Contractor dossier
265 projects on file, including joint ventures this contractor is part of.
Total projects
265
Total budget
₱11.1B
Average progress
87.4%
Completion rate
72.1%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
4.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 207 | ₱9.9B | 53.2 | 9 | 89.3% |
| National Capital Region | 57 | ₱1.1B | 48.8 | 2 | 80.3% |
| Region IV-B | 1 | ₱99M | 53.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 85 | ₱3.5B | 49.9 | 0 | 85.8% |
| Buildings and Facilities | 83 | ₱2.1B | 49.5 | 4 | 88.9% |
| Flood Control and Drainage | 78 | ₱4.8B | 53.9 | 2 | 88.8% |
| OTHER | 6 | ₱114.1M | 70.3 | 2 | 90.7% |
| GAA 2025 OO-2 | 4 | ₱355.1M | 92.5 | 0 | 74.8% |
| GAA 2025 SSP | 3 | ₱34M | 90.5 | 2 | 38.8% |
| Water Provision and Storage | 3 | ₱6.6M | 22.0 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱53.3M | 49.9 | 0 | 100.0% |
| Bridges | 1 | ₱28.7M | 51.8 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DF0169ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG CANAS RIVER | Region IV-A | Cavite 1st DEO | On-Going | ₱93.5M | 28% | High risk93 | —-0.009 |
| 25DF0030ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY NAVARRO, GEN | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 95% | High risk93 | —-0.022 |
| 25OI0063REHABILITATION OF ROAD INCLUDING DRAINAGE, PAMPLONA 3, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱17.5M | 0% | High risk92 | Flagged0.030 |
| 25DQ0012CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, PHASE 1, BARANGAY CABILANG BAYBAY, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱83M | 88% | High risk92 | —-0.026 |
| 25DQ0015CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, PHASE 2, BARANGAY CABILANG BAYBAY, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱83M | 88% | High risk92 | —-0.026 |
| 25OI0081CONSTRUCTION OF ROAD INCLUDING DRAINAGE AT BARANGAY PULANGLUPA 1, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱6.8M | 96% | High risk91 | —-0.000 |
| 25OI0067REHABILITATION OF ROAD INCLUDING DRAINAGE, TALON 5, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱9.7M | 20% | High risk89 | Flagged0.025 |
| 20DF0220CONSTRUCTION /IMPROVEMENT/REHABILITATION OF MULTI-PURPOSE BUILDING AND BARANGAY HALL, BRGY. MANGGAHAN, GENERAL TRIAS; CONSTRUCTION/IMPROVEMENT/REHABILITATION OF COVERED COURT, WELLINGTON PLACE, PHASE 6, BRGY. PASONG CAMACHILE II, GENERAL TRIAS; CONSTRUCTI | Region IV-A | Cavite 1st DEO | Completed | ₱11.6M | 100% | High risk80 | Flagged0.002 |
| 25D00171CONSTRUCTION OF MULTI-PURPOSE BUILDING LAND TRANSPORTATION REGIONAL OFFICE - REGION 4A, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱140.3M | 21% | High risk79 | Flagged0.002 |
| 24DQ0120CONSTRUCTION OF REVETMENT INCLUDING OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIVER, PHASE III, BRGY. LANTIC, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱95.1M | 46% | High risk78 | Flagged0.047 |
| 19D00063PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE VII, WEST SIDE, CARMONA, CAVITE | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk77 | Flagged0.015 |
| 25DF0134CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF DON PLACIDO CAMPOS AVE., | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 2% | High risk73 | —-0.015 |
| 25DQ0111CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BAYANAN, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱9.8M | 16% | High risk72 | —-0.016 |
| 25DQ0091CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY MOLINO 4, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱6.9M | 0% | High risk72 | —-0.009 |
| 21DF0146LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/ REHABILITATION OF MULTI-PURPOSEBUILDING AT ANABU I, IMUS AND CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT ANABU,IMUS, CAV | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk69 | —-0.042 |
| 22DI0105OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0053+200 - K0054+450, K0055+420 - K0055+744, K0055+750 - K0055+780 | Region IV-A | Laguna 2nd DEO | Completed | ₱40.2M | 100% | High risk69 | —-0.042 |
| 24DF0263ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | On-Going | ₱19.4M | 97% | High risk68 | —-0.012 |
| 24D00206CONSTRUCTION OF CARMONA - SILANG DIVERSION ROAD, CAVITE | Region IV-A | Region IV-A | On-Going | ₱24.1M | 47% | High risk68 | Flagged0.002 |
| 19DF0077LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, SCHOOL BUILDING - REHABILITATION/IMPROVEMENT OF CLASSROOM BUILDING, GEN ABADILLA ELEMENTARY SCHOOL ROSARIO; LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTU | Region IV-A | Cavite 1st DEO | Completed | ₱10.4M | 100% | High risk68 | —-0.042 |
| 17DQ0002MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION-MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY.LANTIC, CARMONA, CAVITE, 5TH LEGISLATIVE DISTRICT | Region IV-A | Cavite 3rd DEO | Completed | ₱19.5M | 100% | High risk67 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DQ0120CONSTRUCTION OF REVETMENT INCLUDING OTHER IMPROVEMENTS ALONG CARMONA-BIÑAN RIVER, PHASE III, BRGY. LANTIC, CARMONA CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱95.1M | 46% | High risk78 | Flagged0.047 |
| 25OI0063REHABILITATION OF ROAD INCLUDING DRAINAGE, PAMPLONA 3, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱17.5M | 0% | High risk92 | Flagged0.030 |
| 24DQ0112CONSTRUCTION OF 4STY8CL, LUCSUHIN ELEMENTARY SCHOOL, SILANG CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱34.5M | 54% | Medium risk44 | Flagged0.026 |
| 25OI0067REHABILITATION OF ROAD INCLUDING DRAINAGE, TALON 5, LAS PINAS CITY LONE DISTRICT | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱9.7M | 20% | High risk89 | Flagged0.025 |
| 23DF0171CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT IMUS INTEGRATED SCHOOL, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱33.4M | 89% | Medium risk44 | Flagged0.024 |
| 19D00063PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE VII, WEST SIDE, CARMONA, CAVITE | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk77 | Flagged0.015 |
| 24DF0270CONSTRUCTION OF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN CITY OF IMUS INTEGRATED SCHOOL, BARANGAY PASONG BUAYA, IMUS, CAVITE (PHASE 2) | Region IV-A | Cavite 1st DEO | On-Going | ₱9.8M | 93% | Medium risk44 | Flagged0.009 |
| 23DF0208CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF ROAD W/ DRAINAGE & BR.CONNECTING BRGY MAHARLIKA & ANABU | Region IV-A | Cavite 1st DEO | Completed | ₱28.7M | 100% | Medium risk52 | Flagged0.006 |
| 20DF0220CONSTRUCTION /IMPROVEMENT/REHABILITATION OF MULTI-PURPOSE BUILDING AND BARANGAY HALL, BRGY. MANGGAHAN, GENERAL TRIAS; CONSTRUCTION/IMPROVEMENT/REHABILITATION OF COVERED COURT, WELLINGTON PLACE, PHASE 6, BRGY. PASONG CAMACHILE II, GENERAL TRIAS; CONSTRUCTI | Region IV-A | Cavite 1st DEO | Completed | ₱11.6M | 100% | High risk80 | Flagged0.002 |
| 25D00171CONSTRUCTION OF MULTI-PURPOSE BUILDING LAND TRANSPORTATION REGIONAL OFFICE - REGION 4A, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱140.3M | 21% | High risk79 | Flagged0.002 |
| 24D00206CONSTRUCTION OF CARMONA - SILANG DIVERSION ROAD, CAVITE | Region IV-A | Region IV-A | On-Going | ₱24.1M | 47% | High risk68 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 21DQ0099LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION/IMPROVEMENT OF DPWH CAVITE 3RD DISTRICT ENGINEERING OFFICE, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.089 |
| 52 | 25DH0062CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ROMELO RIVER, SINILOAN, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱91.7M | 15% | High risk62 | —-0.020 |
| 53 | 25DC0112ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, TALISAY-LAUREL-AGONCILLO RD - K0095+548 - K0099+000 | Region IV-A | Batangas 3rd DEO | On-Going | ₱94.1M | 83% | High risk61 | —-0.066 |
| 54 | 25DG0052PREV. MAINT. - TERTIARY RDS - CRISANTO M. DELOS REYES AVE. - K0066+(504) - K0066+437, K0066+891-K00 | Region IV-A | Cavite 2nd DEO | On-Going | ₱93.7M | 33% | High risk61 | —-0.049 |
| 55 | 25DH0052PREVENTIVE MAINTENANCE-SECONDARY ROADS PAGSANJAN-LUCBAN RD K0096+230-K0098+193, CAVINTI, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱93.6M | 100% | High risk61 | —-0.072 |
| 56 | 22OI0026PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG NATIONAL ROAD, BARANGAY ALMANZA DOS, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.083 |
| 57 | 17DQ0123CONCRETING OF SITIO MAG -ASAWANG MANGA FMR, BRGY. MABUHAY, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱11.7M | 100% | High risk60 | —-0.025 |
| 58 | 24DH0043PREVENTIVE MAINTENANCE-SECONDARY ROADS-PAGSANJAN-LUCBAN RD-K0112+292 TO K0113+804, LUISIANA, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱96.4M | 100% | High risk60 | —-0.063 |
| 59 | 24DQ0042PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY ALONG MANILA-CAVITE (NCR BDRY-JCT CAVITE CITY SECTION) - K0017 + 777 - K0019 + 305 | Region IV-A | Cavite 3rd DEO | Completed | ₱98M | 100% | High risk60 | —-0.090 |
| 60 | 23DQ0083ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - STA. ROSA-ULAT-TAGAYTAY RD - K0066 + 083 K0066 + 323, K0070 + 239 K0072 + 000 | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.093 |
| 61 | 24DQ0069CONSTRUCTION OF ROAD CONNECTING BACOOR-DASMARINAS NATIONAL ROAD-SAN MARINO RD., DASMARINAS, CAVITE (PHASE 1) AND CONSTRUCTION OF ROAD CONNECTING BACOOR-DASMARIÑAS NATIONAL ROAD-SAN MARINO RD., DASMARIÑAS, CAVITE (PHASE 2) | Region IV-A | Cavite 3rd DEO | On-Going | ₱99M | 73% | High risk60 | —-0.053 |
| 62 | 22DQ0080CONSTRUCTION OF ROAD, BARANGAY BILUSO, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 63 | 24DK0059ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENACE - SECONDARY ROADS - MAUBAN-TIGNOAN ROAD-K0117+000-K0120+790, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.092 |
| 64 | 24DG0085PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG MAR-MAG-AMUYONG RD K0054+(-536)-K0055+730,K005 | Region IV-A | Cavite 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 65 | 19DQ0139CONCRETING OF BRGY. SALAWAG, DASMARIÑAS - BRGY. PASONG BUAYA, IMUS FMR, BRGY. SALAWAG, DASMARIÑAS - BRGY. PASONG BUAYA, IMUS, CAVITE | Region IV-A | Region IV-A | Completed | ₱8M | 100% | Medium risk59 | —-0.023 |
| 66 | 21DQ0030LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY G. DE JESUS, GMA, CAVITE; CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE BUILDING), | Region IV-A | Cavite 3rd DEO | Completed | ₱82.7M | 100% | Medium risk59 | —-0.091 |
| 67 | 17DQ0035CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT), BRGY. SAN JOSE, GEN. MARIANO ALVAREZ, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱4.7M | 100% | Medium risk57 | —-0.071 |
| 68 | 23DH0105PREVENTIVE MAINTENANCE-TERTIARY ROADS-MARIKINA-INFANTA RD K0087+794-K0088+949, SANTA MARIA, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱64.3M | 100% | Medium risk57 | —-0.039 |
| 69 | 24DQ0055CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BIR, BFP AND POST OFFICE BUILDING), BARANGAY MADUYA, CARMONA, CAVITE, PHASE I AND CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BIR, BFP AND POST OFFICE BUILDING), BARANGAY MADUYA, CARMONA, CAVIT | Region IV-A | Cavite 3rd DEO | Completed | ₱54.4M | 100% | Medium risk57 | —-0.098 |
| 70 | 22DQ0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG CAVITE-BATANGAS RD - K0051 + 131 - K0052 + 608, K0053 + 173 - K0053 + 763 AND PREVENTIVE MAINTENANCE (ASPH | Region IV-A | Cavite 3rd DEO | Completed | ₱89.4M | 100% | Medium risk56 | —-0.096 |
| 71 | 23DQ0138CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING (BIR/ BFP AND POST OFFICE BUILDING), BRGY. MADUYA, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱49.5M | 100% | Medium risk56 | —-0.094 |
| 72 | 20DQ0059LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF STANDARD DPWH DISTRICT ENGINEERING OFFICE OF CAVITE SUB-DEO, CARMONA CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱48.2M | 100% | Medium risk56 | —-0.096 |
| 73 | 23DQ0100CONSTRUCTION OF DPWH CAVITE 3RD DEO BUILDING INCLUDING OTHER FACILITIES, PHASE I, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.095 |
| 74 | 24DQ0032CONSTRUCTION (COMPLETION) OF CAVITE 3RD DEO BUILDING (PHASE II), CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.096 |
| 75 | 21DQ0023LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF CAVITE 3RD DISTRICT ENGINEERING OFFICE BUILDING (PHASE II), CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.099 |