Contractor dossier
344 projects on file, including joint ventures this contractor is part of.
Total projects
344
Total budget
₱33.4B
Average progress
96.7%
Completion rate
88.1%
Average risk score
51.2
Medium risk on average, out of 100
Flagged as unusual
21
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 184 | ₱12.5B | 45.8 | 8 | 96.8% |
| National Capital Region | 32 | ₱3.7B | 56.7 | 0 | 99.8% |
| Region VIII | 23 | ₱3.1B | 66.0 | 5 | 91.2% |
| Region IV-A | 21 | ₱2.8B | 60.0 | 2 | 90.5% |
| Region XIII | 21 | ₱2.7B | 49.0 | 1 | 97.6% |
| Region IV-B | 19 | ₱1.6B | 52.0 | 0 | 100.0% |
| Region X | 14 | ₱3.3B | 61.2 | 1 | 98.2% |
| Region I | 14 | ₱1.8B | 52.5 | 2 | 100.0% |
| Region II | 8 | ₱261.3M | 53.5 | 0 | 100.0% |
| Central Office | 6 | ₱1.3B | 74.6 | 0 | 100.0% |
| Region XI | 2 | ₱214.3M | 58.1 | 2 | 73.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 134 | ₱14.9B | 50.8 | 5 | 96.7% |
| Flood Control and Drainage | 83 | ₱6.8B | 49.7 | 3 | 97.2% |
| Buildings and Facilities | 60 | ₱4.4B | 43.4 | 1 | 99.3% |
| Bridges | 31 | ₱2.5B | 52.6 | 2 | 95.5% |
| OTHER | 16 | ₱1.9B | 72.2 | 5 | 93.9% |
| Bridges, Roads | 10 | ₱2.2B | 62.3 | 1 | 91.0% |
| Water Provision and Storage | 7 | ₱480.5M | 56.5 | 2 | 92.0% |
| GAA 2025 SSP | 3 | ₱169.2M | 94.1 | 2 | 90.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25D00103CONSTRUCTION OF KALAYAAN HOSPITAL, PHASE 3, KAWIT, CAVITE | Region IV-A | Region IV-A | On-Going | ₱80.2M | 83% | High risk95 | Flagged0.006 |
| 25CJ0276CONSTRUCTION OF ROAD AND DRAINANGE IN BARANGAY SAN ISIDRO, TARLAC CITY, TARLAC (PHASE I) | Region III | Tarlac DEO | On-Going | ₱74.3M | 88% | High risk94 | Flagged0.005 |
| 25EA0058BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, LUZON DATUM, BARANGAY HINANGGAYON, MOGPOG, MARINDUQUE (PHASE 2) | Region IV-B | Marinduque DEO | Completed | ₱14.7M | 100% | High risk93 | —-0.018 |
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24C00631DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-TARLAC CITY GENERAL HOSPITAL, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99.5M | 100% | High risk87 | Flagged0.048 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 18I00043ROAD WIDENING - PRIMARY ROADS DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE), KO834+000 - KO835+000; KO842+860 - KO844+000; KO845+000 - KO845+440; KO845+670 - KO846+081, SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk83 | —-0.007 |
| 18I00033ROAD WIDENING - PRIMARY ROADS DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BRIDGE), KO870+000 - KO870+250; KO870+850 - KO871+445; KO881+000 - KO881+880; KO883+600 - KO884+862, SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk83 | —-0.008 |
| 18I00058RESTORATION OF THE DAMAGED / COLLAPSED SECTION AT STA. 857+780 - STA. 857+830, MCC-ASSISTED SNRDP CP2, TINANI - TAFT - SULAT ROAD, SAMAR | Region VIII | Region VIII | Completed | ₱92.7M | 100% | High risk83 | —-0.006 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CL0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 1 | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.009 |
| 25CL0094CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 3 | Region III | Zambales 1st DEO | On-Going | ₱107.3M | 5% | High risk80 | Flagged0.010 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
| 24N00185CONSTRUCTION OF MARINA DEVELOPMENT PROJECT, BUTUAN CITY RIVERPARK AND RIVERWALK WITH DRAINAGE AND SIDEWALKS, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱178.2M | 89% | High risk80 | Flagged0.020 |
| 24CD0271CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.001 |
| 24C00566CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TARLAC CITY URBAN DRAINAGE SYSTEM (SEGMENT E AND D), TARLAC CITY, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99M | 95% | High risk78 | —-0.002 |
| 18K00245CLUSTER 45 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS IN CDO CITY & MISAMIS ORIENTAL | Region X | Region X | Completed | ₱440M | 100% | High risk77 | Flagged0.003 |
| 24C00415NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-FLORIDABLANCA BYPASS ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱254.1M | 0% | High risk77 | Flagged0.017 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24C00631DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-TARLAC CITY GENERAL HOSPITAL, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱99.5M | 100% | High risk87 | Flagged0.048 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 17IK0020ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) K0883+000-KO833+600; KO886+210-KO886+719; KO886+735-KO886+846; KO886+862-KO887+200; KO887+850-KO887+800; KO888+950-KO889+480; KO890+460-KO890+600; KO890+710-KO891+419...,KO893+230-KO894+100 | Region VIII | Samar 2nd DEO | On-Going | ₱147.9M | 100% | High risk63 | Flagged0.025 |
| 24N00185CONSTRUCTION OF MARINA DEVELOPMENT PROJECT, BUTUAN CITY RIVERPARK AND RIVERWALK WITH DRAINAGE AND SIDEWALKS, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱178.2M | 89% | High risk80 | Flagged0.020 |
| 17IK0021ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) KO847+390-KO847+500; KO847+580-KO848+080; KO855+730-KO856+200; KO858+050-KO585+539; KO869+790-KO870+000; KO870+250-KO870+850; KO871+630-KO871+950; KO874+000-KO874+200;...,KO877+770-KO877+950 | Region VIII | Samar 2nd DEO | On-Going | ₱119.6M | 100% | High risk61 | Flagged0.020 |
| 24C00415NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-FLORIDABLANCA BYPASS ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱254.1M | 0% | High risk77 | Flagged0.017 |
| 23D00037CONSTRUCTION OF MISSING LINKS / NEW ROADSSANGLEY AIRPORT ACCESS ROAD, PACKAGE C, CAVITE | Region IV-A | Region IV-A | On-Going | ₱196.5M | 10% | High risk68 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CL0094CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 3 | Region III | Zambales 1st DEO | On-Going | ₱107.3M | 5% | High risk80 | Flagged0.010 |
| 21I00056CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ACCESS ROAD FROM LITERON - ANTOL IN CALBIGA TO CANLOBO - LAYO - MAGDAWAT - PELAON OF PINABACDAO TO MABINI IN BASEY CONNECTING ...SAMAR 2ND | Region VIII | Region VIII | On-Going | ₱443.9M | 95% | High risk66 | Flagged0.010 |
| 25CL0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG MARANGLA RIVER, DOWNSTREAM, SOUTH APPROACH, BARANGAY SAN AGUSTIN, IBA, ZAMBALES PACKAGE 1 | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.009 |
| 25D00103CONSTRUCTION OF KALAYAAN HOSPITAL, PHASE 3, KAWIT, CAVITE | Region IV-A | Region IV-A | On-Going | ₱80.2M | 83% | High risk95 | Flagged0.006 |
| 25CJ0276CONSTRUCTION OF ROAD AND DRAINANGE IN BARANGAY SAN ISIDRO, TARLAC CITY, TARLAC (PHASE I) | Region III | Tarlac DEO | On-Going | ₱74.3M | 88% | High risk94 | Flagged0.005 |
| 18A00096CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LAPAZ (BRIDGE CONSTRUCTION) LEADING TO AND IN SUPPORT OF BAGOONG AND PATIS AND OTHER AQUATIC RESOURCES, ILOCOS NORTE | Region I | Region I | Completed | ₱241.2M | 100% | High risk72 | Flagged0.004 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
| 23LA0081CONSTRUCTION OF WATER SUPPLY SYSTEM - LEVEL II, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49M | 76% | Medium risk52 | Flagged0.003 |
| 23L00025CONSTRUCTION OF MATINA RIVER CUT-OFF CHANNEL, BALUSONG SECTION, DAVAO CITY | Region XI | Region XI | On-Going | ₱165.3M | 70% | High risk65 | Flagged0.003 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 18K00245CLUSTER 45 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS IN CDO CITY & MISAMIS ORIENTAL | Region X | Region X | Completed | ₱440M | 100% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 17CJ0131CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, BARBON BR. 2 (BO1959LZ) ALONG ROMULO HIGHWAY (PHASE II) | Region III | Tarlac DEO | Completed | ₱4.8M | 100% | Medium risk53 | —-0.036 |
| 152 | 20C00030NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD, TARLAC SECTION (PACKAGE 1) , PROVINCE OF TARLAC | Region III | Region III | Completed | ₱241.3M | 100% | Medium risk53 | —-0.052 |
| 153 | 18C00082LOCAL PROGRAMS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION/IMPROVEMENT/UPGRADING OF LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (PHASE 2), PAMPANGA | Region III | Region III | Completed | ₱138.9M | 100% | Medium risk53 | —-0.076 |
| 154 | 18N00010CONSTRUCTION OF MISSING LINKS, BDRY. BUKIDNON/ AGUSAN DEL NORTE (LAWAN-LAWAN SECTION), PACKAGE C, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱168.2M | 100% | Medium risk53 | —-0.067 |
| 155 | 18CI0022FLOOD MANAGEMENT PROGRAM; CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM; REHAB OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, ANGELES CITY | Region III | Pampanga 3rd DEO | Completed | ₱92.8M | 100% | Medium risk53 | —-0.077 |
| 156 | 19C00012NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD, TARLAC 2ND LEGISLATIVE DISTRICT, PROVINCE OF TARLAC | Region III | Region III | Completed | ₱144.8M | 100% | Medium risk53 | —-0.070 |
| 157 | 22C00067NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD (PACKAGE 7), PROVINCE OF TARLAC | Region III | Region III | Completed | ₱144.8M | 100% | Medium risk53 | —-0.073 |
| 158 | 17IK0015MAJOR REPAIR OF GOLDEN BRIDGE ALONG SAN JUANICO - BASEY - SOHOTON ROAD, BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱47.7M | 100% | Medium risk53 | —-0.015 |
| 159 | 19C00018NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD (PACKAGE 2), PROVINCE OF TARLAC | Region III | Region III | Completed | ₱144.8M | 100% | Medium risk53 | —-0.058 |
| 160 | 17B00035BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1-DESIGN AND BUILD BRIDGES FOR LUZON, SIGUEM BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT OF WAY ACQUISITION ALONG ARITAO-QUIRINO ROAD, KASIBU NUEVA, VIZCAYA | Region II | Region II | Completed | ₱19.4M | 100% | Medium risk53 | —-0.022 |
| 161 | 24CJ0309CONSTRUCTION OF MULTI PURPOSE BUILDING IN BRGY. BARAS BARAS, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱98M | 100% | Medium risk53 | —-0.081 |
| 162 | 20E00108CLUSTER 14- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG LANGOGAN-ROXAS ROAD SECTION, KO104+780-KO104+860; KO105+180-KO105+282; KO105+500-KO105+560.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱103M | 100% | Medium risk52 | —-0.062 |
| 163 | 22E00162PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA SOUTH ROAD, KO028+525.00-KO033+001.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk52 | —-0.061 |
| 164 | 17CJ0125CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, BILAD BR. (BO0088LZ) ALONG PANIQUI-CAMILING- WAWA ROAD | Region III | Tarlac DEO | Completed | ₱20.6M | 100% | Medium risk52 | —-0.035 |
| 165 | 18N00001CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CIRCUMFERENTIAL ROAD LEADING TO LAKE MAINIT, JABONGA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk52 | —-0.072 |
| 166 | 24CJ0328CONSTRUCTION OF MULTI PURPOSE BUILDING (TARLAC CITY CONVENTION HALL) BGY BARAS BARAS, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱98M | 100% | Medium risk52 | —-0.080 |
| 167 | 20CJ0140LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE BUILDING WEST WING BRGY. BARAS-BARAS, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱97.8M | 100% | Medium risk52 | —-0.082 |
| 168 | 23LA0081CONSTRUCTION OF WATER SUPPLY SYSTEM - LEVEL II, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49M | 76% | Medium risk52 | Flagged0.003 |
| 169 | 24CJ0325CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNATORIUM), BARANGAY BARAS-BARAS, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk52 | —-0.082 |
| 170 | 16B00072BRIDGE CONSTRUCTION/REPLACEMENT PROGRAM (BRCP) I IN LUZON: (DESIGN AND BUILD SCHEME) PHASE 2, KONGKONG BRIDGE AND APPROACHES ALONG BAMBANG-KASIBU-SOLANO ROAD, KASIBU, NUEVA VIZCAYA | Region II | Region II | Completed | ₱7M | 100% | Medium risk52 | —-0.028 |
| 171 | 22CJ0228SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNATORIUM), BRGY. BARAS-BARAS, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk51 | —-0.082 |
| 172 | 23CJ0180SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNATORIUMAUTOMATED BLEACHERS SYSTEM), BRGY. BARASBARAS, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.7M | 100% | Medium risk51 | —-0.082 |
| 173 | 23CJ0176SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNATORIUM-AHU AREAS AND FIRE PROTECTION SYSTEM), BRGY. BARAS-BARAS, TARLAC C | Region III | Tarlac DEO | Completed | ₱95.7M | 100% | Medium risk51 | —-0.082 |
| 174 | 22D00044CONSTRUCTION OF BATINO OVERPASS BRIDGE ALONG SOUTH LUZON EXPRESSWAY (SLEX) (WESTBOUND) INCLUDING APPROACHES, BARANGAY PRINZA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱49.2M | 100% | Medium risk51 | —-0.057 |
| 175 | 18OH0032SLOPE PROTECTION/BANK IMPROVEMENT OF LIBERTAD CHANNEL,MACAPAGAL BLVD TO DIOKNO BLVD,PHASE III,PASAY | National Capital Region | South Manila DEO | Completed | ₱55.2M | 100% | Medium risk51 | —-0.059 |