Contractor dossier
222 projects on file, including joint ventures this contractor is part of.
Total projects
222
Total budget
₱2.2B
Average progress
96.7%
Completion rate
92.8%
Average risk score
34.7
Medium risk on average, out of 100
Flagged as unusual
1
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 222 | ₱2.2B | 34.7 | 1 | 96.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Water Provision and Storage | 83 | ₱259.7M | 29.6 | 0 | 97.6% |
| Buildings and Facilities | 74 | ₱408.1M | 34.1 | 0 | 98.0% |
| Roads | 54 | ₱1.4B | 41.4 | 1 | 94.7% |
| Flood Control and Drainage | 6 | ₱40.6M | 37.8 | 0 | 100.0% |
| Bridges | 3 | ₱29.8M | 47.6 | 0 | 71.7% |
| OTHER | 1 | ₱41.5M | 68.9 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱49M | 52.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANTIPOLO, STA. TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 78% | High risk74 | —-0.034 |
| 25DC0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY CUTA EAST, SANTA TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 100% | High risk74 | —-0.046 |
| 25DC0101CONVERGENCE AND SPECIAL SUPPORT PROPGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SYSTEM, BARANGAY SAN PEDRO 1, MALVAR, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 74% | High risk70 | —-0.013 |
| 20DC0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, SAN PEDRO-STA. CRUZ ECOTOURISM ROAD LEADING TO NATIONAL SHRINE OF ST. PADRE PIO, STO. TOMAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱41.5M | 100% | High risk69 | —-0.043 |
| 24DE0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, TINGLOY CIRCUMFERENTIAL ROAD, BATANGAS PACK | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.1M | 0% | High risk61 | —-0.027 |
| 25DE0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 19% | High risk61 | —-0.041 |
| 22DC0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MALVAR-BALETE DIVERSION RO | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.095 |
| 20DC0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (BALETE-MATAAS NA KAHOY SECTION), BALETE AND MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DC0156CONCRETING OF BRGY. BIHIS TO BRGY. BUROL FMR, BRGY. BIHIS AND BRGY. BUROL, SANTA TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱15.4M | 54% | Medium risk48 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANTIPOLO, STA. TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 78% | High risk74 | —-0.034 |
| 2 | 25DC0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY CUTA EAST, SANTA TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 100% | High risk74 | —-0.046 |
| 3 | 25DC0101CONVERGENCE AND SPECIAL SUPPORT PROPGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SYSTEM, BARANGAY SAN PEDRO 1, MALVAR, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 74% | High risk70 | —-0.013 |
| 4 | 20DC0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, SAN PEDRO-STA. CRUZ ECOTOURISM ROAD LEADING TO NATIONAL SHRINE OF ST. PADRE PIO, STO. TOMAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱41.5M | 100% | High risk69 | —-0.043 |
| 5 | 24DE0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, TINGLOY CIRCUMFERENTIAL ROAD, BATANGAS PACK | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.1M | 0% | High risk61 | —-0.027 |
| 6 | 25DE0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 19% | High risk61 | —-0.041 |
| 7 | 22DC0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MALVAR-BALETE DIVERSION RO | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.095 |
| 8 | 20DC0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (BALETE-MATAAS NA KAHOY SECTION), BALETE AND MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 9 | 22DC0088ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0060+078 - K0060+800 | Region IV-A | Batangas 3rd DEO | Completed | ₱66.9M | 100% | Medium risk54 | —-0.101 |
| 10 | 18DC0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION, REHABIL | Region IV-A | Batangas 3rd DEO | Completed | ₱77.2M | 100% | Medium risk54 | —-0.101 |
| 11 | 18DC0010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, | Region IV-A | Batangas 3rd DEO | Completed | ₱59.8M | 100% | Medium risk54 | —-0.103 |
| 12 | 22DE0134ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, BAUAN-MABINI RD -K0174+000 - K0174+945, K0175+100 - K0175+300, K0175+7 | Region IV-A | Batangas 2nd DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.098 |
| 13 | 21DC0214LOCAL PROGRAM, BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY POBLACION, SAN NICOLAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱39.6M | 100% | Medium risk52 | —-0.095 |
| 14 | 20DC0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (AGONCILLO SECTION), AGONCILLO, BATANTANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.088 |
| 15 | 25DC0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BALAGBAG, ALITAGTAG, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱2.9M | 0% | Medium risk51 | —-0.006 |
| 16 | 24DC0104COVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CONSTRUCTION OF ACCESS ROAD LEADING TO TAAL LAKE, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱48.2M | 92% | Medium risk51 | —-0.064 |
| 17 | 25DC0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CONSTRCTION OF TAAL LAKE CIRCUMFERENTIAL ROAD, BARANGAY GONZALES, TANAUAN CITY SECTION | Region IV-A | Batangas 3rd DEO | Completed | ₱48.2M | 100% | Medium risk51 | —-0.106 |
| 18 | 24DC0121CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD ALONG | Region IV-A | Batangas 3rd DEO | Completed | ₱48.2M | 100% | Medium risk51 | —-0.106 |
| 19 | 23DC0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), TAAL LAKE CIRCUMFERENTIAL ROAD (SAN NICOLAS SECTION), SAN NICOLAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 20 | 24DC0004ORGANIZATIONAL OURCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, BANAY-BANAY-MOJON CUENCA RD | Region IV-A | Batangas 3rd DEO | Completed | ₱47M | 100% | Medium risk51 | —-0.106 |
| 21 | 25DC0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SAN NICOLAS CENTRAL SCHOOL, BARANGAY POBLACION, SAN NICO | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 79% | Medium risk51 | —-0.059 |
| 22 | 23DE0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TI | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 23 | 23DE0074OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD (STO. TOMAS-TALAHIB-SAN PEDRO-GAMAO-PISA), TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 24 | 20DC0213LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION/COMPLETION/REHAB/IMPROVEMENT OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), SAN NICOLAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱19.8M | 100% | Medium risk50 | —-0.101 |
| 25 | 20DD0147LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT DUHATAN ELEMENTARY SCHOOL, BRGY. DUHATAN, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.106 |