Contractor dossier
268 projects on file, including joint ventures this contractor is part of.
Total projects
268
Total budget
₱12.4B
Average progress
96.8%
Completion rate
91.8%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
6
2.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 203 | ₱9.7B | 43.8 | 4 | 96.4% |
| National Capital Region | 37 | ₱1.5B | 47.5 | 0 | 100.0% |
| Region IV-B | 7 | ₱290.5M | 45.1 | 1 | 96.6% |
| Region IV-A | 5 | ₱226.8M | 55.3 | 0 | 83.1% |
| Region I | 3 | ₱175.7M | 62.9 | 0 | 100.0% |
| Region II | 3 | ₱104.5M | 57.3 | 0 | 100.0% |
| Negros Island Region | 3 | ₱116.8M | 54.3 | 0 | 97.7% |
| Central Office | 2 | ₱146.9M | 61.4 | 0 | 100.0% |
| Region VII | 2 | ₱68.2M | 44.9 | 0 | 100.0% |
| Region VI | 1 | ₱16.4M | 51.5 | 1 | 100.0% |
| Region VIII | 1 | ₱17.4M | 49.2 | 0 | 72.3% |
| Cordillera Administrative Region | 1 | ₱32.3M | 45.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 107 | ₱5.5B | 43.0 | 1 | 98.2% |
| Roads | 74 | ₱3.4B | 46.5 | 0 | 99.1% |
| Bridges | 47 | ₱1.9B | 43.3 | 1 | 94.0% |
| Buildings and Facilities | 25 | ₱828.3M | 43.8 | 1 | 100.0% |
| OTHER | 8 | ₱397M | 58.5 | 1 | 88.9% |
| GAA 2025 SSP | 2 | ₱76.2M | 94.2 | 1 | 53.4% |
| GAA 2025 OO-2 | 2 | ₱160.7M | 89.4 | 1 | 69.8% |
| Bridges, Roads | 2 | ₱145.7M | 49.0 | 0 | 57.6% |
| Water Provision and Storage | 1 | ₱1.7M | 14.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CB0102CONSTRUCTION OF BRIDGE, BARANGAY CUPANG, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱56.9M | 17% | High risk95 | Flagged0.027 |
| 25CC0509CONSTRUCTION OF MULTI-PURPOSE BUILDING (GUIGUINTO OVAL SPORTS COMPLEX) POBLACION, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱19.3M | 90% | High risk94 | —-0.003 |
| 25C00310FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, UMAGOL RIVER, UPSTREAM, SEGMENT VR-2, BAGAC, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱118.2M | 63% | High risk93 | —-0.001 |
| 25EF0107CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱42.4M | 76% | High risk86 | Flagged0.005 |
| 24C00048FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGAC RIVER (VALDEZ BRIDGE), BAGAC, BATAAN (PHASE II) | Region III | Region III | On-Going | ₱94.3M | 93% | High risk81 | —-0.012 |
| 25CC0170CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE, PUROK 6, BARANGAY SANTA CRUZ, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 32% | High risk81 | —-0.005 |
| 24CC0164CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BARANGAY POBLACION PUROK 1, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 24CC0294CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY CAMBAOG-TALAMPAS (PUROK 3), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 17CL0117CONSTRUCTION OF ONE (1) EVACUATION CENTER AT BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱33.9M | 100% | High risk73 | —-0.062 |
| 24C00161FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO TRIBUTARY (PINULOT SECTION) TO COLO RIVER, PHASE 2-P, BRGY PINULOT, DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱47.3M | 54% | High risk73 | —-0.008 |
| 17CB0090REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) EPZA BY-PASS (BARASO COUNTRY RD) - KO158+-140-KO158+340, KO160+300-KO160+540, KO161 | Region III | Bataan 2nd DEO | Completed | ₱68.1M | 100% | High risk72 | —-0.058 |
| 20CB0011CONSTRUCTION OF FLOOD CONTROL STRUCTURES, TALISAY RIVER, CATMON SECTION PILAR, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱47.8M | 100% | High risk72 | —-0.057 |
| 24CC0436CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY STO. NINO, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | High risk72 | —-0.076 |
| 17CA0069CONSTRUCTION OF LAYAC DIVERSION CHANNEL,DINALUPIHAN, BATAAN | Central Office | Flood Control Management Cluster | Completed | ₱62.4M | 100% | High risk72 | —-0.055 |
| 18CL0010CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL @ TAMBAK RIVER LEFT SIDE (UPSTREAM), BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱92.6M | 100% | High risk71 | —-0.025 |
| 22CL0010CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱64.5M | 11% | High risk71 | Flagged0.039 |
| 22CL0044CONSTRUCTION OF STA. CRUZ COASTAL ROAD, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk71 | —-0.019 |
| 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | Region III | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 17CB0024NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS ROMAN EXPRESSWAY KO133+292-KO133+600, KO140+813-KO141+437 KO141+472-KO142+094 ORION LIMAY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱37.5M | 100% | High risk70 | —-0.064 |
| 20A00185LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS, ADAMS (ILOCOS NORTE) - CALANASAN (APAYAO) ROAD | Region I | Region I | Completed | ₱99M | 100% | High risk70 | —-0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | Region III | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 22CL0010CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱64.5M | 11% | High risk71 | Flagged0.039 |
| 25CB0102CONSTRUCTION OF BRIDGE, BARANGAY CUPANG, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱56.9M | 17% | High risk95 | Flagged0.027 |
| 24C00160BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - AMO BR. (B01613LZ) ALONG JCT. LAYAC-BALANGA-MARIVELES PORT ROAD (PHASE 1) | Region III | Region III | On-Going | ₱40.2M | 0% | High risk64 | Flagged0.016 |
| 16GB0254CONSTRUCTION OF 3 STOREY NINE(9) CLASSROOM SCHOOL BUILDING AT BARBAZA, NHS, BARBAZA, ANTIQUE | Region VI | Antique DEO | Completed | ₱16.4M | 100% | Medium risk51 | Flagged0.012 |
| 25EF0107CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱42.4M | 76% | High risk86 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CB0102CONSTRUCTION OF BRIDGE, BARANGAY CUPANG, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱56.9M | 17% | High risk95 | Flagged0.027 |
| 2 | 25CC0509CONSTRUCTION OF MULTI-PURPOSE BUILDING (GUIGUINTO OVAL SPORTS COMPLEX) POBLACION, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱19.3M | 90% | High risk94 | —-0.003 |
| 3 | 25C00310FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, UMAGOL RIVER, UPSTREAM, SEGMENT VR-2, BAGAC, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱118.2M | 63% | High risk93 | —-0.001 |
| 4 | 25EF0107CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱42.4M | 76% | High risk86 | Flagged0.005 |
| 5 | 24C00048FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGAC RIVER (VALDEZ BRIDGE), BAGAC, BATAAN (PHASE II) | Region III | Region III | On-Going | ₱94.3M | 93% | High risk81 | —-0.012 |
| 6 | 25CC0170CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE, PUROK 6, BARANGAY SANTA CRUZ, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 32% | High risk81 | —-0.005 |
| 7 | 24CC0164CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BARANGAY POBLACION PUROK 1, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 8 | 24CC0294CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY CAMBAOG-TALAMPAS (PUROK 3), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 9 | 17CL0117CONSTRUCTION OF ONE (1) EVACUATION CENTER AT BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱33.9M | 100% | High risk73 | —-0.062 |
| 10 | 24C00161FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO TRIBUTARY (PINULOT SECTION) TO COLO RIVER, PHASE 2-P, BRGY PINULOT, DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱47.3M | 54% | High risk73 | —-0.008 |
| 11 | 17CB0090REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) EPZA BY-PASS (BARASO COUNTRY RD) - KO158+-140-KO158+340, KO160+300-KO160+540, KO161 | Region III | Bataan 2nd DEO | Completed | ₱68.1M | 100% | High risk72 | —-0.058 |
| 12 | 20CB0011CONSTRUCTION OF FLOOD CONTROL STRUCTURES, TALISAY RIVER, CATMON SECTION PILAR, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱47.8M | 100% | High risk72 | —-0.057 |
| 13 | 24CC0436CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY STO. NINO, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | High risk72 | —-0.076 |
| 14 | 17CA0069CONSTRUCTION OF LAYAC DIVERSION CHANNEL,DINALUPIHAN, BATAAN | Central Office | Flood Control Management Cluster | Completed | ₱62.4M | 100% | High risk72 | —-0.055 |
| 15 | 18CL0010CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL @ TAMBAK RIVER LEFT SIDE (UPSTREAM), BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱92.6M | 100% | High risk71 | —-0.025 |
| 16 | 22CL0010CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱64.5M | 11% | High risk71 | Flagged0.039 |
| 17 | 22CL0044CONSTRUCTION OF STA. CRUZ COASTAL ROAD, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk71 | —-0.019 |
| 18 | 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | Region III | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 19 | 17CB0024NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS ROMAN EXPRESSWAY KO133+292-KO133+600, KO140+813-KO141+437 KO141+472-KO142+094 ORION LIMAY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱37.5M | 100% | High risk70 | —-0.064 |
| 20 | 20A00185LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS, ADAMS (ILOCOS NORTE) - CALANASAN (APAYAO) ROAD | Region I | Region I | Completed | ₱99M | 100% | High risk70 | —-0.067 |
| 21 | 17CA0049NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY, K0116+893-K0118+008ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱29.7M | 100% | High risk70 | —-0.065 |
| 22 | 17CB0097ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE (TERTIARY); REHABILITATION/MAJOR REPAIR OF ROAD SLOPE PROTECTION STRUCTURE-BAGAC-MARIVELES RD-KO152+800-KO152+1020, KO155+200-KO | Region III | Bataan 2nd DEO | Completed | ₱18.7M | 100% | High risk70 | —-0.061 |
| 23 | 21A00181CONSTRUCTION OF MISSING LINKS/NEW ROADS, ADAMS (ILOCOS NORTE)-CALANASAN (APAYAO ROAD), ILOCOS NORTE | Region I | Region I | Completed | ₱12M | 100% | High risk69 | —-0.083 |
| 24 | 17CH0017CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS ANGELES-PORAC-FLORIDABLANCA-D | Region III | Pampanga 2nd DEO | Completed | ₱16.4M | 100% | High risk69 | —-0.067 |
| 25 | 17CH0029CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/WIDENING | Region III | Pampanga 2nd DEO | Completed | ₱17.6M | 100% | High risk68 | —-0.062 |