Contractor dossier
145 projects on file, including joint ventures this contractor is part of.
Total projects
145
Total budget
₱7.4B
Average progress
94.6%
Completion rate
80.0%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
11
7.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 75 | ₱4.8B | 54.1 | 5 | 97.0% |
| Region III | 32 | ₱1.5B | 46.1 | 2 | 93.8% |
| National Capital Region | 18 | ₱343.6M | 46.3 | 0 | 93.2% |
| Region IV-A | 12 | ₱556.1M | 50.9 | 0 | 100.0% |
| Region I | 6 | ₱238.8M | 77.1 | 4 | 59.7% |
| Region V | 2 | ₱5.9M | 27.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱5.8B | 52.0 | 5 | 94.3% |
| Flood Control and Drainage | 15 | ₱699.4M | 51.8 | 0 | 100.0% |
| Buildings and Facilities | 9 | ₱83M | 24.0 | 0 | 100.0% |
| OTHER | 3 | ₱163.1M | 59.8 | 1 | 99.5% |
| Water Provision and Storage | 3 | ₱29M | 34.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱189.2M | 94.0 | 2 | 86.1% |
| GAA 2025 OO-2 | 2 | ₱143M | 92.2 | 2 | 53.7% |
| Bridges | 2 | ₱166.2M | 55.8 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱95.5M | 95.6 | 1 | 41.0% |
| Bridges, Roads | 1 | ₱96.5M | 64.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0105CONSTRUCTION OF ROAD FROM NHJ TOMOAONG TO SITIO NAGAS, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 41% | High risk96 | Flagged0.043 |
| 25L00157PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PRES. DIOSDADO P. MACAPAGAL HI-WAY - K1719+712 - K1721+400, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱93.7M | 81% | High risk94 | Flagged0.023 |
| 25LG0051PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- PRES. DIOSDADO P. MACAPAGAL NAT'L HI-WAY 1748+500-K1749+184, K1749 + 506 - K1750 +142 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱95.5M | 92% | High risk94 | Flagged0.018 |
| 25LF0103CONSTRUCTION OF FLOOD CONTROL ALONG BOSTON RIVER (DAKUNG BANWA, SAN JOSE) BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 27% | High risk94 | Flagged0.022 |
| 25AA0130FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCURE ALONG LAOAG RIVER BASIN, BARANGAY 34-B GABU, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.5M | 81% | High risk91 | Flagged0.001 |
| 25CF0039FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF RIVER BANK STRUCTURE ALONG PAMPANGA RIVER, BARANGAY SAN PABLO, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96M | 100% | High risk80 | —-0.047 |
| 24L00206PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD - K1565 + 636 - K1566 + 561, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.014 |
| 24AA0444CONCRETING OF BRGY. NAGSUROT, BRGY. NAGSUROT FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.9M | 54% | High risk77 | Flagged0.032 |
| 24AA0472CONCRETING OF BRGY. PAYAC FMRBRGY. PAYAC, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱95.8M | 90% | High risk76 | Flagged0.027 |
| 25AA0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - COASTAL ROAD LEADING TO BANGUI VINDMILL AND MUNICIPAL BEACH, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.9M | 50% | High risk76 | —-0.004 |
| 25CF0055SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF JAEN-SAN ANTONIO ROAD, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96M | 100% | High risk75 | —-0.055 |
| 23C00411CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING PUBLIC INFRA./FACILITIES-CONST. OF FLOOD CONTROL STRUCT. AT GALAS MAASIM CREEK ALONG BYPASS RD. (PHASE II), MAASIM, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱52.3M | 100% | High risk74 | —-0.063 |
| 24AA0437CONCRETING OF TANAP - DAKKEL, BRGY. TANAP FMR, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 83% | High risk74 | Flagged0.018 |
| 25CL0049CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER (SOUTH SIDE), PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.4M | 100% | High risk74 | —-0.031 |
| 25CF0033SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF SAN LEONARDO-PEÑARANDA ROAD, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96M | 100% | High risk73 | —-0.054 |
| 25CF0116SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION / IMPROVEMENT OF GAPAN CITY CIRCUMFERENTIAL ROAD, GAPAN CITY, NUEVA | Region III | Nueva Ecija 2nd DEO | Completed | ₱72M | 100% | High risk73 | —-0.062 |
| 25AA0466CONVE & SPE SUP PROG - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF COASTAL RD LEADING TO BANGUI WINDMILL AND MUNICIPAL BEACH, BANGUI, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 0% | High risk70 | —-0.015 |
| 25CL0109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0219 + 740 - K0221 + 100, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 0% | High risk70 | —-0.009 |
| 24CD0304ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0065+000 K0067+000, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
| 24CD0305ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0067+000 K0069+484 ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0105CONSTRUCTION OF ROAD FROM NHJ TOMOAONG TO SITIO NAGAS, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 41% | High risk96 | Flagged0.043 |
| 24AA0444CONCRETING OF BRGY. NAGSUROT, BRGY. NAGSUROT FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.9M | 54% | High risk77 | Flagged0.032 |
| 24AA0472CONCRETING OF BRGY. PAYAC FMRBRGY. PAYAC, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱95.8M | 90% | High risk76 | Flagged0.027 |
| 25L00157PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PRES. DIOSDADO P. MACAPAGAL HI-WAY - K1719+712 - K1721+400, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱93.7M | 81% | High risk94 | Flagged0.023 |
| 25LF0103CONSTRUCTION OF FLOOD CONTROL ALONG BOSTON RIVER (DAKUNG BANWA, SAN JOSE) BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.5M | 27% | High risk94 | Flagged0.022 |
| 24AA0437CONCRETING OF TANAP - DAKKEL, BRGY. TANAP FMR, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 83% | High risk74 | Flagged0.018 |
| 25LG0051PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- PRES. DIOSDADO P. MACAPAGAL NAT'L HI-WAY 1748+500-K1749+184, K1749 + 506 - K1750 +142 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱95.5M | 92% | High risk94 | Flagged0.018 |
| 24L00206PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD - K1565 + 636 - K1566 + 561, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.014 |
| 24CD0304ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0065+000 K0067+000, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
| 24CD0305ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0067+000 K0069+484 ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.005 |
| 25AA0130FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCURE ALONG LAOAG RIVER BASIN, BARANGAY 34-B GABU, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.5M | 81% | High risk91 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23CF0116CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱9.7M | 100% | Medium risk35 | —-0.069 |
| 127 | 23CL0004ROAD WIDENING - SECONDARY ROADS, OLONGAPO-BUGALLON RD - K0162 + 926 - K0163 + 097, K0 158+286- K0158+640, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱17M | 100% | Medium risk35 | —-0.098 |
| 128 | 22CF0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PEÑARANDA RIVER, STA. 22+276.60-STA. 22+569.00, BRGY. CALLOS, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱48M | 100% | Medium risk35 | —-0.089 |
| 129 | 23CF0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BAYANIHAN, GAPAN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱14.6M | 100% | Medium risk34 | —-0.105 |
| 130 | 22CF0073CONSTRUCTION OF PEÑARANDA RIVER CONTROL, BRGY. BURGOS, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.089 |
| 131 | 23CF0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, CABIAO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱9.7M | 100% | Medium risk33 | —-0.069 |
| 132 | 23CF0047ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - K0 113+753-K0 114+911 | Region III | Nueva Ecija 2nd DEO | Completed | ₱21.9M | 100% | Medium risk32 | —-0.105 |
| 133 | 23CL0079CONSTRUCTION OF ROAD AT LUPANG PANGAKO ROAD, BARANGAY SAN AGUSTIN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱7.8M | 100% | Medium risk32 | —-0.096 |
| 134 | 23CL0013PREVENTIVE MAINTENANCE-SECONDARY ROADS OLONGAPO-BUGALLON ROAD-K0192 + 000 - K0192 +324.20 | Region III | Zambales 1st DEO | Completed | ₱6.8M | 100% | Medium risk32 | —-0.095 |
| 135 | 23CL0012PREVENTIVE MAINTENANCE-SECONDARY ROADS OLONGAPO-BUGALLON ROAD - K0167 + 175.40 - K0167 + 452 | Region III | Zambales 1st DEO | Completed | ₱8M | 100% | Medium risk32 | —-0.094 |
| 136 | 21FF0016CONSTRUCTION OF BARANGAY ROAD BARANGAY TABUCO NAGA CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱2.9M | 100% | Low risk28 | —-0.098 |
| 137 | 21FF0014CONSTRUCTION OF BARANGAY ROAD, CURRY PILI CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱3M | 100% | Low risk27 | —-0.098 |
| 138 | 23CF0125CONSTRUCTION OF 1STY3CL, SAN ISIDRO CS | Region III | Nueva Ecija 2nd DEO | Completed | ₱6.5M | 100% | Low risk25 | —-0.052 |
| 139 | 18LA0175CONSTRUCTION OF MPB (BRGY. HALL) TAMBONGON, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱4.1M | 100% | Low risk15 | —-0.088 |
| 140 | 23CL0001PREVENTIVE MAINTENANCE-SECONDARY ROADS OLONGAPO-BUGALLON ROAD K0- 164+930-K0165+081 | Region III | Zambales 1st DEO | Completed | ₱4.4M | 100% | Low risk15 | —-0.093 |
| 141 | 18LA0211CONSTRUCTION OF MPB, BONGBONG, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.6M | 100% | Low risk15 | —-0.088 |
| 142 | 23CL0014PREVENTIVE MAINTENANCE-TERTIARY ROADS AMUNGAN-PALAUIG-BANLOG ROAD - K0211 + (-411) - K0211 + (-3212.40) | Region III | Zambales 1st DEO | Completed | ₱2.8M | 100% | Low risk14 | —-0.090 |
| 143 | 18LA0168CONSTRUCTION OF TWO (2) CLASSROOM SCHOOL BUILDING WITH CR, MADRASAH, BRGY. BONGBONG, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.4M | 100% | Low risk14 | —-0.089 |
| 144 | 21LA0242CONSTRUCTION (COMPLETION) OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM SCHOOL BUILDING AT GUISOK ES, MAWAB, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱169.4K | 100% | Low risk12 | —-0.033 |
| 145 | 21LA0239CONSTRUCTION (COMPLETION) OF ONE (1) UNIT, ONE (1) STOREY, THREE (3) CLASSROOM SCHOOL BUILDING AT MANIPONGOL ES, MACO, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱614.7K | 100% | Low risk10 | —-0.042 |