56 projects on file, including joint ventures this contractor is part of.
Total projects
56
Total budget
₱6.3B
Average progress
87.5%
Completion rate
66.1%
Below 70%
Average risk score
58.1
Medium risk on average, out of 100
Flagged as unusual
11
19.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 29 | ₱2.8B | 55.0 | 2 | 99.5% |
| Region IV-B | 13 | ₱2B | 62.3 | 6 | 85.1% |
| Region XI | 4 | ₱277.1M | 54.9 | 0 | 95.5% |
| Region VII | 3 | ₱231.5M | 59.2 | 1 | 83.6% |
| Region IV-A | 2 | ₱285.2M | 65.5 | 0 | 19.8% |
| Region I | 1 | ₱144M | 73.6 | 1 | 0.1% |
| Region V | 1 | ₱120.6M | 65.6 | 0 | 100.0% |
| National Capital Region | 1 | ₱143M | 63.3 | 1 | 0.1% |
| Region III | 1 | ₱193M | 62.4 | 0 | 37.0% |
| Region VI | 1 | ₱102.6M | 59.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 46 | ₱4B | 55.4 | 3 | 91.8% |
| Flood Control and Drainage | 4 | ₱552M | 65.1 | 2 | 86.2% |
| Buildings and Facilities | 3 | ₱688M | 65.6 | 3 | 27.5% |
| OTHER | 2 | ₱1B | 79.2 | 2 | 85.8% |
| GAA 2025 SSP | 1 | ₱78.1M | 94.4 | 1 | 78.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EE0058CONSTRUCTION OF SLOPE PROTECTION AT THE NEWLY BUILT CORON SPORTS COMPLEX, CORON, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱78.1M | 78% | High risk94 | Flagged0.028 |
| 24I00327LOCAL PROGRAM (LP) - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF TACLOBAN AIRPORT PASSENGER TERMINAL BUILDING PHASE 3, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱964.3M | 84% | High risk85 | Flagged0.035 |
| 24HC0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS-ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, HINLAYAGAN ILAYA TO B | Region VII | Bohol 2nd DEO | On-Going | ₱77.2M | 87% | High risk74 | Flagged0.009 |
| 25AE0070BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE FACILITIES INCLUDING SITE DEVELOPMENT, SAN FERNANDO, LA UNION (RE-ADVERTISEMENT) | Region I | La Union 1st DEO | On-Going | ₱144M | 0% | High risk74 | Flagged0.028 |
| 24E00131SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM LEFTSIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.4M | 87% | High risk66 | Flagged0.010 |
| 24E00130SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM RIGHTIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱147.1M | 93% | High risk66 | Flagged0.007 |
| 24E00127SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TANABAG RIVER WATERWAY (UPSTREAMN RIGHTSIDE), PALAWAN | Region IV-B | Region IV-B | Completed | ₱154.4M | 100% | High risk66 | —-0.037 |
| 18F00008OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, PRIMARY ROADS, DAANG MAHARLIKA, K0565+638.50-K0565+811, K0565+845-K0567+330, K0567+351-K0569+384, K0569+414-K0570+079, SORSOGON | Region V | Region V | Completed | ₱120.6M | 100% | High risk66 | —-0.085 |
| 24D00197CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 1, CARMONA CITY, CAVITE | Region IV-A | Region IV-A | On-Going | ₱142.6M | 20% | High risk65 | —-0.026 |
| 24D00198CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 2, CARMONA CITY, CAVITE | Region IV-A | Region IV-A | On-Going | ₱142.6M | 20% | High risk65 | —-0.026 |
| 21I00072CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL ROAD, K1117+100 - K1117+390, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱140.9M | 100% | High risk64 | —-0.067 |
| 23O00080RETROFITTING OF COA MAINBUILDING NOS. 1 AND 2 | National Capital Region | National Capital Region | On-Going | ₱143M | 0% | High risk63 | Flagged0.043 |
| 23C00105CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RDS./S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF R0AD, BRGY. LIYANG, PILAR TO BRGY. BILOLO, ORION, BATAAN (PACKAGE 1) | Region III | Region III | On-Going | ₱193M | 37% | High risk62 | —-0.019 |
| 21I00061ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD - K1069+300 - K1069+440, PALOMPON, LEYTE | Region VIII | Region VIII | Completed | ₱137.4M | 100% | High risk61 | —-0.072 |
| 21I00062ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL RD. - K1116+782 - K1116+900, ISABEL, LEYTE | Region VIII | Region VIII | Completed | ₱137.4M | 100% | High risk61 | —-0.061 |
| 25EE0052CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LAMORO BRIDGE III, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱96.1M | 65% | High risk61 | —-0.008 |
| 17IF0078ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS ALONG LIBUNGAO-MATAG-OB-PALOMPON ROAD, K0992+000-K0995+580.5;K0999+000-K1002+658 | Region VIII | Leyte 4th DEO | Completed | ₱59.4M | 100% | High risk60 | —-0.001 |
| 18E00032PAVING OF UNPAVED ROADS - QUEZON PUNTA BAJA ROAD, KO193+049-KO196+320; KO196+457-KO196+976; KO197+352-KO197+580, QUEZON, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.3M | 100% | High risk60 | —-0.035 |
| 18E00029PAVING OF UNPAVED ROADS-PALAWAN CIRCUM. ROAD, KO232+764-KO232+900; KO233+090-KO236+098; KO236+417-KO236+694; KO211+625-KO212+089; KO212+257-KO212+312, RIZAL, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.4M | 100% | High risk60 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23O00080RETROFITTING OF COA MAINBUILDING NOS. 1 AND 2 | National Capital Region | National Capital Region | On-Going | ₱143M | 0% | High risk63 | Flagged0.043 |
| 24I00327LOCAL PROGRAM (LP) - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF TACLOBAN AIRPORT PASSENGER TERMINAL BUILDING PHASE 3, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱964.3M | 84% | High risk85 | Flagged0.035 |
| 25EE0058CONSTRUCTION OF SLOPE PROTECTION AT THE NEWLY BUILT CORON SPORTS COMPLEX, CORON, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱78.1M | 78% | High risk94 | Flagged0.028 |
| 25AE0070BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE FACILITIES INCLUDING SITE DEVELOPMENT, SAN FERNANDO, LA UNION (RE-ADVERTISEMENT) | Region I | La Union 1st DEO | On-Going | ₱144M | 0% | High risk74 | Flagged0.028 |
| 24E00131SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM LEFTSIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.4M | 87% | High risk66 | Flagged0.010 |
| 17E00038ROAD UPGRADING (UNPAVED TO PAVED) PALAWAN CIRCUMFERENTIAL ROAD, KO228+656.00 - KO232+764.00; KO233+025.00 - KO233+090.00, RIZAL, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.3M | 100% | Medium risk53 | Flagged0.010 |
| 17E00037ROAD UPGRADING OF PALAWAN CIRCUMFERENTIAL ROAD K0224+503 - K0224+660; K0224+800-K0228+656, RIZAL, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.3M | 100% | Medium risk53 | Flagged0.009 |
| 24HC0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS-ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, HINLAYAGAN ILAYA TO B | Region VII | Bohol 2nd DEO | On-Going | ₱77.2M | 87% | High risk74 | Flagged0.009 |
| 24E00130SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM RIGHTIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱147.1M | 93% | High risk66 | Flagged0.007 |
| 24E00146CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONST. OF AIRPORT FACILITY, BUSUANGA AIRPORT, CORON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱400.9M | 82% | Medium risk60 | Flagged0.007 |
| 17IL0057ASPHALT OVERLAY AT DAANG MAHARLIKA (LT) K1004+(-031.00)-K1007+357.00 SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47.8M | 100% | Medium risk57 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25EE0058CONSTRUCTION OF SLOPE PROTECTION AT THE NEWLY BUILT CORON SPORTS COMPLEX, CORON, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱78.1M | 78% | High risk94 | Flagged0.028 |
| 2 | 24I00327LOCAL PROGRAM (LP) - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF TACLOBAN AIRPORT PASSENGER TERMINAL BUILDING PHASE 3, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱964.3M | 84% | High risk85 | Flagged0.035 |
| 3 | 24HC0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS-ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, HINLAYAGAN ILAYA TO B | Region VII | Bohol 2nd DEO | On-Going | ₱77.2M | 87% | High risk74 | Flagged0.009 |
| 4 | 25AE0070BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE FACILITIES INCLUDING SITE DEVELOPMENT, SAN FERNANDO, LA UNION (RE-ADVERTISEMENT) | Region I | La Union 1st DEO | On-Going | ₱144M | 0% | High risk74 | Flagged0.028 |
| 5 | 24E00131SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM LEFTSIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.4M | 87% | High risk66 | Flagged0.010 |
| 6 | 24E00130SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (UPSTREAM RIGHTIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱147.1M | 93% | High risk66 | Flagged0.007 |
| 7 | 24E00127SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TANABAG RIVER WATERWAY (UPSTREAMN RIGHTSIDE), PALAWAN | Region IV-B | Region IV-B | Completed | ₱154.4M | 100% | High risk66 | —-0.037 |
| 8 | 18F00008OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, PRIMARY ROADS, DAANG MAHARLIKA, K0565+638.50-K0565+811, K0565+845-K0567+330, K0567+351-K0569+384, K0569+414-K0570+079, SORSOGON | Region V | Region V | Completed | ₱120.6M | 100% | High risk66 | —-0.085 |
| 9 | 24D00197CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 1, CARMONA CITY, CAVITE | Region IV-A | Region IV-A | On-Going | ₱142.6M | 20% | High risk65 | —-0.026 |
| 10 | 24D00198CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 2, CARMONA CITY, CAVITE | Region IV-A | Region IV-A | On-Going | ₱142.6M | 20% | High risk65 | —-0.026 |
| 11 | 21I00072CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL ROAD, K1117+100 - K1117+390, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱140.9M | 100% | High risk64 | —-0.067 |
| 12 | 23O00080RETROFITTING OF COA MAINBUILDING NOS. 1 AND 2 | National Capital Region | National Capital Region | On-Going | ₱143M | 0% | High risk63 | Flagged0.043 |
| 13 | 23C00105CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RDS./S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF R0AD, BRGY. LIYANG, PILAR TO BRGY. BILOLO, ORION, BATAAN (PACKAGE 1) | Region III | Region III | On-Going | ₱193M | 37% | High risk62 | —-0.019 |
| 14 | 21I00061ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD - K1069+300 - K1069+440, PALOMPON, LEYTE | Region VIII | Region VIII | Completed | ₱137.4M | 100% | High risk61 | —-0.072 |
| 15 | 21I00062ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL RD. - K1116+782 - K1116+900, ISABEL, LEYTE | Region VIII | Region VIII | Completed | ₱137.4M | 100% | High risk61 | —-0.061 |
| 16 | 25EE0052CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LAMORO BRIDGE III, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱96.1M | 65% | High risk61 | —-0.008 |
| 17 | 17IF0078ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS ALONG LIBUNGAO-MATAG-OB-PALOMPON ROAD, K0992+000-K0995+580.5;K0999+000-K1002+658 | Region VIII | Leyte 4th DEO | Completed | ₱59.4M | 100% | High risk60 | —-0.001 |
| 18 | 18E00032PAVING OF UNPAVED ROADS - QUEZON PUNTA BAJA ROAD, KO193+049-KO196+320; KO196+457-KO196+976; KO197+352-KO197+580, QUEZON, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.3M | 100% | High risk60 | —-0.035 |
| 19 | 18E00029PAVING OF UNPAVED ROADS-PALAWAN CIRCUM. ROAD, KO232+764-KO232+900; KO233+090-KO236+098; KO236+417-KO236+694; KO211+625-KO212+089; KO212+257-KO212+312, RIZAL, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.4M | 100% | High risk60 | —-0.036 |
| 20 | 18E00024ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE K0115+949 TO K0118+000, ROXAS, PALAWAN | Region IV-B | Region IV-B | Completed | ₱162.4M | 100% | Medium risk60 | —-0.034 |
| 21 | 24E00146CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONST. OF AIRPORT FACILITY, BUSUANGA AIRPORT, CORON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱400.9M | 82% | Medium risk60 | Flagged0.007 |
| 22 | 18IF0086ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS ALONG PALO - CARIGARA - ORMOC ROAD, K0996+335 - K0998+916 | Region VIII | Leyte 4th DEO | Completed | ₱94.5M | 100% | Medium risk59 | —-0.085 |
| 23 | 18IF0087ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS ALONG PALOMPON - ISABEL - MERIDA - ORMOC ROAD, K1119+349 - K1124+1000 | Region VIII | Leyte 4th DEO | Completed | ₱94.3M | 100% | Medium risk59 | —-0.085 |
| 24 | 18G00036ROAD WIDENING - AKLAN WEST RD (KALIBO - NABAS) K0238+662 - K0240+500, K0240+680 - K0240+929, K0242+200 - K0243+490 | Region VI | Region VI | Completed | ₱102.6M | 100% | Medium risk59 | —-0.058 |
| 25 | 19I00007ASSET PRESERVATION - PREVENTIVE MAINT. - SECONDARY ROADS, ORMOC - BAYBAY - SOUTHERN LEYTE BDRY. RD., K1113+170 - K1118+000 (S00197LT), LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱119M | 100% | Medium risk59 | —-0.081 |