Contractor dossier
265 projects on file, including joint ventures this contractor is part of.
Total projects
265
Total budget
₱11.1B
Average progress
87.4%
Completion rate
72.1%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
4.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 207 | ₱9.9B | 53.2 | 9 | 89.3% |
| National Capital Region | 57 | ₱1.1B | 48.8 | 2 | 80.3% |
| Region IV-B | 1 | ₱99M | 53.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 85 | ₱3.5B | 49.9 | 0 | 85.8% |
| Buildings and Facilities | 83 | ₱2.1B | 49.5 | 4 | 88.9% |
| Flood Control and Drainage | 78 | ₱4.8B | 53.9 | 2 | 88.8% |
| OTHER | 6 | ₱114.1M | 70.3 | 2 | 90.7% |
| GAA 2025 OO-2 | 4 | ₱355.1M | 92.5 | 0 | 74.8% |
| GAA 2025 SSP | 3 | ₱34M | 90.5 | 2 | 38.8% |
| Water Provision and Storage | 3 | ₱6.6M | 22.0 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱53.3M | 49.9 | 0 | 100.0% |
| Bridges | 1 | ₱28.7M | 51.8 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DF0169ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG CANAS RIVER | Region IV-A | Cavite 1st DEO | On-Going | ₱93.5M | 28% | High risk93 | —-0.009 |
| 25DF0030ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY NAVARRO, GEN | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 95% | High risk93 | —-0.022 |
| 25OI0063REHABILITATION OF ROAD INCLUDING DRAINAGE, PAMPLONA 3, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱17.5M | 0% | High risk92 | Flagged0.030 |
| 25DQ0012CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, PHASE 1, BARANGAY CABILANG BAYBAY, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱83M | 88% | High risk92 | —-0.026 |
| 25DQ0015CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, PHASE 2, BARANGAY CABILANG BAYBAY, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱83M | 88% | High risk92 | —-0.026 |
| 25OI0081CONSTRUCTION OF ROAD INCLUDING DRAINAGE AT BARANGAY PULANGLUPA 1, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱6.8M | 96% | High risk91 | —-0.000 |
| 25OI0067REHABILITATION OF ROAD INCLUDING DRAINAGE, TALON 5, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱9.7M | 20% | High risk89 | Flagged0.025 |
| 20DF0220CONSTRUCTION /IMPROVEMENT/REHABILITATION OF MULTI-PURPOSE BUILDING AND BARANGAY HALL, BRGY. MANGGAHAN, GENERAL TRIAS; CONSTRUCTION/IMPROVEMENT/REHABILITATION OF COVERED COURT, WELLINGTON PLACE, PHASE 6, BRGY. PASONG CAMACHILE II, GENERAL TRIAS; CONSTRUCTI | Region IV-A | Cavite 1st DEO | Completed | ₱11.6M | 100% | High risk80 | Flagged0.002 |
| 25D00171CONSTRUCTION OF MULTI-PURPOSE BUILDING LAND TRANSPORTATION REGIONAL OFFICE - REGION 4A, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱140.3M | 21% | High risk79 | Flagged0.002 |
| 24DQ0120CONSTRUCTION OF REVETMENT INCLUDING OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIVER, PHASE III, BRGY. LANTIC, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱95.1M | 46% | High risk78 | Flagged0.047 |
| 19D00063PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE VII, WEST SIDE, CARMONA, CAVITE | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk77 | Flagged0.015 |
| 25DF0134CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF DON PLACIDO CAMPOS AVE., | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 2% | High risk73 | —-0.015 |
| 25DQ0111CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BAYANAN, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱9.8M | 16% | High risk72 | —-0.016 |
| 25DQ0091CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY MOLINO 4, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱6.9M | 0% | High risk72 | —-0.009 |
| 21DF0146LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/ REHABILITATION OF MULTI-PURPOSEBUILDING AT ANABU I, IMUS AND CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT ANABU,IMUS, CAV | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk69 | —-0.042 |
| 22DI0105OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0053+200 - K0054+450, K0055+420 - K0055+744, K0055+750 - K0055+780 | Region IV-A | Laguna 2nd DEO | Completed | ₱40.2M | 100% | High risk69 | —-0.042 |
| 24DF0263ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | On-Going | ₱19.4M | 97% | High risk68 | —-0.012 |
| 24D00206CONSTRUCTION OF CARMONA - SILANG DIVERSION ROAD, CAVITE | Region IV-A | Region IV-A | On-Going | ₱24.1M | 47% | High risk68 | Flagged0.002 |
| 19DF0077LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, SCHOOL BUILDING - REHABILITATION/IMPROVEMENT OF CLASSROOM BUILDING, GEN ABADILLA ELEMENTARY SCHOOL ROSARIO; LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTU | Region IV-A | Cavite 1st DEO | Completed | ₱10.4M | 100% | High risk68 | —-0.042 |
| 17DQ0002MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION-MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY.LANTIC, CARMONA, CAVITE, 5TH LEGISLATIVE DISTRICT | Region IV-A | Cavite 3rd DEO | Completed | ₱19.5M | 100% | High risk67 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DQ0120CONSTRUCTION OF REVETMENT INCLUDING OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIVER, PHASE III, BRGY. LANTIC, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱95.1M | 46% | High risk78 | Flagged0.047 |
| 25OI0063REHABILITATION OF ROAD INCLUDING DRAINAGE, PAMPLONA 3, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱17.5M | 0% | High risk92 | Flagged0.030 |
| 24DQ0112CONSTRUCTION OF 4STY8CL, LUCSUHIN ELEMENTARY SCHOOL, SILANG CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱34.5M | 54% | Medium risk44 | Flagged0.026 |
| 25OI0067REHABILITATION OF ROAD INCLUDING DRAINAGE, TALON 5, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱9.7M | 20% | High risk89 | Flagged0.025 |
| 23DF0171CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT IMUS INTEGRATED SCHOOL, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱33.4M | 89% | Medium risk44 | Flagged0.024 |
| 19D00063PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE VII, WEST SIDE, CARMONA, CAVITE | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk77 | Flagged0.015 |
| 24DF0270CONSTRUCTION OF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN CITY OF IMUS INTEGRATED SCHOOL, BARANGAY PASONG BUAYA, IMUS, CAVITE (PHASE 2) | Region IV-A | Cavite 1st DEO | On-Going | ₱9.8M | 93% | Medium risk44 | Flagged0.009 |
| 23DF0208CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF ROAD W/ DRAINAGE & BR.CONNECTING BRGY MAHARLIKA & ANABU | Region IV-A | Cavite 1st DEO | Completed | ₱28.7M | 100% | Medium risk52 | Flagged0.006 |
| 20DF0220CONSTRUCTION /IMPROVEMENT/REHABILITATION OF MULTI-PURPOSE BUILDING AND BARANGAY HALL, BRGY. MANGGAHAN, GENERAL TRIAS; CONSTRUCTION/IMPROVEMENT/REHABILITATION OF COVERED COURT, WELLINGTON PLACE, PHASE 6, BRGY. PASONG CAMACHILE II, GENERAL TRIAS; CONSTRUCTI | Region IV-A | Cavite 1st DEO | Completed | ₱11.6M | 100% | High risk80 | Flagged0.002 |
| 25D00171CONSTRUCTION OF MULTI-PURPOSE BUILDING LAND TRANSPORTATION REGIONAL OFFICE - REGION 4A, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱140.3M | 21% | High risk79 | Flagged0.002 |
| 24D00206CONSTRUCTION OF CARMONA - SILANG DIVERSION ROAD, CAVITE | Region IV-A | Region IV-A | On-Going | ₱24.1M | 47% | High risk68 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 20DF0163LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES - CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, CAVITE STATE UNIVERSITY, CAVITE CITY | Region IV-A | Cavite 1st DEO | Completed | ₱4M | 100% | Low risk26 | —-0.103 |
| 252 | 22OI0110REHABILITATION OF ROAD INCLUDING DRAINAGE MANUYO 1, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱4.6M | 100% | Low risk26 | —-0.097 |
| 253 | 25OI0082REHABILITATION OF DRAINAGE AT BARANGAY MANUYO 1, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱3.9M | 6% | Low risk26 | —-0.026 |
| 254 | 25OI0080REHABILITATION OF ROAD AT BARANGAY MANUYO 2, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱3.9M | 0% | Low risk26 | —-0.035 |
| 255 | 19DG0047CONST OF BREAKWATER AT BRGY. HUMBAC, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.7M | 100% | Low risk26 | —-0.083 |
| 256 | 19DG0045CONST OF BREAKWATER, BRGY. POB II, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.7M | 100% | Low risk26 | —-0.086 |
| 257 | 19DG0046CONST OF BREAKWATER, BRGY. BUCANA MALAKI, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.7M | 100% | Low risk26 | —-0.086 |
| 258 | 24DQ0083COSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (MUNICIPAL TRIAL COURT), GEN. MARIANO ALVAREZ, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.102 |
| 259 | 21DQ0088LOCAL PROGRAM LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL STRUCTURES / FACILITIES - FLOOD CONTROL AND DRAINAGE - CONSTRUCTION (COMPLETION) OF RETAINING WALL, BARANGAY SAN JOSE , GMA, CAVITE AND CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY IPIL I AND NARRA | Region IV-A | Cavite 3rd DEO | Completed | ₱4M | 100% | Low risk25 | —-0.087 |
| 260 | 23DQ0064CONSTRUCTION (COMPLETION) OF DRAINAGE AND OTHER IMPROVEMENTS AT GREENVALLEY, BRGY. SAN NICOLAS 3, BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱3.5M | 100% | Low risk25 | —-0.084 |
| 261 | 18DQ0130CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) KAONG NATIONAL HIGH SCHOOL, BRGY. KAONG, SILANG, CAVITE, BULIHAN SITES AND SERVICES PROJECT ELEMENTARY SCHOOL, BRGY. BULIHAN, SILANG, CAVITE, BULIHAN NATIONAL HIGH SCHOOL, BRGY. BULIHAN, SILANG, CAVITE, | Region IV-A | Region IV-A | Completed | ₱3.2M | 100% | Low risk25 | —-0.069 |
| 262 | 19DG0064CONST. OF CONCRETE ROAD - ROAD CONCRETING, BRGY. MATAGBAK I, MUN. OF ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.6M | 100% | Low risk25 | —-0.104 |
| 263 | 21DQ0076LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - WATER MANAGEMENT FACILITIES - WATER SUPPLY - CONSTRUCTION OF WATER SUPPLY, BARANGAY ULAT, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.072 |
| 264 | 19DQ0089LOCAL PROGRAM- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - WATER MANAGEMENT FACILITIES - WATER SUPPLY - INSTALLATION OF WATER SUPPLY, BRGY. ULAT, SILANG, CAVITE | Region IV-A | Region IV-A | Completed | ₱1.5M | 100% | Low risk18 | —-0.072 |
| 265 | 22DF0220CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SILANGAN II, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱1.9M | 84% | Low risk18 | —-0.037 |