD, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱26.5M | 100% | Medium risk40 | —-0.035 |
| 213 | 19EE0022RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES MANLALIC BRIDGE II (B00273PW) ALONG PUERTO PRINCESA NORTH ROAD, KO253+646-KO253+676 EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱11.6M | 100% | Medium risk40 | —-0.042 |
| 214 | 19EE0024RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES TABUAN BRIDGE (B00237PW) ALONG PUERTO PRINCESA NORTH ROAD, KO191+618-KO191+654 TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱17.1M | 100% | Medium risk40 | —-0.045 |
| 215 | 19EE0020RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES MALINAO BRIDGE 1 (B00194PW) ALONG JCT. PAGLAUM-BATO ROAD, KO192+381-KO192+406 TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱10.1M | 100% | Medium risk40 | —-0.042 |
| 216 | 19EE0005RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BARBACAN BRIDGE (B00226PW)ALONG PUERTO PRINCESA NORTH ROAD, KO170+215-KO170+246 ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱12.4M | 100% | Medium risk39 | —-0.042 |
| 217 | 21AA0049CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ISIC-ISIC (BRIDGE CONSTRUCTION) IN SUPPORT OF FANCY RICE PRODUCTION, AGRO PRODUCTS AND ORGANIC, AQUATIC RESOURCES (EEL, CATFISH, ETC.), ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱3.8M | 100% | Medium risk39 | —-0.042 |
| 218 | 18AC0102CONCRETING OF BRGY. NAMALPALAN FMR, BRGY. NAMALPALAN, MAGSINGAL, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.030 |
| 219 | 18AA0440WIDENING OF PERMANENT BR. - BARIT BR. (B00522LZ) ALONG MANILA NORTH ROAD, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Terminated | ₱2.1M | 100% | Medium risk38 | —-0.020 |
| 220 | 18CN0022CONSTRUCTION OF FLOOD CONTROL ALONG BUNGO RIVER, DINALUNGAN, AURORA | Region III | Aurora DEO | Completed | ₱24.5M | 100% | Medium risk37 | —-0.082 |
| 221 | 25AA0618BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, (COVERED COURT) BRGY. 8 SAN ANTONIO, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱1.9M | 0% | Medium risk37 | —-0.007 |
| 222 | 20CN0066CONSTRUCTION OF SLOPE PROTECTION ALONG MADELA - DINADIAWAN ROAD, K0410+100 - K0410+146, AURORA | Region III | Aurora DEO | Completed | ₱44.1M | 100% | Medium risk37 | —-0.098 |
| 223 | 20CN0070CONSTRUCTION OF SLOPE PROTECTION ALONG BALER - CASIGURAN ROAD (DINADIAWAN - CASIGURAN SECTION), K0292+910 - K0292+988, AURORA | Region III | Aurora DEO | Completed | ₱44.1M | 100% | Medium risk37 | —-0.098 |
| 224 | 20CN0071CONSTRUCTION OF SLOPE PROTECTION ALONG BALER - CASIGURAN ROAD (DINADIAWAN - CASIGURAN SECTION), K0302+490 - K0302+570, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱42.3M | 100% | Medium risk37 | —-0.096 |
| 225 | 20CN0069CONSTRUCTION OF SLOPE PROTECTION ALONG BALER - CASIGURAN ROAD (BALER-DINADIAWAN SECTION), K0259+735 - K0259+775, CASIGURAN, AURORA | Region III | Aurora DEO | Completed | ₱44.1M | 100% | Medium risk36 | —-0.100 |