Contractor dossier
159 projects on file, including joint ventures this contractor is part of.
Total projects
159
Total budget
₱3.7B
Average progress
90.8%
Completion rate
78.0%
Average risk score
40.1
Medium risk on average, out of 100
Flagged as unusual
9
5.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 152 | ₱3.3B | 40.0 | 9 | 90.5% |
| Region III | 5 | ₱327.9M | 39.0 | 0 | 100.0% |
| Cordillera Administrative Region | 2 | ₱80.9M | 51.8 | 0 | 95.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 70 | ₱1.8B | 44.5 | 4 | 87.3% |
| Buildings and Facilities | 66 | ₱767.7M | 31.2 | 0 | 97.3% |
| Flood Control and Drainage | 13 | ₱630.4M | 49.0 | 1 | 87.1% |
| Water Provision and Storage | 5 | ₱42.9M | 41.7 | 1 | 80.0% |
| OTHER | 2 | ₱243.5M | 79.4 | 2 | 85.1% |
| Bridges | 2 | ₱97.2M | 49.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱70.2M | 92.9 | 1 | 1.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BH0294ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALAO EAST FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. C | Region II | Isabela 4th DEO | On-Going | ₱70.2M | 2% | High risk93 | Flagged0.014 |
| 24B00004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA | Region II | Region II | On-Going | ₱145.5M | 78% | High risk80 | Flagged0.025 |
| 24B00087OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON-CORDON-DIADI BYPASS ROAD, CORDON, ISABELA | Region II | Region II | On-Going | ₱97.9M | 92% | High risk79 | Flagged0.012 |
| 25BH0139ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NABBUAN FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. NAB | Region II | Isabela 4th DEO | On-Going | ₱70.2M | 56% | High risk74 | Flagged0.000 |
| 25BH0285BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROADS ALONG PAPAN WESTE - NAPALIONG - MINURI ROAD, WITH EXCEPTIONS, BARANGAY PAPAN W | Region II | Isabela 4th DEO | On-Going | ₱57.6M | 0% | High risk70 | —-0.001 |
| 17BK0059CONSTRUCTION/IMPROVEMENT OF SAN MARCOS (EXHIBIT CENTER) MPB SAN MARCOS, CABARROGUIS, QUIRINO | Region II | Quirino DEO | Completed | ₱5.9M | 100% | High risk68 | —-0.061 |
| 25BH0001BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. CALIMATUROD, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.9M | 27% | High risk66 | —-0.011 |
| 25BH0233CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM (ROLL-IT) - BALINTOCATOC - BANNAWAG NORTE ROAD LEADING TO SANTIAGO - SAGUDAY ROAD IN SUPPORT | Region II | Isabela 4th DEO | On-Going | ₱9.5M | 92% | High risk66 | —-0.032 |
| 25BH0234CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM (ROLL-IT) - RIZAL - SALVADOR - DIVISORIA ROAD LEADING TO MAHARLIKA HIGHWAY IN SUPPORT OF MUN | Region II | Isabela 4th DEO | On-Going | ₱9.5M | 100% | High risk66 | —-0.036 |
| 25BH0006BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. CAMARAO, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.9M | 25% | High risk66 | —-0.010 |
| 25BH0007BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. CAQUILINGAN, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.9M | 28% | High risk66 | —-0.012 |
| 25BH0305BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAPALAD FLOOD CONTROL STRUCTURE, SECTION 2, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96M | 1% | High risk62 | —-0.006 |
| 25BH0038ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BARANGCUAG FLOOD CONTROL STRUCTURE, SECTION 1,JONES, | Region II | Isabela 4th DEO | On-Going | ₱96.4M | 76% | High risk61 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20BH0162CONCRETING OF BRGY. BABARAN TO BRGY. BUSILELAO AND STA. CRUZ, ECHAGUE | Region II | Isabela 4th DEO | On-Going | ₱4.8M | 0% | Medium risk40 | Flagged0.052 |
| 24B00004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA | Region II | Region II | On-Going | ₱145.5M | 78% | High risk80 | Flagged0.025 |
| 25BH0211REPAIR/ REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS, CONCRETING OF LIMMUBONG PAPAN ESTE FMR, BRGY. LIMMUBONG PAPAN ESTE, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱14.5M | 23% | Medium risk46 | Flagged0.018 |
| 25BH0294ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALAO EAST FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. C | Region II | Isabela 4th DEO | On-Going | ₱70.2M | 2% | High risk93 | Flagged0.014 |
| 23BH0242CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. DIGUMASED, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.6M | 0% | Medium risk46 | Flagged0.013 |
| 24B00087OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON-CORDON-DIADI BYPASS ROAD, CORDON, ISABELA | Region II | Region II | On-Going | ₱97.9M | 92% | High risk79 | Flagged0.012 |
| 23BH0248SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONCRETING OF ROAD, BRGY. DABUBU GRANDE, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.6M | 100% | Medium risk40 | Flagged0.008 |
| 23BH0251SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONCRETING OF LOCAL ROAD, BRGY. PALACIAN, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱7.2M | 100% | Medium risk40 | Flagged0.007 |
| 25BH0139ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NABBUAN FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. NAB | Region II | Isabela 4th DEO | On-Going | ₱70.2M | 56% | High risk74 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BH0294ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALAO EAST FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. C | Region II | Isabela 4th DEO | On-Going | ₱70.2M | 2% | High risk93 | Flagged0.014 |
| 2 | 24B00004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA | Region II | Region II | On-Going | ₱145.5M | 78% | High risk80 | Flagged0.025 |
| 3 | 24B00087OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON-CORDON-DIADI BYPASS ROAD, CORDON, ISABELA | Region II | Region II | On-Going | ₱97.9M | 92% | High risk79 | Flagged0.012 |
| 4 | 25BH0139ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NABBUAN FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. NAB | Region II | Isabela 4th DEO | On-Going | ₱70.2M | 56% | High risk74 | Flagged0.000 |
| 5 | 25BH0285BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROADS ALONG PAPAN WESTE - NAPALIONG - MINURI ROAD, WITH EXCEPTIONS, BARANGAY PAPAN W | Region II | Isabela 4th DEO | On-Going | ₱57.6M | 0% | High risk70 | —-0.001 |
| 6 | 17BK0059CONSTRUCTION/IMPROVEMENT OF SAN MARCOS (EXHIBIT CENTER) MPB SAN MARCOS, CABARROGUIS, QUIRINO | Region II | Quirino DEO | Completed | ₱5.9M | 100% | High risk68 | —-0.061 |
| 7 | 25BH0001BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. CALIMATUROD, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.9M | 27% | High risk66 | —-0.011 |
| 8 | 25BH0233CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM (ROLL-IT) - BALINTOCATOC - BANNAWAG NORTE ROAD LEADING TO SANTIAGO - SAGUDAY ROAD IN SUPPORT | Region II | Isabela 4th DEO | On-Going | ₱9.5M | 92% | High risk66 | —-0.032 |
| 9 | 25BH0234CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM (ROLL-IT) - RIZAL - SALVADOR - DIVISORIA ROAD LEADING TO MAHARLIKA HIGHWAY IN SUPPORT OF MUN | Region II | Isabela 4th DEO | On-Going | ₱9.5M | 100% | High risk66 | —-0.036 |
| 10 | 25BH0006BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. CAMARAO, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.9M | 25% | High risk66 | —-0.010 |
| 11 | 25BH0007BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. CAQUILINGAN, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.9M | 28% | High risk66 | —-0.012 |
| 12 | 25BH0305BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAPALAD FLOOD CONTROL STRUCTURE, SECTION 2, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96M | 1% | High risk62 | —-0.006 |
| 13 | 25BH0038ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BARANGCUAG FLOOD CONTROL STRUCTURE, SECTION 1,JONES, | Region II | Isabela 4th DEO | On-Going | ₱96.4M | 76% | High risk61 | —-0.026 |
| 14 | 24B00089CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ) - K0209+(-896) - K0209+000, K0209+834 - K0210+000, K | Region II | Region II | On-Going | ₱147.6M | 96% | Medium risk59 | —-0.032 |
| 15 | 24B00097OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0215+398.70 - K0216+471.30, K0219+370.90 - K0219+897.30, K0219+967.10 - K0220+000.00, K0225+174 - K0225+459.71, K0233+1 | Region II | Region II | On-Going | ₱103.4M | 92% | Medium risk56 | —-0.040 |
| 16 | 24BI0091ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS DAANG MAHARLIKA BY PASS RD K0265+(-373) K0267+248 | Region II | Nueva Vizcaya DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.069 |
| 17 | 23PJ003223PJ0032: NATIONAL BUILDING PROGRAM -BUILDING AND OTHER STRUCTURES MULTIPURPOSE / FACILITIES - CONSTRUCTION OFIFUGAO 2ND DISTRICT ENGINEERING OFFICE MOTORPOOL BUILDING AND SITEDEVELOPMENT STRUCTURES IFUGAO, TALITE, AGUINALDO, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.072 |
| 18 | 19BK0103CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (QUIRINO PROVINCE CONVENTION CENTER), CABARROGUIS, QUIRINO | Region II | Quirino DEO | Completed | ₱49.5M | 100% | Medium risk53 | —-0.076 |
| 19 | 21BH0167WIDENING OF PERMANENT BRIDGE, SISIM BRIDGE (B04868LZ) ALONG JCT. IPIL-QUIRINO BDRY. ROAD | Region II | Isabela 4th DEO | Completed | ₱67.8M | 100% | Medium risk53 | —-0.041 |
| 20 | 25B00007OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON - CORDON - DIADI BYPASS ROAD, CORDON, ISABELA | Region II | Region II | On-Going | ₱73.5M | 70% | Medium risk51 | —-0.042 |
| 21 | 24BH0021SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SANTIAGO CITY BY- PASS ROAD,PACKAGE 1, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱57M | 56% | Medium risk51 | —-0.034 |
| 22 | 20BH0062NETWORK DEVELOPEMENT - ROAD WIDENING - TERTIARY ROADS SANTIAGO - BALUARTE-QUIRINO BDRY. ROAD - K0327 +064 - K0327+314, K0327+474 - K0329+305, K0331+000 - K0331+055 | Region II | Isabela 4th DEO | Completed | ₱60.3M | 100% | Medium risk51 | —-0.076 |
| 23 | 22CN0124CONSTRUCTION (COMPLETION) OF CONVENTION CENTER, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.077 |
| 24 | 20BH0066CONSTRUCTION OF ANNAFUNAN, STA. 0+000 - STA. 0+444 | Region II | Isabela 4th DEO | Completed | ₱65.1M | 100% | Medium risk51 | —-0.064 |
| 25 | 24BH0013ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BARANGAY PALACIAN FLOOD CO | Region II | Isabela 4th DEO | Completed | ₱62.7M | 100% | Medium risk51 | —-0.066 |