Contractor dossier
344 projects on file, including joint ventures this contractor is part of.
Total projects
344
Total budget
₱33.4B
Average progress
96.7%
Completion rate
88.1%
Average risk score
51.2
Medium risk on average, out of 100
Flagged as unusual
21
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 184 | ₱12.5B | 45.8 | 8 | 96.8% |
| National Capital Region | 32 | ₱3.7B | 56.7 | 0 | 99.8% |
| Region VIII | 23 | ₱3.1B | 66.0 | 5 | 91.2% |
| Region IV-A | 21 | ₱2.8B | 60.0 | 2 | 90.5% |
| Region XIII | 21 | ₱2.7B | 49.0 | 1 | 97.6% |
| Region IV-B | 19 | ₱1.6B | 52.0 | 0 | 100.0% |
| Region X | 14 | ₱3.3B | 61.2 | 1 | 98.2% |
| Region I | 14 | ₱1.8B | 52.5 | 2 | 100.0% |
| Region II | 8 | ₱261.3M | 53.5 | 0 | 100.0% |
| Central Office | 6 | ₱1.3B | 74.6 | 0 | 100.0% |
| Region XI | 2 | ₱214.3M | 58.1 | 2 | 73.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 134 | ₱14.9B | 50.8 | 5 | 96.7% |
| Flood Control and Drainage | 83 | ₱6.8B | 49.7 | 3 | 97.2% |
| Buildings and Facilities | 60 | ₱4.4B | 43.4 | 1 | 99.3% |
| Bridges | 31 | ₱2.5B | 52.6 | 2 | 95.5% |
| OTHER | 16 | ₱1.9B | 72.2 | 5 | 93.9% |
| Bridges, Roads | 10 | ₱2.2B | 62.3 | 1 | 91.0% |
| Water Provision and Storage | 7 | ₱480.5M | 56.5 | 2 | 92.0% |
| GAA 2025 SSP | 3 | ₱169.2M | 94.1 | 2 | 90.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25D00103CONSTRUCTION OF KALAYAAN HOSPITAL, PHASE 3, KAWIT, CAVITE | Region IV-A | Region IV-A | On-Going | ₱80.2M | 83% | High risk95 | Flagged0.006 |
| 25CJ0276CONSTRUCTION OF ROAD AND DRAINANGE IN BARANGAY SAN ISIDRO, TARLAC CITY, TARLAC (PHASE I) | Region III | Tarlac DEO | On-Going | ₱74.3M | 88% | High risk94 | Flagged0.005 |
| 25EA0058BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, LUZON DATUM, BARANGAY HINANGGAYON, MOGPOG, MARINDUQUE (PHASE 2) | Region IV-B | Marinduque DEO | Completed | ₱14.7M | 100% | High risk93 | —-0.018 |
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24C00631DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-TARLAC CITY GENERAL HOSPITAL, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99.5M | 100% | High risk87 | Flagged0.048 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 18I00043ROAD WIDENING - PRIMARY ROADS DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE), KO834+000 - KO835+000; KO842+860 - KO844+000; KO845+000 - KO845+440; KO845+670 - KO846+081, SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk83 | —-0.007 |
| 18I00033ROAD WIDENING - PRIMARY ROADS DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE), KO870+000 - KO870+250; KO870+850 - KO871+445; KO881+000 - KO881+880; KO883+600 - KO884+862, SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk83 | —-0.008 |
| 18I00058RESTORATION OF THE DAMAGED / COLLAPSED SECTION AT STA. 857+780 - STA. 857+830, MCC-ASSISTED SNRDP CP2, TINANI - TAFT - SULAT ROAD, SAMAR | Region VIII | Region VIII | Completed | ₱92.7M | 100% | High risk83 | —-0.006 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CL0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 1 | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.009 |
| 25CL0094CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 3 | Region III | Zambales 1st DEO | On-Going | ₱107.3M | 5% | High risk80 | Flagged0.010 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
| 24N00185CONSTRUCTION OF MARINA DEVELOPMENT PROJECT, BUTUAN CITY RIVERPARK AND RIVERWALK WITH DRAINAGE AND SIDEWALKS, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱178.2M | 89% | High risk80 | Flagged0.020 |
| 24CD0271CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.001 |
| 24C00566CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TARLAC CITY URBAN DRAINAGE SYSTEM (SEGMENT E AND D), TARLAC CITY, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99M | 95% | High risk78 | —-0.002 |
| 18K00245CLUSTER 45 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS IN CDO CITY & MISAMIS ORIENTAL | Region X | Region X | Completed | ₱440M | 100% | High risk77 | Flagged0.003 |
| 24C00415NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-FLORIDABLANCA BYPASS ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱254.1M | 0% | High risk77 | Flagged0.017 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24C00631DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-TARLAC CITY GENERAL HOSPITAL, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99.5M | 100% | High risk87 | Flagged0.048 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 17IK0020ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) K0883+000-KO833+600; KO886+210-KO886+719; KO886+735-KO886+846; KO886+862-KO887+200; KO887+850-KO887+800; KO888+950-KO889+480; KO890+460-KO890+600; KO890+710-KO891+419...,KO893+230-KO894+100 | Region VIII | Samar 2nd DEO | On-Going | ₱147.9M | 100% | High risk63 | Flagged0.025 |
| 24N00185CONSTRUCTION OF MARINA DEVELOPMENT PROJECT, BUTUAN CITY RIVERPARK AND RIVERWALK WITH DRAINAGE AND SIDEWALKS, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱178.2M | 89% | High risk80 | Flagged0.020 |
| 17IK0021ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) KO847+390-KO847+500; KO847+580-KO848+080; KO855+730-KO856+200; KO858+050-KO585+539; KO869+790-KO870+000; KO870+250-KO870+850; KO871+630-KO871+950; KO874+000-KO874+200;...,KO877+770-KO877+950 | Region VIII | Samar 2nd DEO | On-Going | ₱119.6M | 100% | High risk61 | Flagged0.020 |
| 24C00415NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-FLORIDABLANCA BYPASS ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱254.1M | 0% | High risk77 | Flagged0.017 |
| 23D00037CONSTRUCTION OF MISSING LINKS / NEW ROADSSANGLEY AIRPORT ACCESS ROAD, PACKAGE C, CAVITE | Region IV-A | Region IV-A | On-Going | ₱196.5M | 10% | High risk68 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CL0094CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 3 | Region III | Zambales 1st DEO | On-Going | ₱107.3M | 5% | High risk80 | Flagged0.010 |
| 21I00056CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ACCESS ROAD FROM LITERON - ANTOL IN CALBIGA TO CANLOBO - LAYO - MAGDAWAT - PELAON OF PINABACDAO TO MABINI IN BASEY CONNECTING ...SAMAR 2ND | Region VIII | Region VIII | On-Going | ₱443.9M | 95% | High risk66 | Flagged0.010 |
| 25CL0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 1 | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.009 |
| 25D00103CONSTRUCTION OF KALAYAAN HOSPITAL, PHASE 3, KAWIT, CAVITE | Region IV-A | Region IV-A | On-Going | ₱80.2M | 83% | High risk95 | Flagged0.006 |
| 25CJ0276CONSTRUCTION OF ROAD AND DRAINANGE IN BARANGAY SAN ISIDRO, TARLAC CITY, TARLAC (PHASE I) | Region III | Tarlac DEO | On-Going | ₱74.3M | 88% | High risk94 | Flagged0.005 |
| 18A00096CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LAPAZ (BRIDGE CONSTRUCTION) LEADING TO AND IN SUPPORT OF BAGOONG AND PATIS AND OTHER AQUATIC RESOURCES, ILOCOS NORTE | Region I | Region I | Completed | ₱241.2M | 100% | High risk72 | Flagged0.004 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
| 23LA0081CONSTRUCTION OF WATER SUPPLY SYSTEM - LEVEL II, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49M | 76% | Medium risk52 | Flagged0.003 |
| 23L00025CONSTRUCTION OF MATINA RIVER CUT-OFF CHANNEL, BALUSONG SECTION, DAVAO CITY | Region XI | Region XI | On-Going | ₱165.3M | 70% | High risk65 | Flagged0.003 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 18K00245CLUSTER 45 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS IN CDO CITY & MISAMIS ORIENTAL | Region X | Region X | Completed | ₱440M | 100% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23CL0033CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BUCAO RIVER NORTH APPROACH DOWNSTREAM PHASE 1, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 97% | High risk62 | —-0.029 |
| 77 | 17IK0023ROAD WIDENING DAANG MAHARLIKA (SM) (SAN ISIDRO-SN. JUANICO BR.) KO827+600 - KO829+200; KO826+350 - KO827+000; KO830+350 - KO830+500; KO830+800 - KO831+244; KO833+800 - KO834+000; KO835+000 - KO835+350; KO840+850 - KO841+300; KO841+400 - KO841+713; KO841+7 | Region VIII | Samar 2nd DEO | Completed | ₱168M | 100% | High risk62 | —-0.024 |
| 78 | 17IK0022ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) KO788+000-KO789+000; KO808+000-KO809+000; KO811+000-KO812+839; KO786+000-KO786+432; KO787+000-KO788+000; KO807+000-KO808+000; KO815+000-KO815+550 | Region VIII | Samar 2nd DEO | Completed | ₱150.8M | 100% | High risk62 | —-0.032 |
| 79 | 18K00230CLUSTER 29 ROAD WIDENING & PAVING OF UNPAVED ROADS IN BUKIDNON | Region X | Region X | Completed | ₱388M | 100% | High risk62 | —-0.046 |
| 80 | 18K00241CLUSTER 41 CONST. OF BYPASS AND DIVERSION ROADS IN BUKIDNON | Region X | Region X | Completed | ₱274.1M | 100% | High risk62 | —-0.010 |
| 81 | 18K00240CLUSTER 40 CONST. OF MISSING LINKS/NEW ROADS IN BUKIDNON | Region X | Region X | Completed | ₱303.8M | 100% | High risk62 | —-0.048 |
| 82 | 18K00248CLUSTER 48 CONST. OF BYPASS AND DIVERSION ROADS IN CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱291M | 100% | High risk62 | —-0.032 |
| 83 | 23K00196PREVENTIVE MAINTENANCE - SECONDARY ROADS , CDO - AIRPORT - BUKIDNON RD, K1440 + 900 - K1441 + 263, K1442 + 968 - 1443 + 171, K1444 + 000 - K1444 + 958, K1459 + 440 - K1460 + 000, K1462 + 800 - K1464 + 000, K1465 + 662 - K1466 + 262, (WITH EXCEPTION) | Region X | Region X | Completed | ₱234M | 100% | High risk62 | —-0.057 |
| 84 | 18A00094NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF BAUANG-SAN FERNANDO-SAN JUAN BYPASS ROAD (BAUANG SECTION), INCL. ROW AND BRIDGE, LA UNION | Region I | Region I | Completed | ₱289.1M | 100% | High risk61 | Flagged0.001 |
| 85 | 18K00246CLUSTER 46 CONST. OF BYPASS AND DIVERSION ROADS/ CONST. OF MISSING LINKS/NEW ROADS IN BUK & MIS OR | Region X | Region X | Completed | ₱471.6M | 100% | High risk61 | —-0.046 |
| 86 | 22K00226CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAAWAN RIVER UPSTREAM OF NAAWAN BRIDGE (RIGHT SIDE), PACKAGE 3, NAAWAN, MISAMIS ORIENTAL(STA.0+000.00-STA.0+480.00) | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.056 |
| 87 | 17IK0021ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) KO847+390-KO847+500; KO847+580-KO848+080; KO855+730-KO856+200; KO858+050-KO585+539; KO869+790-KO870+000; KO870+250-KO870+850; KO871+630-KO871+950; KO874+000-KO874+200;...,KO877+770-KO877+950 | Region VIII | Samar 2nd DEO | On-Going | ₱119.6M | 100% | High risk61 | Flagged0.020 |
| 88 | 22K00227CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAAWAN RIVER UPSTREAM OF NAAWAN BRIDGE (RIGHT SIDE), PACKAGE 4, NAAWAN, MISAMIS ORIENTAL(STA.0+480.00-STA.0+900.00) | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.056 |
| 89 | 18O00012CONSTRUCTION OF C-6 NAPINDAN-M.L. QUEZON AVENUE, TAGUIG CITY | National Capital Region | National Capital Region | Completed | ₱119M | 100% | High risk61 | —-0.069 |
| 90 | 16OF0164CONSTRUCTION OF SLOPE PROTECTION IN MARIKINA RIVER VISTA REAL SUBD., BRGY. BATASAN HILLS, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱92.5M | 100% | High risk61 | —-0.025 |
| 91 | 19I00093NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROAD, DAANG MAHARLIKA (SM) (SAN ISIDRO - SAN JUANICO BR.), KO850+940 - KO851+722, KO852+200 - KO853+400, KO853+800 - KO854+000, KO857+078 - KO857+440, KO857+820 - KO858+050, KO858+539 - KO858+680,SAMAR 2ND DEO | Region VIII | Region VIII | Completed | ₱115.8M | 100% | High risk61 | —-0.075 |
| 92 | 20O00048CONSTRUCTION OF ELEVATED MULTI-PURPOSE PARK ALONG LAGUNA LAKE HIGHWAY, C-6 ROAD, BRGY. LOWER BICUTAN AND BRGY. HAGONOY | National Capital Region | National Capital Region | Completed | ₱115.5M | 100% | High risk61 | —-0.070 |
| 93 | 21O00012NETWORK DEVELOPMENT CONSTRUCTION OF MISSING LINKS/NEW ROADS LAGUNA LAKE HIGHWAY EXTENSION (PHASE 1), TAGUIG CITY | National Capital Region | National Capital Region | Completed | ₱111.9M | 100% | High risk61 | —-0.079 |
| 94 | 21O00013NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS - LAGUNA LAKE HIGHWAY EXTENSION (PHASE 2), TAGUIG CITY | National Capital Region | National Capital Region | Completed | ₱112.4M | 100% | High risk61 | —-0.079 |
| 95 | 22D00073SANGLEY AIRPORT ACCESS ROAD, PACKAGE A, CAVITE | Region IV-A | Region IV-A | Completed | ₱99.4M | 100% | High risk60 | —-0.045 |
| 96 | 22D00074SANGLEY AIRPORT ACCESS ROAD, PACKAGE B, CAVITE | Region IV-A | Region IV-A | Completed | ₱103.2M | 100% | High risk60 | —-0.045 |
| 97 | 18I00050ROAD WIDENING-DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE), KO888+000-KO888+200; KO889+480-KO890+000; KO890+000-KO890+460; KO890+600-KO890+710; KO891+410-KO891+800; KO892+000-KO892+470; KO893+190-KO893+230; KO893+230-KO894+000; KO894+100-KO894+300 | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk60 | —-0.067 |
| 98 | 20E00103CLUSTER 9- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG SAN JOSE-PORT BARTON ROAD SECTION, KO014+118.90-KO014+200; KO014+840-KO014+921.40; KO015+232-KO015+291.90; KO015+156.50-KO015+220.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱154.4M | 100% | High risk60 | —-0.054 |
| 99 | 20E00104CLUSTER 10- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG SAN JOSE-PORT BARTON ROAD SECTION, KO015+415.00-KO015+456.80; KO015+723-KO015+770.00; KO016+315-KO016+380.10; KO016+770.00-KO016+830.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱149.6M | 100% | High risk60 | —-0.054 |
| 100 | 20E00102CLUSTER 8- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG SAN JOSE-PORT BARTON ROAD SECTION, KO010+711.40-KO010+795; KO013+060-KO013+122.50; KO013+140-KO013+210; KO013+250-KO013+336.30, PALAWAN | Region IV-B | Region IV-B | Completed | ₱154.4M | 100% | Medium risk60 | —-0.054 |