Contractor dossier
54 projects on file, including joint ventures this contractor is part of.
Total projects
54
Total budget
₱5.1B
Average progress
66.9%
Completion rate
42.6%
Below 70%
Average risk score
79.5
High risk on average, out of 100
Flagged as unusual
10
18.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 54 | ₱5.1B | 79.5 | 10 | 66.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 37 | ₱3.5B | 77.7 | 2 | 86.8% |
| Roads | 9 | ₱821.5M | 72.7 | 0 | 8.7% |
| GAA 2025 SSP | 8 | ₱769.8M | 95.5 | 8 | 40.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 25CP0084CONVERG. AND SPECIAL SUPPORT PROG.-SUST. INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES -REHAB. OF SIBUL-DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 8) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 12% | High risk95 | Flagged0.029 |
| 25CP0083CONVERG. AND SPECIAL SUPPORT PROG.-SUST. INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES - REHAB. OF SIBUL-DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 7) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 12% | High risk95 | Flagged0.029 |
| 25CP0082CONVERG. AND SPECIAL SUPPORT PROG.-SUST. INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/STRAT. PUBLIC BLDGS./ FACILITIES-REHAB. OF SIBUL-DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 6) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 12% | High risk95 | Flagged0.029 |
| 24C00677CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCT. ALONG, MADLUM RIVER(PHASE 1),BACK OF BIAK-NA-BATO- ELEM. SCHOOL SECTION, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.056 |
| 24CC0289CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BARANGAY IGULOT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱99M | 100% | High risk80 | —-0.021 |
| 24CC0151CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG (KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱99M | 98% | High risk80 | —-0.020 |
| 24CC0403CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURE AND WATERWAYS ALONG BOCAUE RIVER, BRGY. BAMBANG (SITIO PULO TO PUROK 6), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 24CC0402CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURE AND WATERWAYS ALONG BOCAUE RIVER, BRGY. BAMBANG (SITIO BAKOD TO PUROK 6), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 24CC0454CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BRGY. MANATAL (PUROK 2-3), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱99M | 100% | High risk80 | —-0.021 |
| 24CC0296CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BARANGAY MALIBONG BATA, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 24CC0297CONSTRUCTION OF SLOPE PROTECTION STRUCTUREN AND WATERWAYS, BRGY. BUNSURAN (PUROK 4), PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 24CC0298CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BRGY. BUNSURAN, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 25CP0149BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE SLOPE PROTECTION INCL. IMPROVEMENT OF WATERWAYS ALONG TARTARO SECTION, SAN MIGUEL, BULACAN (PHASE 6) | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
| 24C00524BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN (PHASE 2) | Region III | Region III | On-Going | ₱97.5M | 63% | High risk80 | —-0.006 |
| 24C00525BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER, BRGY. TARTARO, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00677CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCT. ALONG, MADLUM RIVER(PHASE 1),BACK OF BIAK-NA-BATO- ELEM. SCHOOL SECTION, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.056 |
| 25CP0082CONVERG. AND SPECIAL SUPPORT PROG.-SUST. INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/STRAT. PUBLIC BLDGS./ FACILITIES-REHAB. OF SIBUL-DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 6) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 12% | High risk95 | Flagged0.029 |
| 25CP0084CONVERG. AND SPECIAL SUPPORT PROG.-SUST. INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES -REHAB. OF SIBUL-DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 8) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 12% | High risk95 | Flagged0.029 |
| 25CP0083CONVERG. AND SPECIAL SUPPORT PROG.-SUST. INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES - REHAB. OF SIBUL-DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 7) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 12% | High risk95 | Flagged0.029 |
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 25CP0149BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE SLOPE PROTECTION INCL. IMPROVEMENT OF WATERWAYS ALONG TARTARO SECTION, SAN MIGUEL, BULACAN (PHASE 6) | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24CC0150CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BRGY. STA. CRUZ, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 27 | 24C00522BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN (PHASE 3) | Region III | Region III | On-Going | ₱99M | 73% | High risk80 | —-0.011 |
| 28 | 24C00531BASIC INFRASTRUCTURE PROJECTS-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER, BRGY. MASALIPIT, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱99M | 87% | High risk80 | —-0.018 |
| 29 | 24C00520BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER-PINAMBARAN SECTION(RIGHT DIKE), BRGY. PINAMBARAN, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱99M | 100% | High risk80 | —-0.022 |
| 30 | 24C00523BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. TARTARO, SAN MIGUEL, BULACAN (PHASE 4) | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.048 |
| 31 | 24C00513BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY.TARTARO, SAN MIGUEL, BULACAN(PHASE 5) | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.049 |
| 32 | 24CC0455CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURES AND WATERWAYS, BARANGAY SAN JOSE, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.049 |
| 33 | 24C00521BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER,UPIG SECTION, BRGY.UPIG,SAN ILDEFONSO,BULACAN | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 34 | 24C00511BASIC INFRASTRUCTURE PROGRAM-BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR (LEFT SIDE), BRGY. TARTARO, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.049 |
| 35 | 24C00514BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. MASALIPIT, SAN MIGUEL, BULACAN (PHASE 1) | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.049 |
| 36 | 24C00515BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. MASALIPIT, SAN MIGUEL, BULACAN (PHASE 2) | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.049 |
| 37 | 24C00512BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. TARTARO, SAN MIGUEL, BULACAN (PHASE 1) | Region III | Region III | Completed | ₱99M | 100% | High risk80 | —-0.049 |
| 38 | 24C00475FLOOD MANAGEMENT PROGRAM - COSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUTURE ALONG MADLUM RIVER (PHASE 4), BARANGAY MASALIPIT, SAN MIGUEL BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 39 | 24C00474FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER (PHASE 3), BARANGAY MASALIPIT, SAN MIGUEL BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 40 | 25CP0085CONVERG. AND SPECIAL SUPPORT PROG.-SUST. INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES-REHAB. OF SIBUL-DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 9) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 22% | High risk76 | —-0.014 |
| 41 | 25CO0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA11239 - INSTALLATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG ROMAN EXPRESSWAY - MARIVELES, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱95.5M | 21% | High risk76 | —-0.008 |
| 42 | 25CO0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA11239 - INSTALLATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG ROMAN EXPRESSWAY - MARIVELES, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱95.6M | 25% | High risk76 | —-0.009 |
| 43 | 25CP0128CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE B) | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 0% | High risk76 | —-0.007 |
| 44 | 25CP0127CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE A) | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk76 | —-0.007 |
| 45 | 25CP0133CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF SIBUL - DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 2) | Region III | Bulacan 3rd DEO | On-Going | ₱97.6M | 0% | High risk76 | —-0.008 |
| 46 | 25CP0130CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE D) | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 0% | High risk76 | —-0.007 |
| 47 | 24CC0453CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BRGY. MALIBONG BATA (PUROK 4), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱49.5M | 100% | High risk74 | —-0.030 |
| 48 | 25CB0087REHABILITATION OF BLISS ROAD, BALANGA CITY, BATAAN (PHASE 1) | Region III | Bataan 2nd DEO | On-Going | ₱77.5M | 5% | High risk74 | —-0.006 |
| 49 | 25CP0154CONVERGE. AND SPECIAL SUPPORT PROG. -BASIC INFRA. PROG. (BIP) - BIP -FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONSTRUCTION OF CONCRETE SLOPE PROTECTION INCL. IMPROVEMENT OF WATERWAYS ALONG TARTARO SECTION, SAN MIGUEL | Region III | Bulacan 3rd DEO | On-Going | ₱48.8M | 0% | High risk73 | —-0.005 |
| 50 | 24C00530BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, PINAMBARAN SECTION (DOWNSTREAM), BRGY. PINAMBARAN, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱39.6M | 83% | High risk68 | —-0.026 |