Contractor dossier
47 projects on file, including joint ventures this contractor is part of.
Total projects
47
Total budget
₱2B
Average progress
92.9%
Completion rate
70.2%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
3
6.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 35 | ₱1.3B | 53.2 | 2 | 92.8% |
| Region VIII | 12 | ₱708.3M | 60.7 | 1 | 93.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 19 | ₱977.4M | 50.6 | 0 | 97.7% |
| Roads | 10 | ₱212.8M | 48.4 | 0 | 91.5% |
| OTHER | 6 | ₱332.3M | 69.6 | 1 | 95.3% |
| Buildings and Facilities | 5 | ₱66M | 32.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 3 | ₱267.1M | 92.5 | 0 | 78.5% |
| Bridges | 2 | ₱64.2M | 47.9 | 0 | 87.3% |
| GAA 2025 SSP | 1 | ₱77.1M | 95.1 | 1 | 80.0% |
| GAA 2025 OO-1 | 1 | ₱48.2M | 94.2 | 1 | 33.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0030SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY JAGOBIAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱77.1M | 80% | High risk95 | Flagged0.019 |
| 25H00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE - WIDENING OF PERMANENT BRIDGES, LAGNASON BR. (B00442CB) ALONG N. BACALSO AVE. (CEBU SOUTH RD) | Region VII | Region VII | On-Going | ₱48.2M | 33% | High risk94 | Flagged0.017 |
| 25IL0011FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SEGMENT 2, BARANGAY HILAAN, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.5M | 83% | High risk93 | —-0.005 |
| 25HN0014OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, PHASE 3, BARANGAY S | Region VII | Cebu 6th DEO | On-Going | ₱122.4M | 86% | High risk93 | —-0.005 |
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 25IL0066FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANTURING RIVER FLOOD CONTROL - ASUNCION SECTION, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱48.2M | 66% | High risk91 | —-0.007 |
| 23HN0127CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD UNDER CANSAGA BAY BRIDGE (MANDAUE SIDE) BRGY. P | Region VII | Cebu 6th DEO | Completed | ₱98.9M | 100% | High risk71 | —-0.019 |
| 22HN0066CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, G. OUANO ST., BRGY. OPAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49M | 100% | High risk67 | —-0.026 |
| 24HN0001002: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE IV), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱96.5M | 100% | High risk63 | —-0.027 |
| 22HN0005CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD INCLUDING DRAINAGE FACILITIES AT C. D. SENO ST., MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱39.5M | 100% | High risk63 | —-0.029 |
| 22HH0009OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BRGY. PULANGBATO, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.065 |
| 24HN0113CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD UNDER CANSAGA BAY BRIDGE (MANDAUE SIDE - PHASE 2) BRGY. PAKNA-AN, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱14.7M | 100% | High risk63 | —-0.032 |
| 24HN0084CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES OF G. OUANO ST., BRGY.OPAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.8M | 100% | High risk63 | —-0.032 |
| 22IL0173CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES, CONSTRUCTION OF BARANGAY COMBADO FLOOD CONTROL STRUCTURE, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 25HN0030SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY JAGOBIAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱77.1M | 80% | High risk95 | Flagged0.019 |
| 25H00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE - WIDENING OF PERMANENT BRIDGES, LAGNASON BR. (B00442CB) ALONG N. BACALSO AVE. (CEBU SOUTH RD) | Region VII | Region VII | On-Going | ₱48.2M | 33% | High risk94 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25HN0030SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY JAGOBIAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱77.1M | 80% | High risk95 | Flagged0.019 |
| 2 | 25H00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE - WIDENING OF PERMANENT BRIDGES, LAGNASON BR. (B00442CB) ALONG N. BACALSO AVE. (CEBU SOUTH RD) | Region VII | Region VII | On-Going | ₱48.2M | 33% | High risk94 | Flagged0.017 |
| 3 | 25IL0011FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SEGMENT 2, BARANGAY HILAAN, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.5M | 83% | High risk93 | —-0.005 |
| 4 | 25HN0014OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, PHASE 3, BARANGAY S | Region VII | Cebu 6th DEO | On-Going | ₱122.4M | 86% | High risk93 | —-0.005 |
| 5 | 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 6 | 25IL0066FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANTURING RIVER FLOOD CONTROL - ASUNCION SECTION, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱48.2M | 66% | High risk91 | —-0.007 |
| 7 | 23HN0127CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD UNDER CANSAGA BAY BRIDGE (MANDAUE SIDE) BRGY. P | Region VII | Cebu 6th DEO | Completed | ₱98.9M | 100% | High risk71 | —-0.019 |
| 8 | 22HN0066CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, G. OUANO ST., BRGY. OPAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49M | 100% | High risk67 | —-0.026 |
| 9 | 24HN0001002: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE IV), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱96.5M | 100% | High risk63 | —-0.027 |
| 10 | 22HN0005CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD INCLUDING DRAINAGE FACILITIES AT C. D. SENO ST., MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱39.5M | 100% | High risk63 | —-0.029 |
| 11 | 22HH0009OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BRGY. PULANGBATO, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.065 |
| 12 | 24HN0113CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD UNDER CANSAGA BAY BRIDGE (MANDAUE SIDE - PHASE 2) BRGY. PAKNA-AN, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱14.7M | 100% | High risk63 | —-0.032 |
| 13 | 24HN0084CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES OF G. OUANO ST., BRGY.OPAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.8M | 100% | High risk63 | —-0.032 |
| 14 | 22IL0173CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES, CONSTRUCTION OF BARANGAY COMBADO FLOOD CONTROL STRUCTURE, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.063 |
| 15 | 17HH0122CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, LEGASPI ST., BRGY. SAN ROQUE, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱20M | 100% | Medium risk56 | —-0.065 |
| 16 | 25HN0043OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYS.- CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER (DOWNSTREAM) OUTFALL, BRGY. PAKNA-AN, MANDAUE CITY | Region VII | Cebu 6th DEO | Completed | ₱72.3M | 100% | Medium risk53 | —-0.075 |
| 17 | 23HH0067OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAHUG RIVER, BARANGA | Region VII | Cebu City DEO | On-Going | ₱54.2M | 100% | Medium risk52 | —-0.023 |
| 18 | 24HN0082CLUSTER I - CONST./ UPGRADING/ REHAB. OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - A.) AC CORTES AVENUE (S00252CB) K0008 + (-490), (S00395CB) CHAINAGE 1268 AND B.) AC CORTES AVENUE - K0008 + 840 - K0009 + 120, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱53.9M | 100% | Medium risk52 | —-0.093 |
| 19 | 23IL0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BATO 1 - BATO 2 FLOOD CONTROL, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱67.5M | 100% | Medium risk52 | —-0.075 |
| 20 | 23IL0007NETWORK DEVELOPMENT - CONSTRUCTION OF BYPASS AND DIVERSION ROADS - MAASIN CITY COASTAL BYPASS ROAD (WEST BYPASS ROAD SEGMENT 6), SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱48.9M | 100% | Medium risk51 | —-0.045 |
| 21 | 24HN0111CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TINGUB CREEK, BRGY. PAGSABUNGAN, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱49M | 100% | Medium risk50 | —-0.034 |
| 22 | 19HH0221LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - SCHOOL BUILDINGS - CONSTRUCTION OF SCHOOL BUILDING, CEBU TECHNOLOGICAL UNIVERSITY CTU - CEBU CITY, BRGY. GUBA, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱27.4M | 100% | Medium risk50 | —-0.092 |
| 23 | 21IL0147CONCRETING OF BRGY. SALVADOR TO SITIO MANG-MANG BRGY. SALVADOR FMR, BRGY. SALVADOR, MACROHON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱14.4M | 100% | Medium risk49 | —-0.041 |
| 24 | 21IL0157CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF AMPARO FLOOD CONTROL, MACROHON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.078 |
| 25 | 24IL0009CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALBAGO FLOOD CONTROL SEGMENT 2, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.078 |