Contractor dossier
344 projects on file, including joint ventures this contractor is part of.
Total projects
344
Total budget
₱33.4B
Average progress
96.7%
Completion rate
88.1%
Average risk score
51.2
Medium risk on average, out of 100
Flagged as unusual
21
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 184 | ₱12.5B | 45.8 | 8 | 96.8% |
| National Capital Region | 32 | ₱3.7B | 56.7 | 0 | 99.8% |
| Region VIII | 23 | ₱3.1B | 66.0 | 5 | 91.2% |
| Region IV-A | 21 | ₱2.8B | 60.0 | 2 | 90.5% |
| Region XIII | 21 | ₱2.7B | 49.0 | 1 | 97.6% |
| Region IV-B | 19 | ₱1.6B | 52.0 | 0 | 100.0% |
| Region X | 14 | ₱3.3B | 61.2 | 1 | 98.2% |
| Region I | 14 | ₱1.8B | 52.5 | 2 | 100.0% |
| Region II | 8 | ₱261.3M | 53.5 | 0 | 100.0% |
| Central Office | 6 | ₱1.3B | 74.6 | 0 | 100.0% |
| Region XI | 2 | ₱214.3M | 58.1 | 2 | 73.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 134 | ₱14.9B | 50.8 | 5 | 96.7% |
| Flood Control and Drainage | 83 | ₱6.8B | 49.7 | 3 | 97.2% |
| Buildings and Facilities | 60 | ₱4.4B | 43.4 | 1 | 99.3% |
| Bridges | 31 | ₱2.5B | 52.6 | 2 | 95.5% |
| OTHER | 16 | ₱1.9B | 72.2 | 5 | 93.9% |
| Bridges, Roads | 10 | ₱2.2B | 62.3 | 1 | 91.0% |
| Water Provision and Storage | 7 | ₱480.5M | 56.5 | 2 | 92.0% |
| GAA 2025 SSP | 3 | ₱169.2M | 94.1 | 2 | 90.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25D00103CONSTRUCTION OF KALAYAAN HOSPITAL, PHASE 3, KAWIT, CAVITE | Region IV-A | Region IV-A | On-Going | ₱80.2M | 83% | High risk95 | Flagged0.006 |
| 25CJ0276CONSTRUCTION OF ROAD AND DRAINANGE IN BARANGAY SAN ISIDRO, TARLAC CITY, TARLAC (PHASE I) | Region III | Tarlac DEO | On-Going | ₱74.3M | 88% | High risk94 | Flagged0.005 |
| 25EA0058BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, LUZON DATUM, BARANGAY HINANGGAYON, MOGPOG, MARINDUQUE (PHASE 2) | Region IV-B | Marinduque DEO | Completed | ₱14.7M | 100% | High risk93 | —-0.018 |
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24C00631DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-TARLAC CITY GENERAL HOSPITAL, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99.5M | 100% | High risk87 | Flagged0.048 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 18I00043ROAD WIDENING - PRIMARY ROADS DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE), KO834+000 - KO835+000; KO842+860 - KO844+000; KO845+000 - KO845+440; KO845+670 - KO846+081, SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk83 | —-0.007 |
| 18I00033ROAD WIDENING - PRIMARY ROADS DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE), KO870+000 - KO870+250; KO870+850 - KO871+445; KO881+000 - KO881+880; KO883+600 - KO884+862, SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk83 | —-0.008 |
| 18I00058RESTORATION OF THE DAMAGED / COLLAPSED SECTION AT STA. 857+780 - STA. 857+830, MCC-ASSISTED SNRDP CP2, TINANI - TAFT - SULAT ROAD, SAMAR | Region VIII | Region VIII | Completed | ₱92.7M | 100% | High risk83 | —-0.006 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CL0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 1 | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.009 |
| 25CL0094CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 3 | Region III | Zambales 1st DEO | On-Going | ₱107.3M | 5% | High risk80 | Flagged0.010 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
| 24N00185CONSTRUCTION OF MARINA DEVELOPMENT PROJECT, BUTUAN CITY RIVERPARK AND RIVERWALK WITH DRAINAGE AND SIDEWALKS, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱178.2M | 89% | High risk80 | Flagged0.020 |
| 24CD0271CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.001 |
| 24C00566CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TARLAC CITY URBAN DRAINAGE SYSTEM (SEGMENT E AND D), TARLAC CITY, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99M | 95% | High risk78 | —-0.002 |
| 18K00245CLUSTER 45 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS IN CDO CITY & MISAMIS ORIENTAL | Region X | Region X | Completed | ₱440M | 100% | High risk77 | Flagged0.003 |
| 24C00415NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-FLORIDABLANCA BYPASS ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱254.1M | 0% | High risk77 | Flagged0.017 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24C00631DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-TARLAC CITY GENERAL HOSPITAL, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99.5M | 100% | High risk87 | Flagged0.048 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 17IK0020ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) K0883+000-KO833+600; KO886+210-KO886+719; KO886+735-KO886+846; KO886+862-KO887+200; KO887+850-KO887+800; KO888+950-KO889+480; KO890+460-KO890+600; KO890+710-KO891+419...,KO893+230-KO894+100 | Region VIII | Samar 2nd DEO | On-Going | ₱147.9M | 100% | High risk63 | Flagged0.025 |
| 24N00185CONSTRUCTION OF MARINA DEVELOPMENT PROJECT, BUTUAN CITY RIVERPARK AND RIVERWALK WITH DRAINAGE AND SIDEWALKS, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱178.2M | 89% | High risk80 | Flagged0.020 |
| 17IK0021ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) KO847+390-KO847+500; KO847+580-KO848+080; KO855+730-KO856+200; KO858+050-KO585+539; KO869+790-KO870+000; KO870+250-KO870+850; KO871+630-KO871+950; KO874+000-KO874+200;...,KO877+770-KO877+950 | Region VIII | Samar 2nd DEO | On-Going | ₱119.6M | 100% | High risk61 | Flagged0.020 |
| 24C00415NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-FLORIDABLANCA BYPASS ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱254.1M | 0% | High risk77 | Flagged0.017 |
| 23D00037CONSTRUCTION OF MISSING LINKS / NEW ROADSSANGLEY AIRPORT ACCESS ROAD, PACKAGE C, CAVITE | Region IV-A | Region IV-A | On-Going | ₱196.5M | 10% | High risk68 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CL0094CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 3 | Region III | Zambales 1st DEO | On-Going | ₱107.3M | 5% | High risk80 | Flagged0.010 |
| 21I00056CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ACCESS ROAD FROM LITERON - ANTOL IN CALBIGA TO CANLOBO - LAYO - MAGDAWAT - PELAON OF PINABACDAO TO MABINI IN BASEY CONNECTING ...SAMAR 2ND | Region VIII | Region VIII | On-Going | ₱443.9M | 95% | High risk66 | Flagged0.010 |
| 25CL0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 1 | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.009 |
| 25D00103CONSTRUCTION OF KALAYAAN HOSPITAL, PHASE 3, KAWIT, CAVITE | Region IV-A | Region IV-A | On-Going | ₱80.2M | 83% | High risk95 | Flagged0.006 |
| 25CJ0276CONSTRUCTION OF ROAD AND DRAINANGE IN BARANGAY SAN ISIDRO, TARLAC CITY, TARLAC (PHASE I) | Region III | Tarlac DEO | On-Going | ₱74.3M | 88% | High risk94 | Flagged0.005 |
| 18A00096CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LAPAZ (BRIDGE CONSTRUCTION) LEADING TO AND IN SUPPORT OF BAGOONG AND PATIS AND OTHER AQUATIC RESOURCES, ILOCOS NORTE | Region I | Region I | Completed | ₱241.2M | 100% | High risk72 | Flagged0.004 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
| 23LA0081CONSTRUCTION OF WATER SUPPLY SYSTEM - LEVEL II, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49M | 76% | Medium risk52 | Flagged0.003 |
| 23L00025CONSTRUCTION OF MATINA RIVER CUT-OFF CHANNEL, BALUSONG SECTION, DAVAO CITY | Region XI | Region XI | On-Going | ₱165.3M | 70% | High risk65 | Flagged0.003 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 18K00245CLUSTER 45 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS IN CDO CITY & MISAMIS ORIENTAL | Region X | Region X | Completed | ₱440M | 100% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20E00107CLUSTER 13- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG LANGOGAN-ROXAS ROAD SECTION, KO100+310-KO100+440.00; KO101+120-KO101+202.90; KO104+060-KO104+160; KO104+560-KO104+704.10, PALAWAN | Region IV-B | Region IV-B | Completed | ₱182.4M | 100% | Medium risk60 | —-0.043 |
| 102 | 17IK0017CONST. OF ROAD SLOPE PROTECTION STRUCTURE DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE) KO791+039-KO791+076;KO794+200-KO794+231;KO795+300-KO795+315;KO795+500-KO795+545;KO815+386-KO815+430;KO868+550-KO868+738 | Region VIII | Samar 2nd DEO | Completed | ₱68.9M | 100% | Medium risk60 | —-0.052 |
| 103 | 20E00106CLUSTER 12- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG LANGOGAN-ROXAS ROAD SECTION, KO098+160-KO098+330.00; KO099+480-KO099+570; KO099+730-KO099+830.30, PALAWAN | Region IV-B | Region IV-B | Completed | ₱142.2M | 100% | Medium risk60 | —-0.053 |
| 104 | 25CL0046CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, IBA-BOTOLAN, BRIDGE 1, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱33.8M | 70% | Medium risk60 | —-0.004 |
| 105 | 17CJ0054REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG MASALASA CREEK, MALIWALO SECTION (LEFT BANK) MALIWALO, TARLAC CITY, STA 0+000 TO STA 0+523 | Region III | Tarlac DEO | Completed | ₱36.9M | 100% | Medium risk59 | —-0.006 |
| 106 | 17IK0019ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) KO878+190-KO879+180;KO879+203-KO879+265;KO879+470-KO879+680;KO880+370-KO880+515;KO880+534-KO880+726;KO881+880-KO882+100 | Region VIII | Samar 2nd DEO | Completed | ₱55M | 100% | Medium risk59 | —-0.054 |
| 107 | 17CJ0055REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG MASALASA CREEK, SAN MANUEL, TARLAC CITY, STA 0+000 TO STA 0+490 | Region III | Tarlac DEO | Completed | ₱36.3M | 100% | Medium risk59 | —-0.006 |
| 108 | 17CJ0056REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL (LEFT DIKE), TIBAG SECTION, TIBAG, TARLAC CITY, STA 0+000 - 0+370 | Region III | Tarlac DEO | Completed | ₱37.4M | 100% | Medium risk59 | —-0.006 |
| 109 | 20CI0071CONST OF ANUNAS-CUAYAN BRIDGE AT BRGY CUAYAN, ANGELES CITY,PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱43.9M | 100% | Medium risk59 | —-0.036 |
| 110 | 23A00051SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MULTI-STOREY MULTI-PURPOSE BUILDING, CITY OF SAN FERNANDO, LA UNION, PACKAGE 1 | Region I | Region I | Completed | ₱125.4M | 100% | Medium risk59 | —-0.059 |
| 111 | 17IK0018OFF CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONST. OF SAN JUANICO - BASEY - SOHOTON ROAD, KO900+659 - KO904+687 - KO907+160 | Region VIII | Samar 2nd DEO | Completed | ₱58.4M | 100% | Medium risk59 | —-0.053 |
| 112 | 18CK0002CONST OF PROTECTIVE DIKE ALONG BANGUT RIVER, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱94.5M | 100% | Medium risk59 | —-0.076 |
| 113 | 16B00075CAPITAL OUTLAY - NATIONAL BRIDGE CONSTRUCTION/REPLACEMENT PROGRAM (DESIGN AND BUILD BRIDGES): BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM 1 - DESIGN AND BUILD BRIDGES FOR LUZON, TADJI BRIDGE AND APPROACHES PHASE II INCLUDES RIGHT-OF-WAY ACQUISITION ALONG | Region II | Region II | Completed | ₱36.6M | 100% | Medium risk59 | —-0.026 |
| 114 | 17CJ0058REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL (LEFT DIKE), STA LUCIA PHASE II, STA LUCIA, GERONA, TARLAC, STA 0+000 - 0+377.50 | Region III | Tarlac DEO | Completed | ₱37.4M | 100% | Medium risk59 | —-0.005 |
| 115 | 17CJ0057REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL (LEFT DIKE), STA LUCIA PHASE I, STA LUCIA, GERONA, TARLAC, STA 0+000 - 0+377.50 | Region III | Tarlac DEO | Completed | ₱37.4M | 100% | Medium risk59 | —-0.005 |
| 116 | 24EA0084IMPROVEMENT OF MUNICIPAL WATERWORKS SYSTEM (FIRST PHASE), STA. CRUZ, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱120.6M | 100% | Medium risk58 | —-0.035 |
| 117 | 24I00313BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - TANGAO BR. (B00335SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) | Region VIII | Region VIII | On-Going | ₱89.6M | 27% | Medium risk58 | —-0.000 |
| 118 | 22C00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURES ALONG PORAC RIVER, BRGY. PIO, PORAC, PAMP., PROVINCE OF PAMP. | Region III | Region III | Completed | ₱241.3M | 100% | Medium risk58 | —-0.053 |
| 119 | 22CJ0051SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF TARLAC CITY URBAN DRAINAGE SYSTEM (PHASE 3), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.1M | 100% | Medium risk58 | —-0.077 |
| 120 | 22CJ0073SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF TARLAC CITY URBAN DRAINAGE SYSTEM (PHASE 4), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱94.6M | 100% | Medium risk58 | —-0.077 |
| 121 | 23C00054FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-FLOOD CONTROL WORKS-CONSTRUCTION OF GUAGUA PASAC RIVER, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱193M | 100% | Medium risk57 | —-0.061 |
| 122 | 18A00070CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO MAPITA TRIBAL COMMUNITY AND VIEW DECK TO NAYONG AGUILAR (YLANG-YLANG PLANTATION AND AGRI-TOURISM DESTINATION), PHASE III, BRGY. LAOAG, AGUILAR, PAN | Region I | Region I | Completed | ₱154.4M | 100% | Medium risk57 | —-0.053 |
| 123 | 21C00057FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONST. OF THE TARLAC CITY URBAN DRAINAGE SYSTEM ALONG MANILA NORTH ROAD, TARLAC CITY (PHASE I), PROVINCE OF TARLAC | Region III | Region III | Completed | ₱144.8M | 100% | Medium risk57 | —-0.063 |
| 124 | 18A00071CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO MAPITA TRIBAL COMMUNITY AND VIEW DECK TO NAYONG AGUILAR (YLANG-YLANG PLANTATION AND AGRI-TOURISM DESTINATION), PHASE IV, BRGY. LAOAG, AGUILAR, PANGA | Region I | Region I | Completed | ₱169.8M | 100% | Medium risk57 | —-0.048 |
| 125 | 23C00168CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF TARLAC CITY URBAN DRAINAGE SYSTEM (PACKAGE P), TARLAC CITY, TARLAC | Region III | Region III | Completed | ₱148.5M | 100% | Medium risk57 | —-0.062 |