Opening the dossier…
Opening the dossier…
Contractor dossier
145 projects on file, including joint ventures this contractor is part of.
Total projects
145
Total budget
₱7.4B
Average progress
94.6%
Completion rate
80.0%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
11
7.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 75 | ₱4.8B | 54.1 | 5 | 97.0% |
| Region III | 32 | ₱1.5B | 46.1 | 2 | 93.8% |
| National Capital Region | 18 | ₱343.6M | 46.3 | 0 | 93.2% |
| Region IV-A | 12 | ₱556.1M | 50.9 | 0 | 100.0% |
| Region I | 6 | ₱238.8M | 77.1 | 4 | 59.7% |
| Region V | 2 | ₱5.9M | 27.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱5.8B | 52.0 | 5 | 94.3% |
| Flood Control and Drainage | 15 | ₱699.4M | 51.8 | 0 | 100.0% |
| Buildings and Facilities | 9 | ₱83M | 24.0 | 0 | 100.0% |
| OTHER | 3 | ₱163.1M | 59.8 | 1 | 99.5% |
| Water Provision and Storage | 3 | ₱29M | 34.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱189.2M | 94.0 | 2 | 86.1% |
| GAA 2025 OO-2 | 2 | ₱143M | 92.2 | 2 | 53.7% |
| Bridges | 2 | ₱166.2M | 55.8 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱95.5M | 95.6 | 1 | 41.0% |
| Bridges, Roads | 1 | ₱96.5M | 64.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0105CONSTRUCTION OF ROAD FROM NHJ TOMOAONG TO SITIO NAGAS, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 41% | High risk96 | Flagged0.043 |
| 25L00157PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PRES. DIOSDADO P. MACAPAGAL HI-WAY - K1719+712 - K1721+400, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱93.7M | 81% | High risk94 | Flagged0.023 |
| 25LG0051PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- PRES. DIOSDADO P. MACAPAGAL NAT'L HI-WAY 1748+500-K1749+184, K1749 + 506 - K1750 +142 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱95.5M | 92% | High risk94 | Flagged0.018 |
| 25LF0103CONSTRUCTION OF FLOOD CONTROL ALONG BOSTON RIVER (DAKUNG BANWA, SAN JOSE) BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 27% | High risk94 | Flagged0.022 |
| 25AA0130FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCURE ALONG LAOAG RIVER BASIN, BARANGAY 34-B GABU, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.5M | 81% | High risk91 | Flagged0.001 |
| 25CF0039FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF RIVER BANK STRUCTURE ALONG PAMPANGA RIVER, BARANGAY SAN PABLO, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96M | 100% | High risk80 | —-0.047 |
| 24L00206PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD - K1565 + 636 - K1566 + 561, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.014 |
| 24AA0444CONCRETING OF BRGY. NAGSUROT, BRGY. NAGSUROT FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.9M | 54% | High risk77 | Flagged0.032 |
| 24AA0472CONCRETING OF BRGY. PAYAC FMRBRGY. PAYAC, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱95.8M | 90% | High risk76 | Flagged0.027 |
| 25AA0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - COASTAL ROAD LEADING TO BANGUI VINDMILL AND MUNICIPAL BEACH, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.9M | 50% | High risk76 | —-0.004 |
| 25CF0055SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF JAEN-SAN ANTONIO ROAD, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96M | 100% | High risk75 | —-0.055 |
| 23C00411CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING PUBLIC INFRA./FACILITIES-CONST. OF FLOOD CONTROL STRUCT. AT GALAS MAASIM CREEK ALONG BYPASS RD. (PHASE II), MAASIM, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱52.3M | 100% | High risk74 | —-0.063 |
| 24AA0437CONCRETING OF TANAP - DAKKEL, BRGY. TANAP FMR, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 83% | High risk74 | Flagged0.018 |
| 25CL0049CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER (SOUTH SIDE), PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.4M | 100% | High risk74 | —-0.031 |
| 25CF0033SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF SAN LEONARDO-PEÑARANDA ROAD, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96M | 100% | High risk73 | —-0.054 |
| 25CF0116SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION / IMPROVEMENT OF GAPAN CITY CIRCUMFERENTIAL ROAD, GAPAN CITY, NUEVA | Region III | Nueva Ecija 2nd DEO | Completed | ₱72M | 100% | High risk73 | —-0.062 |
| 25AA0466CONVE & SPE SUP PROG - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF COASTAL RD LEADING TO BANGUI WINDMILL AND MUNICIPAL BEACH, BANGUI, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk70 | —-0.015 |
| 25CL0109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0219 + 740 - K0221 + 100, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 0% | High risk70 | —-0.009 |
| 24CD0304ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0065+000 K0067+000, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
| 24CD0305ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0067+000 K0069+484 ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0105CONSTRUCTION OF ROAD FROM NHJ TOMOAONG TO SITIO NAGAS, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 41% | High risk96 | Flagged0.043 |
| 24AA0444CONCRETING OF BRGY. NAGSUROT, BRGY. NAGSUROT FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.9M | 54% | High risk77 | Flagged0.032 |
| 24AA0472CONCRETING OF BRGY. PAYAC FMRBRGY. PAYAC, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱95.8M | 90% | High risk76 | Flagged0.027 |
| 25L00157PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PRES. DIOSDADO P. MACAPAGAL HI-WAY - K1719+712 - K1721+400, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱93.7M | 81% | High risk94 | Flagged0.023 |
| 25LF0103CONSTRUCTION OF FLOOD CONTROL ALONG BOSTON RIVER (DAKUNG BANWA, SAN JOSE) BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 27% | High risk94 | Flagged0.022 |
| 24AA0437CONCRETING OF TANAP - DAKKEL, BRGY. TANAP FMR, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 83% | High risk74 | Flagged0.018 |
| 25LG0051PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- PRES. DIOSDADO P. MACAPAGAL NAT'L HI-WAY 1748+500-K1749+184, K1749 + 506 - K1750 +142 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱95.5M | 92% | High risk94 | Flagged0.018 |
| 24L00206PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD - K1565 + 636 - K1566 + 561, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.014 |
| 24CD0304ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0065+000 K0067+000, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
| 24CD0305ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0067+000 K0069+484 ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
| 25AA0130FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCURE ALONG LAOAG RIVER BASIN, BARANGAY 34-B GABU, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.5M | 81% | High risk91 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 19OF0102REHABILITATION OF BANLAT ROAD, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱18.6M | 100% | Medium risk46 | —-0.099 |
| 102 | 19OF0104REHABILITATION OF BONIFACIO DRIVE, BRGY. PASONG TAMO, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.098 |
| 103 | 18LA0234CONCRETING OF ROAD AT BRGY. DUMLAN TO BRGY. LIBAYLIBAY SECTION, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.089 |
| 104 | 19LA0379CONCRETING OF ROAD, ANIBONGAN-PANGI ROAD, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱19.5M | 100% | Medium risk46 | —-0.088 |
| 105 | 18OG0016IMPROVEMENT/ REHABILITATION OF DRAINAGE SYSTEM AT 11TH JAMBOREE ST., QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.089 |
| 106 | 22OF0199CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARABGAY TANDANG SORA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱20.2M | 100% | Medium risk46 | —-0.087 |
| 107 | 20OF0039REHABILITATION OF DRAINAGE BANLAT ROAD, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.089 |
| 108 | 22OF0143CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MACEDA BRIDGE, BARANGAY TALIPAPA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.089 |
| 109 | 18LA0254CONCRETING OF ANISLAGAN ROAD, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.088 |
| 110 | 22OF0117REHABILITATION OF ROAD AT SAUYO ROAD, BARANGAY SAUYO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.098 |
| 111 | 19OG0020CONCRETING OF 11TH JAMBOREE ST., QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.099 |
| 112 | 18OG0023WIDENING OF ROAD AND DRAINAGE IMPROVEMENT OF EUGENIO LOPEZ DRIVE, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.101 |
| 113 | 21LA0107ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG SURIGAO - DAVAO COASTAL RD (SO1376MN), PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱11.8M | 100% | Medium risk46 | —-0.086 |
| 114 | 18LA0250CONCRETING OF ANIBONGAN-PANGI ROAD, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.6M | 100% | Medium risk45 | —-0.088 |
| 115 | 18OF0045CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL STRUCTURE, TRIBUTARIES AND DRAINAGE SYSTEM OF BRGY. BAGONG SILANGAN (PHASE 4), Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱46.1M | 100% | Medium risk45 | —-0.085 |
| 116 | 23L00155TAGUM - PANABO CIRCUM. RD. - K1508+000 - K1508+593 | Region XI | Region XI | Completed | ₱12.5M | 100% | Medium risk45 | —-0.092 |
| 117 | 23L00154TAGUM - PANABO CIRCUM RD - K1504+000 - K1504+216 | Region XI | Region XI | Completed | ₱11.6M | 100% | Medium risk45 | —-0.092 |
| 118 | 19LA0451CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY TWELVE (12) CLASSROOMS BUILDING AT PANTUKAN ES, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱42M | 100% | Medium risk44 | —-0.031 |
| 119 | 22DB0144CONCRETING OF BRGY. HUMAYINGAN FMR, BRGY. HUMAYINGAN, LIAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.054 |
| 120 | 24CD0149IMPROVEMENT OF ROAD, BARANGAY PULONG BUHANGIN BARANGAY BALASING BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk38 | —-0.103 |
| 121 | 24CJ0382ASPHALT OVERLAY ALONG TARLAC CITY-SN JOSE VIA TIBAG-BURGOS RD - K0133+590 - K0134+000, K0135+539 - K0136+100 | Region III | Tarlac DEO | Completed | ₱70.2M | 100% | Medium risk38 | —-0.031 |
| 122 | 23CF0074ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0092+617-K0093+755.99 | Region III | Nueva Ecija 2nd DEO | Completed | ₱60.5M | 100% | Medium risk38 | —-0.099 |
| 123 | 24CJ0380ASPHALT OVERLAY ALONG TARLAC CITY-SN JOSE VIA TIBAG-BURGOS RD - K0132+610 - K0133+590 | Region III | Tarlac DEO | Completed | ₱72.4M | 100% | Medium risk38 | —-0.031 |
| 124 | 23CF0048ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS +- JOSE ABAD SANTOS AVE (JASA) - K0 111+170-K0 111+1091, K0 112+934.35-K0 113+753 | Region III | Nueva Ecija 2nd DEO | Completed | ₱47.3M | 100% | Medium risk36 | —-0.102 |
| 125 | 23CF0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, GAPAN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱9.7M | 100% | Medium risk35 | —-0.069 |